Download presentation
Presentation is loading. Please wait.
1
Integrate Agile Testing into the Process
CS 577b Software Engineering II -- Introduction 13 June 2018 Integrate Agile Testing into the Process CS 577b Software Engineering II Supannika Koolmanojwong © USC Center for Software Engineering
2
Outline How to integrate agile concept in testing Definition of Done
Acceptance Criteria HW 1
3
Agile Testing Practices
TDD Pair Programming Refactoring Continuous integration
4
Why testing at the end does not work ?
It is hard to improve the quality of an existing product Think about legacy system or existing system Mistakes continue unnoticed Finding a needle in haystack The state of the project is difficult to gauge Difficult to estimate test & fix activities of the developed product Feedback opportunities are lost Testing is more likely to be cut Ref: Mike Cohn – Succeeding with Agile (2010)
5
But !! “it will take too much time to test continuously. We need to be realistic and acknowledge that it’s better to test every fifth or sixth sprint.” When you test less often, it takes longer. Usually these are the cases of manual testing. Then, you should start introducing automated testing. Ref: Mike Cohn – Succeeding with Agile (2010)
6
But !! “it’s more efficient to have testers working one sprint behind the programmers.” If you test one sprint behind, who will you go when you have questions. Efficient for programmer or the team? Ref: Mike Cohn – Succeeding with Agile (2010)
7
What building in quality looks like?
The use of good engineering practices Small hand-offs between programmers and testers Programmer and tester talk about which capability will be added to the product next Tester creates automated tests, programmers code Once both are done, integrate Much test activity on the first day of a sprint Ref: Mike Cohn – Succeeding with Agile (2010)
8
Nine principles Speed requires discipline
Bad shortcuts short term speed Agile does not need Quality Police, but the ones who know acceptance criteria and risks Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
9
Lisa Hendrickson: ttp://testobsessed
Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
10
Lisa Hendrickson: ttp://testobsessed
Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
11
Lisa Hendrickson: ttp://testobsessed
Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
12
Lisa Hendrickson: ttp://testobsessed
Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
13
Lisa Hendrickson: ttp://testobsessed
Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
14
Lisa Hendrickson: ttp://testobsessed
Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
15
Lisa Hendrickson: ttp://testobsessed
Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
16
Lisa Hendrickson: ttp://testobsessed
Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
17
Lisa Hendrickson: ttp://testobsessed
Lisa Hendrickson: ttp://testobsessed.com/wp-content/uploads/2011/04/AgileTestingOverview.pdf
18
Definition of Done Checklist of conditions that must be true
Must be ready before a backlog is pulled into a sprint during sprint planning
19
Sample of DoD Upgrade verified while keeping all user data intact.
Potentially releasable build available for download Summary of changes updated to include newly implemented features Inactive/unimplemented features hidden or greyed out (not executable) Unit tests written and green Source code committed on server Jenkins built version and all tests green Code review completed (or pair-programmed) How to Demo verified before presentation to Product Owner Ok from Product Owner
20
Sample of DoD Code produced (all ‘to do’ items in code completed)
Code commented, checked in and run against current version in source control Peer reviewed (or produced with pair programming) and meeting development standards Builds without errors Unit tests written and passing Deployed to system test environment and passed system tests Passed UAT (User Acceptance Testing) and signed off as meeting requirements Any build/deployment/configuration changes implemented/documented/communicated Relevant documentation/diagrams produced and/or updated Remaining hours for task set to zero and task closed
21
How to build a definition of done ?
Brainstorm What are essential ? Identify non-iteration/sprint artifacts Which one can not be done every iteration? Capture impediments Identify obstacles why a particular artifact will not be available at the end of the iteration Commitment Get a consensus
22
Things to look at Installation build
Pass all automated tests in staging environment Sign Off Pass Audit Installation Documentation Accepted by Operations Release Notes Updated Training Manuals Updated
23
http://www. scrumalliance
24
Acceptance Criteria
25
Acceptance Criteria
26
HW 1 Based on your project artifacts, distribute user stories among your team members Pick three different user stories to write acceptance criteria Pick one test case to write test procedure No two team members will have the same user stories or test case.
27
Example of a Test Case
28
Example of test procedure
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.