Download presentation
Presentation is loading. Please wait.
Published byRudolph Gibbs Modified over 6 years ago
1
PROPOSED EWB BOSTON PROFESSIONALS PROGRAM IN TANZANIA
SIEMENS VAI, WORCESTER MAY 2011
10
IDEA FOR EWB PROGRAM Central hub for a group of families
Biogas plant and distribution - $1000 Cooking Refrigerator? Solar panels and distribution – $5 per watt Light Battery charging Water pump? Water well?
11
BENEFITS Clean indoor air Health No deforestation Improved light
Reading etc. in evening Savings Time for gathering wood (dung is closer) Time of recharging cell phones Cost of kerosene
12
CHALLENGES Efficient cheap design
Proof that it’s of benefit to the families Funding (until self-sustaining) Maintenance after EWB leaves Business development Local and national politics Fitting in with tribal culture
13
IN 5 YEARS (OR MAYBE 10) 500 installed systems, with every one being used Ten teams of EWB Boston engineers, each working in one village, responding to the unique requirements of that village Local businesses supplying parts for new hubs and for maintenance Good relationships with local and national governments and other NGO’s Smooth supply of funding
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.