Download presentation
Presentation is loading. Please wait.
Published byGarry Wilkins Modified over 6 years ago
1
Waste Planning Case Studies Exeter Energy from Waste Facility
2
Warming Up the Planning Committee
Political Dimension Policy Context Member Training
3
The Planning Process Transparency Site Visit Site Meeting
4
Addressing the Planning Issues
Traffic and Transportation Issues Air Quality Landscape and Visual Impact Ecology and Appropriate Assessment Flood Risk Noise and Vibration
5
Mitigation – Planning Conditions
landscaping; control of noise and dust; external lighting; a Construction Environmental Management Plan; a Piling Method Statement; hours of working for construction and operational periods; acoustic treatment of the plant; Details of the design of the facility to ensure that it will not be damaged by flooding; the archaeological survey and recording of the site; the materials to be used in the construction of the plant building; no operation of the plant until a contingency plan is in place in the event of breakdown or closure to deal with the waste material delivered to the site
6
Legal Agreement Use of Wastes Arising from Exeter Area only
Use of Waste heat Incinerator Bottom Ash Travel Plan
7
Delivering the Development
Discharge of Planning Conditions Non Material Amendments Site visits during construction from Committee Liaison Group set up before construction
8
Lessons Learnt?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.