2013/14 Coastal Storms and Emergency Response in Dorset
Neil Watson Coastal Engineer Wessex
2
The Dorset Coastal Storms 2013/4
GROUNDWATER LANDSLIDES & ROCKFALLS BEACH LOSSES AGRICULTURAL FLOODING BATHING WATERS INFRASTRUCTURE DAMAGE ROAD CLOSURES COASTAL DEFENCES DAMAGE PROPERTY FLOODING SEWER FLOODING Frontage with natural or hard defences Frontage with Beach Management Plan
3
What storms? - 22nd to 24th December rd to 4th January th to 7th January st February th to 9th February th February th to 16th February rd March 2014.
4
Wessex at alert status 72 Consecutive days
20/01/14 Flood Guidance Statement day by day Week starting 27/01/14 02/12/13 Wessex at alert status 72 Consecutive days 03/02/14 16/12/13 Wettest Winter in 250 years Clusters of storms bring extreme wind & waves 10/02/14 23/12/13 The most energetic seas for at least 60 years 17/02/14 30/12/13 High Astronomic tides and Surge 24/02/14 06/01/14 ‘Phenomenal’ sea state in shipping forecast 03/03/14 13/01/14
5
Area Incident Room
6
On site
7
Operation Pitchpole How the military supported us and the community
Repair of sea defences Chesil Beach, Portland Deployment of sandbags West Bay & Christchurch Asset inspections Merlin flight
8
Storm Return Periods
9
Assessing storm event wave and water levels
Compared observed wave and water level combinations to JPA data stated in BMPs.
10
Lyme Regis – The Cobb 10
11
Waves & Energy January & February Wave Heights, West Bay (Green line Average, Black line Max) 11
12
Burton Bradstock
13
Landslides & Rockfalls
Burton Bradstock Bournemouth Portland The Little Ship 5th February Source BBC
14
Storm Wave Damage STORM DAMAGE Undermining of promenade
Avon Beach Christchurch Physical attrition West Bay Promenade Beach erosion Sandbanks Undermining of Sea wall Chesil Cove The Little Ship 5th February Source BBC Waves containing shingle Cove Inn Chiswell
15
Roads & Infrastructure
Portland Causeway closed for 8 hours February 5th 2014 The Little Ship 5th February Source BBC Preston Road Closed 6 occasions
17
Chiswell Storm Damage 6th February 2014
18
Chiswell unexpected impacts
19
Why reprofile the beach?
20
Beach reprofiling The Little Ship 5th February Source BBC
22
Chesil Beach Incident Management
UNCLASSIFIED
23
Chiswell Warnings and Severe Warnings issued
Date Time Level of Warning 03/03/2014 22:43 Flood Warning Update 21:00 Flood Warning 15/02/2014 11:12 Flood Warning Update 14/02/2014 15:18 Severe Flood Warning 12/02/2014 11:59 08/02/2014 10:00 07/02/2014 14:06 06/02/2014 10:38 05/02/2014 17:53 08:34 04/02/2014 18:12 01/02/2014 11:17 07/01/2014 15:08 06:30 06/01/2014 14:51 00:15 04/01/2014 02:06 03/01/2014 15:34 23/12/2013 13:28 22/12/2013 13:40 27/10/2013 14:52 The Little Ship 5th February Source BBC
24
Depths and velocity
25
Large objects and masonry washed down opes
The Little Ship 5th February Source BBC
26
Preston Beach Road Swanage Beach 00:15 15 February 26
27
Preston Beach Crest Reinforcement
Swanage Beach 00:15 15 February Preston Beach Crest Reinforcement 27
28
The Little Ship 5th February Source BBC
29
Shore Road Poole the missing beaches
UNCLASSIFIED
31
Surge Damage
32
The Little Ship 5th February Source BBC
33
The Investigations UNCLASSIFIED
34
Beach Depletion The Little Ship 5th February Source BBC
35
The Recovery Programme
£k 2013/14 2014/15 2015/16 TOTAL Local Authorities 461 2730 2340 5531 Environment Agency 813 1286 2099 1274 4016 7630 UNCLASSIFIED
36
The Recovery Programme
UNCLASSIFIED
37
The Investigations Beach profile survey Bathymetry Lidar
Particle size analysis Laser scans Air photo reconnaissance Drainage modelling Wave data review National Policy – National Strategy – Plans
38
Modelled Flood Extents 5th February
Flood Depth (m)
39
Range of analysis undertaken:
Post-storm inspections Beach profile surveys and analysis Comparing beach levels to trigger levels at Chiswell Beach stability analysis Assessing storm event wave and water levels Post storm analysis has been undertaken since February 2014, and has involved …..
41
Assessing storm event wave and water levels
Matched wave and tide records.
44
Timeline analysis 4th to 9th February 2014
45
Damage to gabion beach reinforcement Ship 5th February Source BBC
Broad cost estimate to replace volume Lower estimate: £ 7,838,718 Upper estimate: £ 11,903,238 Damage to gabion beach reinforcement Ship 5th February Source BBC
46
Chesil Beach - managed section total beach volume
47
Bathymetric comparison Chesil Cove
48
Thank you for your attention