Download presentation
Presentation is loading. Please wait.
1
A Joint Powers Authority of
SACRAMENTO REGIONAL SOLID WASTE AUTHORITY SWA A Joint Powers Authority of Sacramento County and the City of Sacramento
2
About the SWA Region City of Sacramento 450,000 pop.
County of Sacramento 550,000 pop. Est. 200,000 tons of C&D per year 2004 LTF recommendation: Commercial and C&D Recycling Ordinances Commercial ordinance adopted 2007 C&D ordinances 2009 CalGreen Code 2011
3
SWA Region (continued)
City & County provide residential service Open Franchise system for commercial, including multifamily and drop-box trade 19 Franchisees, 14 exclusively in drop-box or jobsite cleanup business
4
Ordinance development
C&D associated with Building Permits, thus is a Jurisdictional (land use process) issue. City and County would pursue their own ordinances, but builders wanted similar standards & process
5
3 legged stool Facility operators wanted one program to avoid numerous certification processes, looked to the SWA. City ordinance (builders) County ordinance (builders) SWA ordinance (facilities)
6
Standards Development
Businesses in SWA region were being educated in the “list of materials” approach, not the “percent diversion” approach. Took same philosophy to the building sector; when a builder looks in his dumpster, they see materials, not percent signs.
7
Sorting vs. recycling C&D Recycling : Source separated material
Chip and grind wood recyclers Concrete crushers Composters (drywall, wood) Scrap metal yards OCC recyclers C&D Sorting facilities: Mixed recovery Mixed C&D processing
8
California research When researching other experiences around the state for models of facility standards, there were very interesting responses. Unconcerned about the difference 60%, no questions asked regarding whether material recovered in source-separated form or mixed Not diverting; shifting mixed C&D from one landfill to another
9
Numbers and qualities City and County ordinances required recycling of certain materials, just like the Commercial rule which has since served as a model for AB341. SWA rule requires the same of facilities. Wood, metal, OCC, inert materials. 18” CalGreen projects required to be “subjected to the sorting protocols” … STAMP
10
Minimum standards Prerequisites: Application ($500) Annually renewable
Full tier Solid Waste Facility Permit Fully mechanized, elevated sorting line (no dump-and-picks) Application ($500) Annually renewable Terms & Conditions Required Documentation Follow-up and Site Visit Monthly Inspections Audits
11
Structure & process Program email “wastelog@saccounty.net”
Municipal Permit Software – Hauler and Facility selected by builder WMP approval hold and CalGreen Final Hold Automatic s generated to both when permit is issued Facilities can market by a hauler in outreach material
19
A note about jurisdictional coordination
Sacramento regional waste shed more isolated than some. SWA dominates region / neighboring jurisdictions follow SWA lead Small but growing need for interjurisdictional coordination (San Joaquin / Placer) Recycling Certification Institute
20
Questions? Contact Dave Ghirardelli (916) 875-4557
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.