Presentation is loading. Please wait.

Presentation is loading. Please wait.

A Joint Powers Authority of

Similar presentations


Presentation on theme: "A Joint Powers Authority of"— Presentation transcript:

1 A Joint Powers Authority of
SACRAMENTO REGIONAL SOLID WASTE AUTHORITY SWA A Joint Powers Authority of Sacramento County and the City of Sacramento

2 About the SWA Region City of Sacramento 450,000 pop.
County of Sacramento 550,000 pop. Est. 200,000 tons of C&D per year 2004 LTF recommendation: Commercial and C&D Recycling Ordinances Commercial ordinance adopted 2007 C&D ordinances 2009 CalGreen Code 2011

3 SWA Region (continued)
City & County provide residential service Open Franchise system for commercial, including multifamily and drop-box trade 19 Franchisees, 14 exclusively in drop-box or jobsite cleanup business

4 Ordinance development
C&D associated with Building Permits, thus is a Jurisdictional (land use process) issue. City and County would pursue their own ordinances, but builders wanted similar standards & process

5 3 legged stool Facility operators wanted one program to avoid numerous certification processes, looked to the SWA. City ordinance (builders) County ordinance (builders) SWA ordinance (facilities)

6 Standards Development
Businesses in SWA region were being educated in the “list of materials” approach, not the “percent diversion” approach. Took same philosophy to the building sector; when a builder looks in his dumpster, they see materials, not percent signs.

7 Sorting vs. recycling C&D Recycling : Source separated material
Chip and grind wood recyclers Concrete crushers Composters (drywall, wood) Scrap metal yards OCC recyclers C&D Sorting facilities: Mixed recovery Mixed C&D processing

8 California research When researching other experiences around the state for models of facility standards, there were very interesting responses. Unconcerned about the difference 60%, no questions asked regarding whether material recovered in source-separated form or mixed Not diverting; shifting mixed C&D from one landfill to another

9 Numbers and qualities City and County ordinances required recycling of certain materials, just like the Commercial rule which has since served as a model for AB341. SWA rule requires the same of facilities. Wood, metal, OCC, inert materials. 18” CalGreen projects required to be “subjected to the sorting protocols” … STAMP

10 Minimum standards Prerequisites: Application ($500) Annually renewable
Full tier Solid Waste Facility Permit Fully mechanized, elevated sorting line (no dump-and-picks) Application ($500) Annually renewable Terms & Conditions Required Documentation Follow-up and Site Visit Monthly Inspections Audits

11 Structure & process Program email “wastelog@saccounty.net”
Municipal Permit Software – Hauler and Facility selected by builder WMP approval hold and CalGreen Final Hold Automatic s generated to both when permit is issued Facilities can market by a hauler in outreach material

12

13

14

15

16

17

18

19 A note about jurisdictional coordination
Sacramento regional waste shed more isolated than some. SWA dominates region / neighboring jurisdictions follow SWA lead Small but growing need for interjurisdictional coordination (San Joaquin / Placer) Recycling Certification Institute

20 Questions? Contact Dave Ghirardelli (916) 875-4557


Download ppt "A Joint Powers Authority of"

Similar presentations


Ads by Google