Download presentation
Presentation is loading. Please wait.
1
IGG Agenda – 29th November 2007
Minutes from last IGG meeting – 10.10 Review of Action Items – 10.20 CER Update – 10.30 Gemserv Update – 10.40 Market Operations Update – 10.50 Networks SEM Update – 11.20 Retail Market Design Service Update – 11.30 Market Design Update – 11.40 Next Steps – 12.00 1
2
Minutes Minutes from IGG meeting – October 18th 2007 2
3
Action Items Actions Addressed in Advance of Meeting
Update on Action Items Actions to be covered during remainder of presentation Actions to be carried forward Other Action Items 3
4
Action Items addressed in advance of meeting (closure proposed)
To address at a future IGG (to be specified) E. Barr’s query about the implications of a potential future change to DST. 4
5
Action Items addressed in advance of meeting (closure proposed)
Use the Transactional Code Change Requests template to document request for 10 (plus 6) new Meter Category Codes Action Item 148 Participants to communicate to RMDS any problems with messages arriving in the in the incorrect order or not at all Action Item 150 Receive feedback on DR 126 Changes to ARIS Data Definitions by the next Conference call 5
6
Action Items addressed in advance of meeting (SEM Cutover Actions - closure proposed)
SEM to advise participants on the status of the Extranet upgrade Action Item 162 Participants to install Release 14.0 of the MPCC and Webforms on their test MPCCs by Tuesday 23rd October Action Item 163 Participants to feedback comments on the percentages to be used for the SLA for Actual/Estimate Flag on Aggregation messages by cob 22nd October Action Item 164 Carry out a ‘go-live’ Data Verification exercise with Retail Market Participants 6
7
Action Items addressed in advance of meeting (SEM Cutover Actions - closure proposed)
Update cutover personnel by and text on Sunday 28th, as to the progress of the SEM cutover. Action Item 168 Reissue the RMDS Approach to Cutover document with updated tasks and timings. 7
8
Action Items to be covered later in the presentation
Give feedback on the impact the introduction of this new Universal Meter Category Code, has on the Change of MCC and Meter Reading processes Action Item 160 Send KPMG Confidentiality Agreement to participants 8
9
Action Items to be covered later in the presentation (Market Design)
Issue note to participants requesting feedback on the versioning of the 341 market message Action Item 173 Update the SoLR process to take account of the SoLR decision paper /07/171 9
10
Update on Action Items Action Item 7 (& Action Item 92) – RMDS to investigate the procedural issue whereby a duplicate MPRN is generated when a quotation is ‘rolled back’ Working Practice 13 has been issued by RMDS on 2nd November Note that WP will be amended to clearly state that no de-energisation messages will issue Feedback received 10
11
Update on Action Items Action Item 41 – Raise a DR to propose the initiation of the updates to the Central Market Systems of a QH to QH meter replacement at the same time as the MV90 is updated Working Practice 16 has been issued by RMDS on 22nd November Feedback awaited 11
12
Update on Action Items Action Item 95 – Investigate the possibility of addressing inconsistencies between the DUoS rules and the MICs and DUoS Groups in the MPRN data. ESBN (Commercial) are preparing a proposal for submission to CER. Some figures are in the Table below: 1 Broadly equivalent to QH threshold 2 Broadly equivalent to MIC 50kva 3Broadly equivalent to MIC 30kva 12
13
Update on Action Items Action Item 108 (& Action Item 159) – Issue Data Storage and Archiving Document to Market Participants Originally issued on Thursday 22nd November and subsequently withdrawn Updated version will be re-issued shortly 13
14
Update on Action Items Action Item 117 – All Retail Market Participants who intend to use the QH Readings Processor software after SEM go-live should notify RMDS before July 26th Formal issued to all MPs on 14th November 2007 All relevant Market Participants have responded confirming that the software is not in use at their sites Next Steps: RMDS to propose formal de-commissioning of software to CER 14
15
Update on Action Items Action Item 131 – Establish the current status of the postcode proposals Position unchanged since last IGG Propose to close this item 15
16
Update on Action Items Action Item Review the ‘28 open issues’ from the Issues Log at the next conference call 16 open issues Long standing request to MPs to review Issues Log, no responses received so far Next steps ? 16
17
