Download presentation
Presentation is loading. Please wait.
Published byDulcie Paul Modified over 6 years ago
1
OP 19b: Manufacturing to a Medical Practitioner’s Prescription
Issue /06/2009 OP 19b: Manufacturing to a Medical Practitioner’s Prescription – Specialist Mechanical Workshop Rehabilitation item Item requirement Item required by Practitioner (e.g., Doctor, Physicist, Occupational Therapist, External Organisation) Is there another unacceptable restraint (e.g., lead time)? Is the item available elsewhere? Does the available item require modification? Source item elsewhere Yes No No No Yes Yes Practitioner to complete a Medical Practitioner’s Prescription (e.g., Mechanical Section Job Request 3) OR supply details which will be entered into a Medical Practitioner’s Prescription by responsible Technologist/Team Leader Review with Practitioner and clarify on Prescription Are the details clearly defined/ comprehensive? Has the Team Leader been consulted? Consult Team Leader if appropriate to manufacture. Team Leader to carry out Risk Assessment if applicable. No No Yes Yes Generate Rehab Quotation IF APPLICABLE TO CROSS CHARGE and agree costs/timescales Manufacture item and present to Practitioner for inspection Is manufactured item acceptable for use? Rework item until satisfactory OR refer back to Practitioner that item cannot be manufactured No Yes Practitioner to sign Prescription* ( + Chargeable Work Form/Acceptance Note if applicable) to accept item. Technologist to file documentation (and pass charge to Finance Dept. if external request) Technologist to log item in Asset Database (if Asset No. applicable) * Any Risk Assessment documentation to be reviewed with and copied to Practitioner Issue 2: 14/09/09
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.