Download presentation
Presentation is loading. Please wait.
Published byAlexis Barrett Modified over 6 years ago
1
Review : Implementation of Smart Cities Mission
Name of State Union Territory Chandigarh. Name of City Chandigarh Date of Review 23/2/2017
2
VC On 23/02/2017 SPV & PMC Chandigarh 13/07/2016 Yes Under process
Name of city Date of Establishment of SPV If Human Resources appointment Date of issue of LOI for PMC # Of RfPS Completed by PMC CEO CFO CS Others Chandigarh 13/07/2016 Yes Under process RFP called 2nd time on 11/01/2017 and opened on 16/2/2017. Technical and Financial evaluation is in progress. -
3
Funds , etc City name Central Share Transferred
State Share transferred Equity to be enhanced to Rs.200 Cr PFMS opened Yes /No Chandigarh 73 Crore (including 2 crore before formation of SPV) -Nil- Yes.
4
Projects- Core infrastructure
Description Remarks Smart Water (Performance based contracts) Sanitation -Street Sweepage -Integrated SWM -Dumping site restoration Street sweepage in city is 100% . Bids for Transaction Adviser for Integrated SWM has been received . Technical and Financial Evaluation of bid is in progress. Dumping Site- Report Waste Water Recycling 100% waste water recycling is being done. Tertiary treated water is being used in most of green belts/Parks in various sectors in Chandigarh The T.T.Water connection has made mandatory for the houses having area of 500Sq.yard and above. The distribution lines (left out area 15%) are being laid in those sectors where T.T. Water is not available. Smart Railway Station Ministry of Railways look after the Chandigarh Railway Station.
5
Visible, Feel, Experience projects
City Name Smart Roads in Area (ABD) Implementation status Smart Integrated command & control centre Chandigarh 1) Signage Road marking and way finding. Work in progress Work will be started after selection of PMC. _
6
Projects- Smart Solutions
City Name Proposed Projects (No.) RfP under preparation Work started (Nos) Discuss-Plan of Action for RfPs under preparation Physical Progress Chandigarh 7 -- --- RfP will be prepared after selection of PMC. _
7
Projects -ABD City Name Projects proposed (Nos) RfP under preparation
Work started (Nos). Physical Progress(% completed Chandigarh 54 11 -
8
Convergence-GoI, State Government, Others
City Name Name of Ministry/Departments/Others No. of Projects Cost of projects Status Chandigarh Up gradiation of Sewage Treatment plants in Chandigarh. 1 20 crore Work will be started after selection of PMC.
9
Projects-Modules, Packages prepared from separate projects.
City name Projects Proposed in SCP(Total No.) Integration Possible (No) Not Possible (no) Manner of integration Chandigarh
10
Finance- Projects pipeline
Description Remarks Creation of pipeline of projects (nos) -WB/ADB- -AIIB -HUDCO -BRICS -NIIF -JICA -OTHERS -Nil-
11
CBUD PROGRESS City Name Status of VCF policy revision
Status of property tax rationalization Status of NRW reduction Status of waste water recycling Chandigarh - 1)Year % target achieved. 2) Year Up to 31/1/2017 Residential-84% Commercial-92% 26% 100%
12
Fast Track & Round 2 cities(City Wise)
City name Date of SPV establishment Date of tender issue for PMC Date of completion of credit rating No. of registration on smart net Chandigarh 13/07/2016 11/01/2017 (2nd Call) 18/01/2017 1No
13
Mile Stone for 25th June 2017 (City Wise)
No. of projects likely to started 11Nos No. of projects likely to completed List of visible & felt outcome for people
14
Finance Bonds City name Credit Rating Status Bonds issue plan
Progress in appointment of Transaction Advisor Chandigarh 1.Completed-”BBB” 2.Consultant being appointed to enhance the rating. No Plan till date
15
Finance -PPPs and JVs City name Proposed PPP in SCP (Totals)
Process started (nos) Likely date of bidding Proposed Private Finance (Rs.Crores) in bidding Chandigarh
16
Detail of Utilization and Unspent balance on 31/12/2016
City name Funds Received in month December 2016 Unspent Amount on 31/12/2016 Chandigarh Rs.71 Crore
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.