Presentation is loading. Please wait.

Presentation is loading. Please wait.

PBN Performance Based Navigation

Similar presentations


Presentation on theme: "PBN Performance Based Navigation"— Presentation transcript:

1 PBN Performance Based Navigation
Concept & Change - ICAO Performance Symposium March 2007 Federal Aviation Administration Presented by: Lex Hendriks, EUROCONTROL

2 Elements of PBN Concept
NAVIGATION APPLICATION 3 3 NAVIGATION SPECIFICATION 2 2 NAVAID INFRASTRUCTURE 1 1

3 Elements of PBN Concept
NAVIGATION APPLICATION 3 3 NAVIGATION SPECIFICATION 2 2 NAVAID INFRASTRUCTURE 1 1

4 Elements of PBN Concept - Navaid Infrastructure -
Ground-based Navigation Aids (Navaids) VOR; DME; (Not NDB) Space-based Navaids GNSS GPS; Glonass; future Galileo NAVAID INFRASTRUCTURE 1 2

5 Elements of PBN Concept
NAVIGATION APPLICATION 3 3 NAVIGATION SPECIFICATION 2 2 NAVAID INFRASTRUCTURE 1 1

6 Elements of PBN Concept - Navigation Specification -
International Navigation Specifications published in Volume II of PBN Manual Aim is to limit number of Nav. Specs in global use What PERFORMANCE is required of the RNAV system? What Functionalities must RNAV system have to achieve Performance What Navigation Sensors must be integrated in RNAV system to achieve Performance What requirements are placed on the Air crew to achieve the required Performance from the RNAV system? Accuracy Integrity Continuity Availability NAVIGATION SPECIFICATION 2 3 Document used by State as basis for developing Certification & Operational Approval

7 Elements of PBN Concept - Navigation Specification -
PERFORMANCE Functionalities Navigation Sensors Air crew requirements 3 NAVIGATION SPECIFICATION 2 Previous RNP Concept Document used by State as basis for developing Certification & Operational Approval International Navigation Specifications published in Volume II of PBN Manual

8 Elements of PBN Concept - Navigation Specification -
International NS in Volume II of PBN Manual NAVIGATION SPECIFICATION 2 3 RNAV System PERFORMANCE Document used by State as basis for Certification & Operational Approval RNAV RNP On-Board performance Monitoring and Alerting Better Performance

9 Elements of PBN Concept - Navigation Specification -
RNAV RNP On-Board performance Monitoring and Alerting On-board performance monitoring and alerting does not only refer to ‘containment’ in the MASPS; Annex 11 or PANS-OPS. On-board performance monitoring and alerting allows the air crew to detect that the RNAV system is not achieving the navigation performance required of the RNAV system

10 Elements of PBN Concept - Navigation Specification -
ICAO NAVIGATION SPECIFICATIONS RNAV SPECIFICATIONS RNP SPECIFICATIONS International NS in Volume II of PBN Manual

11 Elements of PBN Concept - Designation -
NAVIGATION APPLICATION 1 NAVIGATION SPECIFICATION 3 X RNAV RNP X NAVAID INFRASTRUCTURE 2 RNAV 10 B-RNP 1 RNAV 5 RNP APCH RNP AR APCH X RNAV RNP X RNP descriptor RNAV 10 B-RNP 1 RNP APCH RNAV 5 RNP AR APCH X = Navigation Accuracy in NM

12 Elements of PBN Concept
NAVIGATION APPLICATION 3 3 NAVIGATION SPECIFICATION 2 2 NAVAID INFRASTRUCTURE 1 1

13 Elements of PBN Concept - Navigation Application -
3 1 The APPLICATION (use of) the Navigation Specification and Navaid Infrastructure - For example: Routes based on RNAV and RNP Specifications (these rely on the Navaid Infrastructure); For example: SIDs/STARs based on RNAV and RNP Specifications; For example: Approach procedures based on RNP Specifications

14 Elements of PBN Concept
NAVIGATION APPLICATION 3 3 NAVIGATION SPECIFICATION 2 2 NAVAID INFRASTRUCTURE 1 1

15 Example: RNAV 1 Specification
APPLICATION NAVAID INFRASTRUCTURE ICAO RNAV 1 SPECIFICATION PERFORMANCE Functionalities Navigation Sensors Air crew requirements Navigation Sensors (1) DME/DME/IRU (1) DME (2) DME/DME (2) DME (3) GNSS (3) GPS

16 E.G: RNAV 1 Specification (A)
STATE (A) RNAV 1 APPLICATION 1 State A 3 STATE (A) RNAV 1 SPECIFICATION NAVAID INFRASTRUCTURE 2 Navigation Sensors (1) DME/DME/IRU (1) DME (3) GNSS (3) GPS

17 E.G: RNAV 1 Specification (B)
STATE (B) RNAV 1 APPLICATION 1 State B 3 STATE (B) RNAV 1 SPECIFICATION NAVAID INFRASTRUCTURE 2 Navigation Sensors (1) DME/DME/IRU (1) DME (2) DME/DME (2) DME

18 COM NAV SUR ATM Context of PBN Airspace Concept Airspace Concept PBN
NAVIGATION APPLICATION NAVAID INFRASTRUCTURE SPECIFICATION PBN

19 PBN Concept Summary (1) NAVIGATION APPLICATION NAVIGATION
Use of Navigation Specification & Navaid Infrastructure (together) PBN NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE RNAV SYSTEM PERFORMANCE Functionalities Navigation Sensors Air crew requirements Ground Based Navaids Space-Based Navaids

20 (Ground- Space-based)
Concept Summary (2) NAVIGATION APPLICATION 1 (Use of NS & NI) X RNAV RNP 3 NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE 2 (RNAV System Perf.) (Ground- Space-based) RNAV RNP X X RNP descriptor

21 Concept Summary (3) NAVIGATION SPECIFICATION RNAV RNP

22 Concept Summary (3) NAVIGATION APPLICATION RNAV RNP

23 Why Change to PBN? Proliferation of national standards
PERFORMANCE Functionalities Navigation Sensors Air crew requirements Previous RNP Concept Proliferation of national standards Wide variety of functional requirements Variety of required navigation sensors Differing air crew requirements Lack of global harmonsiation Publication of PBN navigation specifications seeks to limit number of certification standards

24 PBN BENEFITS Reduction to number of sensor-specific routes
Allows more efficient use of airspace Clarifies how RNAV systems are to be used Facilitates operational approval process for operators by providing limited set of navigation specifications intended for global use Provides potential to exploits capabilities of advanced RNAV systems Enables navigation applications for Terminal Airspace

25


Download ppt "PBN Performance Based Navigation"

Similar presentations


Ads by Google