Update on Action Items Action Item 153 – Give a progress report on Year End Arrangements at the next IGG Originally issued on 22nd November and subsequently withdrawn Settlement calendar awaited from SMO 17
18
Update on Action Items Action Item 156 – Update on ‘Universal Meter’ (3 register meter) Awaiting outcome of Support Centre analysis. The likely approach is: Conventional MCCs will be used i.e. 24hr. or Day/Night The MCC requested will appear on the service order. At new connection, the NT takes the appropriate readings and completes the service order. ESBN will do a development to ‘force’ the meter characteristics into the relevant mode at completion in database depending on the MCC. The Meter Reader will ‘see’ only the relevant registers on his/her handheld. 18
19
Update on Action Items Action Item 156 – Update on ‘Universal Meter’ (3 register meter) (contd.) Change in MCC Conventional MCCs will be used i.e. 24hr. or Day/Night The MCC requested will appear on the service order. The NT takes the appropriate readings and completes the service order. On completion in database, the meter characteristics into the relevant mode depending on the MCC. The Meter Reader will ‘see’ only the relevant registers on his/her handheld. Will update at next IGG. 19
20
Update on Action Items Action Item 165 – RMDS to raise the issue of meter roll-overs with ESB Networks Examples of this problem provided to the Data Collector Reply awaited 20
21
Update on Action Items Action Item 166 – Raise a Discussion Request to prevent the use of estimate reads for a Change of Supplier Draft DR 0152 issued to originator for review 21
22
Update on Action Items Action Item 169 – Examine preventative measure with the message reconciliation and resending processes to ensure there are no exceptions over the Christmas period A process of cross checking by both parties involved in this manual process was introduced when a problem was originally identified back in July This process will be ongoing 22
23
Update on Action Items Action Item 174 – RMDS to Advise IGG of assurance measures to detect issues with future schema changes by IPT stage In the future, the Hub team will carry out extra tests prior to the issue of a new draft schema using a software tool: a compare between the live schema and the new schema to ensure that the only differences are those covered by MCRs To validate a sample of real XML messages against the draft schema Incorporate dependency for sign-off on completion of internal Regression Testing in advance of commencement of IPT 23
24
Action Items to be carried forward
Action Item 24 (& Action Item 75) – DR New MPD 37 New Transmission Connected Sites Meeting has been arranged to finalise the proposed changes to MPD 37 24
25
Action Items to be carried forward
Action Item 39 – To get information on the volumes of readings that are currently rejected because they are outside of the tolerance ranges for the different DGs In progress 25
26
Action Items to be carried forward
Action Item 109 – New Commercial Policy required to cover Erroneous De-registrations Draft Commercial Policy under discussion in ESB Networks 26
27
Action Items to be carried forward
Action Item 10 – Prepare proposals on addresses in the Retail Market Deferred until after SEM go-live at the request of the IGG 27
28
Action Items to be carried forward
Action Item 88 – Organise TAG meeting in Jan/Feb 2008 to discuss MPCC architecture Deferred until January at the request of the IGG Action Item 89 – RMDS to contact NIE to discuss the EMMA architecture Will be addressed in advance of January IGG 28
29
CER Update 29
30
Gemserv Update 30
31
Recalculation of Estimates
Existing Recalculation only where present less than previous Only as far back as present ceases to be less than previous Proposed Recalculation of all estimates, subject to a significance threshold DUoS tariff change flag Actual Reading 2 Actual Reading 1 Estimates A1 E1 Time E2 E3 A2 Consumption History with Estimates 31
32
Market Operations Update
32
33
Retail Electricity Market Issues Update
Cormac Madden, RMDS 33
34
Retail Electricity Market Issues Log
Log continuing to issue on a weekly basis Summary Statistics (as per last release – ) Total Number of Issues Logged Total ‘Closed’ Total ‘In Progress’ Total ‘Being Monitored’ Total ‘Logged’ Total Raised Since Last Issue Total Closed Since Last Issue 34
35
Retail Market Design Service Update
C. Madden, RMDS 35
36
Retail Market Design Service Update
ESB Networks SAP-ISU outage on 18th November 2007 ARIS software upgrade 36
37
Retail Market Design Service Update
