1 National Hydrology Project
New Delhi

2 NHP – Moving Forward 13 States Pan-India 8 Central Agencies
HP-I ( ) HP-II ( ) NHP INDIA On Going States New States Map not to scale 9 States 6 Central Agencies 13 States 8 Central Agencies Pan-India 10 Central Agencies 2

3 Cabinet Approval Central sector scheme with a total outlay of Rs crore (World Bank’s Loan is 50%) Rs.3,640 crore for National Hydrology Project Rs crore for creation of National Water Informatics Centre (NWIC) Improvements in the following areas are envisaged: Data storage, exchange, analysis and dissemination Lead time in flood forecast Mapping of flood inundation areas Assessment of surface and ground water resources Reservoir operations Design of SW & GW structures 3

4 Vision 4

5 Project Components No. Component Description A
Hydro-met Data Acquisition Systems ~ 44% of project costs Expand and upgrade water resources monitoring and data acquisition systems (including Real time systems) B National Water Resources Information System ~ 14% of project costs Develop and support centralized database management system (NWIC), State-WRIS Water resource data sets, including Remote sensing based information C Water Resources Operation and Management Systems ~ 17% of project costs Develop DSS in selected river basins for Surface & ground water assessment flood forecasting & reservoir operations, Irrigation planning and management D Water Resources Institutional Capacity Enhancement ~ 25% of project costs Capacity building through Establishing & supporting water resources data centres and Centres of excellence Trainings, 5

6 Project implementation strategy
Collaborative Project MoWR, RD&GR shall implement this project through central and state implementing agencies Government Order is being issued. Centre is floating a major consultancy “Technical Assistance & Management Consultancy” Finalisation of specifications and Terms of reference of consultancies, Preparation and evaluation of bids etc. Technical support on project implementation MIS for project monitoring (financial and physical) Training program through NIH/NWA/RGI MoUs with National and International organisations 6

7 Project implementation strategy
National Water Informatics Centre with Accessibility to real time and integrated River Basin information (neatly 100 layers) including high resolution DEM, ET, Weather forecast, historical database. Software and support for development of State-WRIS Sharing of data through CWC’s Earth Receiving Station ‘One Stop’ shop for all hydromet data & applications with cloud storage hence no financial burden to States Provision of linkage with States’ Data Centres Regional River Basin modelling Tools: Flood forecasting and early warning systems coupled with weather forecast Water Resources Assessment at River basin scale. To be upscaled by the States at sub-basin levels 7

8 Project implementation strategy
States need to work in close coordination with MoWR and central agencies to derive maximum benefits by taking the following steps: Set up an SPMU (40 out 49 IAs have already setup) Timely submission of their final PIPs, annual procurement plans, annual work plans Design hydromet network in consultation with MoWR Share all hydromet data with NWIC through India-WRIS/eSWIS/EGEMS/eWQIS) Develop detailed River Basin Models for resource assessment, flood forecasting, flash floods and inundation in the affected areas at sub-basin level. 8

9 Project implementation strategy
Financial management Money cannot be transferred to States’ Treasury IAs would be required to open a Bank Account funds can be transferred directly to IAs IAs would be required to follow laid down procedures for audit (audited UCs and annual audit by CAG) Regularly submit physical and financial progress on the MIS Need to follow World Bank’s Procurement guidelines Financial and procurement manual is being prepared and shall be sent IAs can start preparation of bid documents using Standard bidding documents andspecifications 9

10 Thank You 10