1 FREE STATE DEPARTMENT OF HUMAN SETTLEMENTS N MOKHESI 20 June 2017
Final 2017/18 HSDG Business Plan Presentation to the Portfolio Committee on Human Settlements N MOKHESI 20 June 2017

2 PRESENTATION OUTLINE Executive Summary
Graphic Presentation on Budget Split Summary Of Planned Targets: 2017/18 Regional Breakdown Of Planned Targets Provincial Summary Of Project Readiness Title Deeds Programme Planned Targets Per Programme Revitalisation Of Distressed Mining Communities Catalytic Projects Other Programmes Informal Settlements Summary Bulk Infrastructure Projects Accruals from 2016/17 Business Plan Concluding Remarks

3 EXECUTIVE SUMMARY National HSDG allocation = R Mil vets Top up funding (Expected) = R Prov. Mil Vets Top up funding = R Provincial funding = R THE OVERALL BUDGET FOR THE PROVINCE IS = R Sites (6 848) = R Units (5 395) = R Title Deeds: Backlog (36 919) = R OPSCAP = R LAND ACQUISITION = R ACCREDITATION = R NHBRC (Geo Tech) = R

4 EXECUTIVE SUMMARY The Department will be constructing units as follows: Financial Intervention = 350 units Incremental Housing = Units Mil Vets = 199 units Social & Rental Housing = units Rural Housing = 153 units Provincial Specific = 39 units The department will also be servicing sites UISP = IRDP =

5 GRAPHIC PRESENTATION ON BUDGET SPLIT
5

6 TOTAL REGIONAL ALLOCATIONS Units = 5 395 Sites = 6 848 Deeds = 36 919
Budget = R Units = 617 Sites = 1300 Deeds = 8 537 Budget = R Units = 1 230 Sites = 550 Deeds = Budget= R Units = 206 Sites = 0 Deeds = 3 171 Budget= R Units = 2 649 Sites = 1 445 Deeds = 9 024 Budget = R TOTAL REGIONAL ALLOCATIONS Units = 5 395 Sites = 6 848 Deeds = Budget = R 6

7 SUMMARY OF PLANNED TARGETS: 2017/18
Total Sites Budget for Sites Total Units Budget for Units Budget for Other Programmes Total Allocation per programme UISP 6 514 R 1 859 R R R NEW INDIVIDUAL UNITS (EXL. RURAL) 334 R 1 651 R R R CRU (CONSTRUCTED) 812 R R R SOCIAL AND RENTAL HOUSING R76 384 411 R R R FLISP 300 R RURAL HOUSING 153 R R R TOTAL 6 848 R 5 186 R R R MILITARY VETERANS 15 R 199 R  R TITLE DEEDS BACKLOG ERADICATION 36 919 R TITLE DEEDS (NEW DEVELOPMENTS) 4 019 R LAND ACQUISITION R

8 REGIONAL BREAKDOWN OF PLANNED TARGETS
REGION/ DISTRICT MUNICIPALITY Total Sites Budget for Sites Total Units Budget for Units Budget for Other Programmes Total Allocation per programme FEZILE DABI 3 553 R 693 R R R LEJWELEPUTSWA 1 200 R 617 R R R MANGAUNG 1 445 R 2 649 R R R THABO MOFUTSANYANE 550 R 1 230 R R R XHARIEP R 206 R R R Grand Total 6 748 R 5 395 R R R

9 PROVINCIAL SUMMARY OF PROJECT READINESS
LEGEND Project Ready for construction /Contractor & PRT on Site Projects require SCM, Process dealing with contracts and IPW’s Projects under Planning (No sites) Provincial (All Projects) Sites Units Budget % of Total HSDG budget allocation 179  1416 4831 65% 36 5432 31% 33  906 4% Total 6848 5737 100% Projects Revitalization of Distressed Communities Sites Units Budget % of Total budget allocation 1315 477 R 100% % Total 315 100 Catalytic Projects Sites Units Budget % of Total budget allocation Caleb Motshabi  1 416  R 82% Baken Park Ext 6 & 7 190 R   12% Sasolburg Properties  R 6% Total 1 606 R   100%

