2 A whole new corridor of connectivity
Connecting Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer Currently, only 2 roads of connectivity between Delhi and Gurgaon-MG Road and the NH8 Not enough to tackle the heavily increasing traffic of daily commuters between Delhi and Gurgaon

3 A whole new corridor of connectivity
With Dwarka Expressway, connectivity becomes smoother, faster and so much easier! IGI airport - a mere 2.5 kms away Also bridges the gap between 16 new Residential Sectors

4 The changing face of Gurgaon
And this is how Gurgaon will soon look, when the Expressway opens up

5

6 A catalyst of change and development
Planned around a world of opportunities and development Dwarka Expressway marks the beginning of a golden era in real estate Acts as a new channel of business and commerce between Delhi and Gurgaon World-class infrastructure and facilities to transform lives of residents and investors

7 Years of thought and planning
A result of years of planning, research and development by the best brains in real estate Aided by experts and top professionals in the Corporate and Government sector, a range of exciting projects in the residential and commercial space are already underway

8 No more toll! No more delays!
No more toll for commuters between Delhi and Gurgaon! No more delays and traffic jams at the toll gate on NH8! All thanks to the toll plaza moving beyond Manesar shortly

9 Power cuts are history From power-shortage to power-surplus, Haryana’s power supply improving massively 4 new power plants have been set up by the Haryana Government Power generation capacity of the state has increased from 1587 MW to 5800 MW in the last 5 years

10 Exciting opportunities in Education
Reputed educational institutions flocking to areas surrounding the Expressway MatriKiran School under construction Modern School opening a branch in Sector 91, Gurgaon Other well-known schools of Delhi are currently looking to expand on this stretch

11 Boom in Healthcare Nationally and internationally famous healthcare organizations setting up branches around the Dwarka Expressway Reputed names in healthcare have/in process of finalizing Dwarka Expressway as the location of establishment

12 All this adds up to making the Dwarka Expressway a new hub of exciting developments in real estate and the Golden Road!

13 The widest road in the NCR
18 kms long and 150 mtrs wide, with 60 mtrs of greenery on both sides, the Dwarka Expressway is 2x that of the NH8 14 kms out of the 18 kms is already constructed

14 The double yellow line indicates the constructed expressway
Constructed means black-topped and driveable From Delhi Dwarka Expressway The double yellow line indicates the constructed expressway From Haryana

15 Gurgaon - Manesar Urban Complex - 2025 AD

16 The Expressway today: The remaining 4 kms
800 mtrs handed over to Indian Railways for construction of Rail over-bridge, with HUDA paying Railways Rs. 38 Crores in advance already (Expected Completion Time: 16 months) 700 mtrs under various HUDA utilities such as HT pillars and water works which HUDA is in the process of shifting (Expected Completion Time: 6 months) The balance 2.5 kms – has been resolved

17 The latest on the 2.5 kms under stay order
On , HUDA announced a rehabilitation policy which was published in the Times of India

18 As Per Policy Published on 30.09.13
People with built up homes / structures are being offered alternative plots in Sectors 110A and 37C The plots on offer are of the same size as the plots being taken over HUDA has already acquired 145 acres in the above 2 Sectors for this purpose Only 15 acres required to re-settle all the petitioners As Per Policy Published on

19 As Per Policy Published on 30.09.13
Applicants had till to apply under this policy HUDA has received applications from 80% of the residents on this stretch and is sorting them out All petitions expected to be resolved under this process in the next 3-4 months

20

21 Status Constructed/ NOT
Actual availability of stretches (As per Actual Site condition) S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over From To 1 468 Not Executed Built up Area - 2 750 282 Executed End of Dec 11 3 765 15 May-13 4 900 135 Dec-11 5 960 60 6 2000 1040 End April 11 7 2050 50 8 2070 20 9 2120 Clear WMM II Completed Mid August 13 10 2170 Stay on Land 11 2260 90 12 3350 1090

22 Status Constructed/ NOT
S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over From To 13 3350 3370 20 HSIIDC drain 14 3400 30 Executed Jan-13 15 3975 575 Reliance SEZ land 16 4100 125 Feb 12 17 4300 200 18 4315 Pataudi Road 19 4425 110 4500 75 End April 11 21 6620 2120 22 7800 1180 Not Executed/ROB ROB, Padmini Factory, stay on land 23 8285 485 Mid Sep 11 24 8345 60 Not Executed HUDA water sump house 25 8750 405

23 Status Constructed/ NOT
S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over From To 26 8750 8800 50 One side executed RHS stay on land 27 9820 1020 Executed Mid Oct 11 28 9900 80 Not Executed STP Channel 29 10800 900 Water logged area completed Last week of Jan 13 30 11700 end April 11 31 11760 60 32 12850 1090 33 12900 Feb-13 34 13000 100 Nipon Factory 35 13060 36 13400 340 Nov-11 37 13520 120 38 13650 130 39 13700 Clear Slab approach is to be coming

24 Status Constructed/ NOT
S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over From To 40 13700 13780 80 Slab culvert over sewer channel is in progress by another contractor Work is stopped from last 2 month i.e on 6th Sep 2013 41 14320 540 Executed 42 14900 580 Clear WMM 1st layer completed 43 15300 400 Not Executed New Palam Vihar – R&R 44 15600 300 45 16000 46 16740 740 47 18035 1295 01-Mar 14092 Clear Stretch 14,092 mtrs.

25 Dwarka Expressway: The Delhi update

26 Dwarka Expressway: The Delhi update
Thanks to DDA’s efforts, all issues related to land acquisition on Delhi side, resolved Remaining stretch of less than a Km to be ready within the next 6 months

27 All obstacles soon to vanish
All land issues on Delhi side resolved All issues pertaining to 2.5 kms on Gurgaon side soon to be resolved (Expected Timeline – January’2014) Soon, no more obstacles preventing investing in the Golden Road!

28 (Average rate per sq ft)
Strike while hot! (Average rate per sq ft)

29 Besides, the best developers are building here
Some of the best and most trusted names in real estate singling out the Dwarka Expressway as the preferred location for various visionary projects Residential or commercial, most of these projects in full swing and nearing completion

30 Glimpses of the Expressway

31 Glimpses of the Expressway

32 The golden road beckons