Download presentation
Presentation is loading. Please wait.
Published byDiego Reynolds Modified over 10 years ago
1
LHC ACCESS SYSTEM 1 Edms: 856718 LAAWG Status Report – 10th July 2007 P. Ninin, L. Scibile, T. Ladzinski
2
LHC ACCESS SYSTEM 2 Edms: 856718 Dash board – 10 July 07 CableAccess ControlAccess SafetyCommis. Access Points Other Eis Soft & IHM Control Racks SoftHard Loop Power System LHC1Tested +W35 4/6Instal.TestInstal.Dev.Instal. W33-35 L1.8Tested1/1OK-NCDev.InstalledDev.Instal. W33-35 LHC2>W32W28-37 Dev.W28-33Design Deliv.W39-41 LHC3Tested +W32 1/1Instal.Dev.Constr.Design Instal.TBD LHC4OK-NC5/5OK-NC OK TestedOK, NC LHC5Test, CMS? 4/5Instal.TestInstalledOKInstal. TBD LHC6TestInstalInstal.Dev.DesignTBDDesignDeliv.TBD LHC7OK-NC1/1Instal.Test OK V1Test W29-31 LHC8OK-NC4/5OKOK-NCOKOK V1TestOK, NC CCROKCompleted with NCOK TestOKOn-going CCCOKCompleted with NCOK TestOKOn-going
3
LHC ACCESS SYSTEM 3 Edms: 856718 Important points concerning the Exp. Areas. COMMON to all: -Access procedure to the non-interlocked area LHCB -Test after final installation of fences and shielding wall -Patrol procedure -PZ85 renovation ATLAS -SSA: pilot installation in June/July, available in September -Partial commissioning planned W33-35 -PX15 Access Point upgrade CMS -Installation of the remaining access points (UPX56) -Cabling of the Patrol devices in the cavern -Commissioning planned POSTPONED and to be planned! -PM54 Access Point Design & Installation ALICE -W28-W37 installation -W39-W41 commissioning -Work preparation
4
LHC ACCESS SYSTEM 4 Edms: 856718 Actual difficulties New LACS SW version acceptance tests on-going Planning reshuffling -LHC5 installation postponed due to CMS cabling availability end of August -LHC7, LHC1, LHC1.8 functional tests preparation Summer 2007 -TI8 and TI2 tests preparation Meeting the 7 October deadline for LHC2 relies on timely (end July) cabling and manufacturing of grids/doors Team Focus on the Non-conformities follow-up -LACS software -Access point ergonomy
5
LHC ACCESS SYSTEM 5 Edms: 856718 Layout of LHCb in UX85 Area
6
LHC ACCESS SYSTEM 6 Edms: 856718 LHC5 - CMS
7
LHC ACCESS SYSTEM 7 Edms: 856718 ATLAS
8
LHC ACCESS SYSTEM 8 Edms: 856718 ATLAS
9
LHC ACCESS SYSTEM 9 Edms: 856718 LHC2- ALICE
10
LHC ACCESS SYSTEM 10 Edms: 856718 ALICE - Access via PX24
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.