10 % of Total budget allocation
TITLE DEEDS Pre 1994 Post 1994 Budget % of Total budget allocation Deeds for conveyancing 780 29 273 R 46% Beneficiaries to be confirmed R 34% No of Title Deeds in Township Establishment Processes 6 866 R 20% TOTAL 36 919 R 100%

11 ATTENDANCE OF TITLE DEEDS PROVINCIAL STEERING COMMITTEE MEETINGS
The Department held a Provincial Steering Committee on the 29 March 2017. All Municipalities that attended made a commitment to work together in achieving the targets set. 9 Local Municipalities and 1 Metro attended this meeting as compared to only 3 that used to attend these meetings. The Provincial Departments of Cooperative Governance, Traditional Affairs and Public Works are going to be part of the steering committee and this is going to assist with easy transfer of properties owned by Public Works to Municipalities and further fast-tracking registration of title deeds in the names of Beneficiaries. The next provincial steering committee meeting is on the 22nd June 2017. The National Steering Committee meeting is scheduled for the 4th July 2017.

12 SIGNING OF DEEDS DOCUMENTS
The Department has assigned an official (Senior Legal Admin Officer) to attend to all complaints received from Conveyancers with regard to the non-cooperation and/or delay caused by Municipalities in signing the deeds documents. The official visit all Municipalities and Conveyancers once every week. Municipalities are signing documents within ten days of receipt from conveyancers. The Department has noticed a steady improvement in the number of title deeds registered in this regards.

13 PLANNED TARGETS PER PROGRAMME
MTSF PICTURE PER PROGRAMME Total Sites Budget for Sites Total Units Budget for Units Budget Other Total Allocation per programme UISP TOTAL 6 514 R 1859 R R R 2.2b IRDP: Phase 1:Planning and Services INFORMAL SETTLEMENTS R R R 2.2d IRDP: Phase 2:Top Structure Construction INFORMAL SETTLEMENTS 106 R R54 600 R 2.2e IRDP: Phase 4:Top Structure Construction (INFORMAL SETTLEMENTS) 1753 R R R 2.3b People's Housing Process INFORMAL SETTLEMENTS 2.4 Informal Settlement Upgrading NEW INDIVIDUAL SUBSIDIES TOTAL (EXCL. RURAL) 334 R 1 651 R R R 1.1a Individual housing subsidies (R0 - R3 500) credit linked 50 R 1.1b Individual housing subsidies (R0 - R3 500) Non - Credit Linked 2.2a IRDP: Phase 1:Planning and Services 219 R R R R 2.2c IRDP: Phase 2:Top Structure Construction 115 R 1 451 R R R

14 PLANNED TARGETS PER PROGRAMME
MTSF PICTURE PER PROGRAMME Total Sites Budget for Sites Total Units Budget for Units Budget Other Total Allocation per programme 2.3a People's Housing process 150 R R R 2.5a Consolidation Subsidies (Excluding Blocked Projects) SOCIAL AND RENTAL HOUSING INCLUDING CRU TOTAL R76 384 1223 R R R 3.1 Institutional Subsidies 411 R R R 3.2b Social Housing: Capital Grants for rental housing (Funded by NDoH) 3.3b Community residential units (CRU) Constructed 812 R R R RURAL HOUSING TOTAL 153 R R R 4.1 Farm Worker Housing Assistance R 4.2 Rural Housing: Communal land rights R R 1.2 FLISP 300 R

15 PLANNED TARGETS PER PROGRAMME
MTSF PICTURE PER PROGRAMME Total Sites Budget for Sites Total Units Budget for Units Budget Other Total Allocation per programme 5. PRIORITY PROJECTS (New opportunities: sites & units) 6. PROVINCIAL SPECIFIC PROGRAMMES (New opportunities: sites & units) 39 R R SUB-TOTAL NATIONAL MTSF TARGET 6 848 R 5 225 R R R Emergency Housing Programme (new units) 170 R R GRAND TOTAL 5 395 R R

