Presentation is loading. Please wait.

Presentation is loading. Please wait.

Managing the Construction Administration Phase in Autodesk® Revit®

Similar presentations


Presentation on theme: "Managing the Construction Administration Phase in Autodesk® Revit®"— Presentation transcript:

1 Managing the Construction Administration Phase in Autodesk® Revit®
Jennifer L. Storey Chief Operating Officer Buric Global

2 Class Summary This is a class to help beginners understand the use of Revit in the Construction Administration (CA) phase of a project. Once you rely on a model to create the construction documents, what used to be a simple change may affect many views and details. We will discuss the pluses and minuses of making changes directly in the model. It is important to do some upfront thinking on the process and talk to your team about how you are going to go through it. This class will show you some methods that have been tried and how to avoid failures during the CA phase.

3 Learning Objectives At the end of this class, you will be able to:
Understand the differences between the basic types of Project Delivery Methods, the Contractual differences of these methods make to you and your Revit model Create and manage revisions in the model thru Design Options and the Freeze Drawings command Understand the basic Revisions Tools available in Revit Create deliverables through the use of Sketch Titleblocks

4 Project Delivery Methods
Design-Bid-Build

5 Construction Management

6 Design-Build

7 Integrated Project Delivery

8 Contracts Exhibit - AIA E202

9 Level of Development

10 Model Archiving

11 Archiving

12 Changes Duplicating Views

13 Duplicate

14 Duplicate with Detailing

15 Duplicate as a Dependent

16 Changes Design Options

17 Design Options

18 Freeze Drawings

19 Sheets Revision Tool

20 Sheets Revision Tool

21 Revision Cloud

22 Browser Organization

23 Browser Organization

24 Duplicate as a Dependent

25 Duplicate as a Dependent

26 Autodesk, AutoCAD* [*if/when mentioned in the pertinent material, followed by an alphabetical list of all other trademarks mentioned in the material] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. © 2012 Autodesk, Inc. All rights reserved.


Download ppt "Managing the Construction Administration Phase in Autodesk® Revit®"

Similar presentations


Ads by Google