Presentation is loading. Please wait.

Presentation is loading. Please wait.

TEAM 3-WEEK PLAN ASHLYNN COLE KENNETH YUAN RAVEN

Similar presentations


Presentation on theme: "TEAM 3-WEEK PLAN ASHLYNN COLE KENNETH YUAN RAVEN"— Presentation transcript:

1 TEAM 3-WEEK PLAN ASHLYNN COLE KENNETH YUAN RAVEN
Update edge documents and presentations. Develop test plan. Write hematocrit protocol. Perform hematocrit testing. Generate time output curves for centrifuge. COLE Running more lifetime tests. Data analysis. Vibration tests. Adjust test procedures as needed. Begin final design. KENNETH Follow up on battery return. Attempt to get more money. Purchase Velcro. Finalize wiring. YUAN Conduct hematocrit test with team. Record data and complete test plan. Analyze results. Contribute to slides and edge for review. RAVEN Finish technical paper and poster. Make sure test plans are up to date. Finish detailed assembly instructions. Clean up edge.


Download ppt "TEAM 3-WEEK PLAN ASHLYNN COLE KENNETH YUAN RAVEN"

Similar presentations


Ads by Google