ESB Networks SAP-ISU outage on Sunday 18th November 2007 ESB Networks SAP-ISU and ESB Customer Supply SAP-ISU are separate applications with separate data stores running on separate processors but located within a single cabinet and sharing the power supply and other services Unusually, this outage involved the common power supply (memory upgrade to ESBCS SAP) A gap in the outage agreement procedure meant that ESBN did not agree to the outage prior to its announcement. ESBN has taken this incident up with its IT service provider and clarified the market impact A formal procedure has now been implemented to secure prior agreement by the ESBN designated SLA holder to all future planned outages 37
38
ARIS Upgrade Successful upgrade of ARIS software last week
About to launch new web features Improved Interface Increased Model Information Zooming and Full-Screen Mode Printing to PDF Simple Report Online Help 38
39
39
40
Discussion Requests & Market Change Requests
Susan Morrissey, RMDS 40
41
Market Change Request MCR Amending Generator Unit ID and Generation Unit ID Circulated on 31/10/07 No Feedback received Approval Requested 41
42
Market Change Request MCR 158 – Changes to ARIS Data Definitions
MCR circulated on Thursday 22nd November Approval requested 42
43
Discussion Request DR Proposal to add Acceptance, Completion and Cancellation messages to Meter Works design Feedback from one participant raised issues about the process for cancellation of Meter Works/De-energisations/Re-energisations Further internal ESB Networks discussions ongoing Valid ‘cancellation’ codes will be added to 131 message when the DR is re-circulated (Action Item 70) 43
44
Market Change Request MCR 0154 – Versioning of the 341
Propose to rename the MCR from ‘Versioning of the 341’ to ‘Versioning of the Meter Data on the 341 Market Message’ Question raised – How will the MCR handle version numbers for import and export data Proposed Solutions for MCR 154 Solution 1 Provide a separate Version Number at the MPRN level for Import and Export data and a read replacement flag at the Channel Level Details which would indicate the channel being updated. Solution 2 Provide a Version Number at the channel level. This would mean that the Import QH kW, Import QH kVAr, Export QH kW and the QH Export kVAr would each have a version number. The Read Replacement Flag would no longer be required as the version would indicate the reading being replaced. Longer term raise a new DR to build a new message 342 for Export data only and use 341 for import data only. 44
45
Market Change Request DR 0113 Supplier of Last Resort Update
The Supplier of Last Resort Decision (SoLR) CER/07/171 has impacted the Market Design Process in the following ways: No. CER 07/171 Impacts on MPD 4 SoLR Process 1. The Defaulting Supplier is given an undisclosed amount of time to rectify the issue. (This was previously a 5 day rectification period). 2. MRSO will supply the SoLR with the percentage market share of the defaulting supplier, within 1 working day of the Suspension Notice in the wholesale market. 3. The SoLR Supplier Unit is sent to the Market Operator. 4. The SoLR contacts affected customer within 5 working days of the SoLR Direction. Customers then have 14 working days to choose an alternative supplier at the end of the 5 day Contact period. 45
46
Market Change Request DR 0113 Supplier of Last Resort Update
Issues still outstanding The content of the CSV file to be issued to Suppliers and the SoLR. How to handle MPRNs which are not currently practical to send in on an 010, for example, denergised sites, sites with meter works in progress etc, The creation of a SoLR sub process to handle SoLR exceptions plus the interactions between ESB Networks and the SoLR along with issues such as disputed reads. 46
47
Prioritisation of MCRs/DRs for next schema release
Top MCRs/DRs DR Proposal to add Acceptance, Completion and Cancellation messages to Meter Works design MCR Addition of New Market Message for the Provision of Reconciliation Data MCR Decouple Connection Agreement requirement from Change of Supplier where MIC >=100kVA and there is no Change of Legal Entity 49
48
Next Steps Proposed Diary dates for subsequent meetings
(Note: there will be a TAG meeting afterwards with a designated start time, covering the MPCC strategy) – to be confirmed – to be confirmed 51
49
Next Steps Propose to continue with conference call every two weeks – proposed dates – Proposed date (note: 27th December call cancelled!) Call details have new contingency PIN No: Number: PIN : Contingency number remains: New PIN: 80490 52
50
Thank You 53
Similar presentations