Presentation is loading. Please wait.

Presentation is loading. Please wait.

rice village revitalization

Similar presentations


Presentation on theme: "rice village revitalization"— Presentation transcript:

1 rice village revitalization
team: impel members: meb, lec, aep

2 things to address: +traffic flow +residential vs. commercial
+identity of kirby +improvement of aesthetic quality +comfort level +safety

3 phasing overview + phase one - immediate - provide solutions which can be implemented in the near future to improve comfort levels for the pedestrian and the driver + phase two years - design a space that can be modified based on temporary desired uses which concentrate on the pedestrian +phase three years - transform the site into a pedestrian only public space with considerations for significant urban densification

4 phase one resolutions + eliminate parallel parking on streets
+ ensure that pedestrian sidewalks and streets are separated by a ‘buffer zone’ + addition of medians on major through-streets *existing buildings remain

5 (here there will be several slides of drawings supporting phase one)

6 phase two resolutions + temporarily block off inner streets to vehicles for pedestrian use only (weekends, special events) + initiate satellite parking system with public trolly + eliminate on site parking lots and replace with multi-functional public space *existing buildings remain

7 (here there will be several slides of drawings supporting phase two)

8 phase three resolutions
+eliminate and manipulate some buildings in order to create a central public square +design a pedestrian walkway system +add multi-use mid/high rise buildings on perimeter (including residential, parking, retail) +close off all inner streets to vehicular traffic

9 (here there will be several slides of drawings supporting phase three)


Download ppt "rice village revitalization"

Similar presentations


Ads by Google