Download presentation
Presentation is loading. Please wait.
Published byClaud Lyons Modified over 6 years ago
1
/ Nygård Magnus GNA - Nya kontraktstyper och samarbetsformer - New contract models and increased cooperation Magnus Nygård Trafikverket, Vägavdelningen Finland (Finnish Transport Agency)
2
GNA reports from earlier work (2008)
/ Nygård Magnus GNA reports from earlier work (2008) Entreprise- og samarbeidsformer - GNA Rapport Utveckling av entreprenadformer och alternative samarbetsformer (pdf) - Summary Report Developing of Project Delivery (Contracting) Methods and Modes of Co-operation-Closer Co-operation (doc) - Ad hoc rapport anskaffelser (pdf) - Project alliance (final report) GNA
3
Discussion on possible areas for cooperation (2008):
/ Nygård Magnus Discussion on possible areas for cooperation (2008): Meetings / year, to follow-up the procurement issues in practice. Client's issues and client organisation regarding to procurement. Follow-up would be interesting within a couple of years: what has changed? Have the recommendations come into practice? Competence - how to ensure the competence on market so that the new procurement methods can be utilized and that they will work well. Quite a lot of procurement methods have been done, but the competence of the personnel have not been developed to the needs in new methods. Education must be real education, not informal discussion and seminars - together with clients, consultants and contractors. Systematical benchmarking should be more carefully described. Bench marking should normally be used on well prepared, and well defined is- sues instead of a very wide scope. Proposal for continuation of the work needs to be done. GNA
4
Market changed dramatically
/ Nygård Magnus Market changed dramatically spring 2008 still a lot of infrastructure and housebuilding projects ongoing problems with prices in competitive bidding processes similar problems in Nordic countries autumn 2008 the finance crisis started investments stopped on private sector more bids coming in in bidding processes price decreased future of Public Private Partnership -projects? price of "private money"? lessons learned? the change occurred quickly more Design-Bid-Build instead of Design-Build in high economic activity revival package; some new projects, mostly small projects - larger ones take time to start some cooperation done within this area between Nordic countries GD Roads working groups: within in price estimates, market situation GNA
5
Development projects with contract types and increased cooperation
/ Nygård Magnus Development projects with contract types and increased cooperation no systematical information exchange has been done during Finland and Sweden starting with new organisations; road + rail in same organisation effects of this in procurement? Contracts types cooperation within investement projects PPP Increased cooperation (possible issues) possibility for in depth study, or, describing a common model for cooperation, or defining the "cornerstones" of cooperation, and describing good ways to use them GNA
6
Finnish development projects
/ Nygård Magnus Finnish development projects Alliance contracting: no pilot project yet, still aiming towards pilot study Ideas on Lean construction; how to use it within road building both for client and contractor PPP projects starting: new road and railroad investment projects Innovative procurement methods - a study possibly starting Development of service agreements, European PBSA project, phase 2 starting systematised cooperation with branch within maintenance (lead by Association of infrastructure contractors, consultants and clients) Partnering: some pilots on the way aiming to start new pilots, for example on: routine maintenance, periodic maintenance investement projects, pilots going on within periodic maintenance GNA
7
Responsible strategic network
/ Nygård Magnus Chairman/leader Organization Network Responsible strategic network Magnus Nygård Karin Brännström Trafikverket, FI Vägverket, SE Contract types Co-operation models Jukka Karjalainen Lars Jacobsson/Stefan Engdahl Participants Trafikverket Finland Claus Nødgaard Vejdirektoratet Danmark Jan Eirik Henning Statens vegvesen Norge Frode Rosenkilde Jernbaneverket Camilla Ahston Banverket Sverige Kristina Göransson- Rudberg Sara Sjöberg Vägverket GNA
8
Starting the work year 2010 first meeting March-April
/ Nygård Magnus Starting the work year 2010 first meeting March-April common objectives for work developing a work plan / agenda for group information exchange included describing best practices follow-up of recommendations from earlier phase client's organisation within procurement new ideas? GNA
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.