1 Jack Fowler Duke University Spain Workshop - 2003
Duke Modules Final QA Jack Fowler Duke University Spain Workshop

2 Final Mechanical Completion Steps
Stringing – HV and Tension Test All wires draw less than 10 uA at 1.7 kV in room air Tension 128 to 170 Hz Complete through M2.36 and ~ 800 wires left to string Ground Wire Solder to Tension plate and epoxy to shell Complete through M2.34 and 3.30 Sealing Modules Seal all eyelets and fill all shell holes with epoxy Complete through M2.33 Dimension Test Module fits length and stay clear fixtures. Module Weight Completed as modules are shipped to Hampton University Jack Fowler Spain Workshop 2003

3 Final QA Testing HV Testing /Current prior to Signal Test
Ar-CO2 and Air All wires hold 1600 V Currents typically 200nA Complete thru M2.30 and 3.30 Ionization Leak Test Current spec < 1 mbar /bar/min Old Spec < 0.1 mbar/bar/min Complete thru M2.25 and 3.28 Purging Volume Leak Test < 200 mbar/bar/min Signal Test Ar-CO2 at 1550 V Complete through 2.30 Jack Fowler Spain Workshop 2003

4 Module Weight Type 2 Modules Type 3 Modules
Average weight = 4260 grams Sigma = 48 grams Type 3 Modules Average weight = 6492 grams Sigma = 57 grams Jack Fowler Spain Workshop 2003

5 Ionization Leak Test Results
Jack Fowler Spain Workshop 2003

6 Purging Volume Leak Results
Jack Fowler Spain Workshop 2003

7 Mechanical and HV Discrepancies
Capacitor barrel leaks 4 modules Cooling sleeve tears 3 modules Shell extending beyond boundaries 17 modules HV Trips (to neighbor groups) 10 modules Shorted HV Groups to each other 4 modules (but none to Shell!!!) Jack Fowler Spain Workshop 2003

8 Wire/Straw Discrepancies
Wire shorted to straw Wire impossible to string Wire left inside straw Straw leaks Noisy wires at Signal Test Socket/Eyelet not connected Wire anomaly from Gain Map Jack Fowler Spain Workshop 2003

9 Wire/Straw Status “DEAD” straw
Cannot hold HV Leak Impossible to string “REMOVED” but can be restrung and tested at CERN 154 “AS IS” but will be retested or restrung at CERN 154 Jack Fowler Spain Workshop 2003

10 Module 2.20 Jack Fowler Spain Workshop 2003

11 Module 2.23 Jack Fowler Spain Workshop 2003

12 “AS IS” Wires and Straws
Jack Fowler Spain Workshop 2003

13 “REMOVED” Wires and Straws
Jack Fowler Spain Workshop 2003

14 “DEAD” Wires or Straws Jack Fowler Spain Workshop 2003

15 Summary of Modules All modules are functional
No major defects on any of the modules 0.56 % of the straws have any issues, as is, removed and dead (107 out of 19071) 0.13 % are Dead leaving DUKE (25 out of 19071) All will be complete and shipped to Hampton in 2003! Jack Fowler Spain Workshop 2003