16 PLANNED TARGETS PER PROGRAMME
PROGRAMMES FOR MINING TOWNS Total Planned Sites Budget for Sites Total Planned Units Budget for Units Total Budget Allocation per programme Military Veterans 15 R 199 R R Title Deeds Backlog (Pre-1994) 780  R Title Deeds Backlog (Post-1994) 36 139 R Title Deeds (New Developments) 4 019 R 1.11a Land parcels procured(IHAHSD) Acquired R Released Rezoned

17 REVITALISATION OF DISTRESSED MINING COMMUNITIES
PROGRAMMES FOR REVITALISATION OF DISTRESSED MINING COMMUNITIES Total Planned Sites Budget for Sites Total Planned Units Budget for Units Total Budget Allocation per programme MOQHAKA LOCAL MUNICIPALITY  Incremental 15 R 153  R   R Social & Rental R   R Title Deeds Backlogs 454  R R   TOTAL 607 R R MATJHABENG LOCAL MUNICIPALITY 1 300 R 324 R R R 2 497 R 477 R R

18 CATALYTIC PROJECTS Total Planned Sites (2017/18) Budget for Sites
PROJECT NAME Total Planned Sites (2017/18) Budget for Sites Total Planned Units (2017/18) Budget for Units Total Budget Allocation per programme Caleb Motshabi 1 416  R   Baken Park Ext 6 & 7 190  R   Sasolburg Properties R   TOTAL 1 606  R R  

19 Total Budget Allocation
OTHER PROGRAMMES Other programmes Total Planned Sites Budget for Sites Total Planned Units Budget for Units Total Budget Allocation PROGRAMMES REQUIRING MINISTERIAL APPROVAL 39  R   R SOCIAL HOUSING 411 R PROGRAMMES REQUIRING DETAILED REPORTS OTHER (NHBRC, Land Acquisition OPERATIONAL SUPPORT, ACCREDITATION ) R   DISASTER MANAGEMENT TOTAL 450  R   R

20 PROVINCIAL TARGET TO FORMALISE OR ERADICATE INFORMAL SETTLEMENTS
LEGENDS: No Infomal Settlements No Households FEZILE DABI DISTRICT DM 24 13,405 LEJWALEPUTSWA DM 43 10,605 MANGAUNG METRO 28 28,419 THABO MOFUTSANYANA DM 35 14,754 XHARIEP DM 13 1,854 TOTAL 143 69,037

21 INFORMAL SETTLEMENTS SUMMARY
Free State recorded a total of 143 Informal Settlements. 41 Household enumeration/settlement profiling conducted in Matjhabeng, Moqhaka, Metsimaholo, Maluti-a-Phofung; Dihlabeng Local Municipalities as well Mangaung Metro with the aim to provide the status quo and situation for each informal settlement 47 Resettlement plans have been concluded in all NUSP Municipalities ISU chapter of Municipal Housing Sector Plan concluded in 14 of the 20 Municipalities

22 ROAD TO UPGRADING OF INFORMAL SETTLEMENTS
75 Informal Settlements are currently undergoing planning and Survey Township Establishment processes have been completed in 33 informal settlements and have been included in the pipeline for provision of basic Municipal engineering services; Installation of basic engineering services is currently underway in 14 Informal Settlements;

23 Bulk Infrastructure Projects
Project Number (HSS) Project Name/Description Type of Bulk infrastructure  Local Authority under which it falls Total Annual Budget F /1 Infrastructure Monyakeng Wesselsbron: internal Sewer and Water (1000 sites)  Sewer Pump Station NALA LOCAL MUNICIPALITY R F /1 Infrastructure Phahameng Bulfontein: internal Water And Sewer (832 Sites ) TSWELOPELE LOCAL MUNICIPALITY R F /1 Infrastructure Thaba Phatswa: oxidation Ponds Oxidation Ponds MANTSOPA LOCAL MUNICIPALITY R TOTAL R

24 PAYMENT OF CONTRACTORS

25 THANK YOU