Presentation is loading. Please wait.

Presentation is loading. Please wait.

Implementing Time Series with the Marine Data Model

Similar presentations


Presentation on theme: "Implementing Time Series with the Marine Data Model"— Presentation transcript:

1 Implementing Time Series with the Marine Data Model

2 Michael J. Blongewicz GIS Specialist DHI Water & Environment
Portland, Oregon

3 Introduction DHI Modeling Software
Water Resources - MIKE 11, MIKE SHE, MIKE Basin Marine - LITPACK, MIKE 21, MIKE 3 Urban - MIKE Urban

4 Marine Data Model Presented a different kind of challenge.
Multiple features Multiple depths Multiple Measuring devices Measuring multiple variables Example: Moored buoy with a CTD cable with multiple sensors at every 10 m. At each depth one sensor is measuring temperature and salinity and a second sensor is measuring current speed and direction

5 Marine Data Model X Y Z MarineID = 1 TimeSeriesPoints - 3.5 - 10.0
Measurement - 3.5 - 10.0 TimeSeries - 13.0 Measuring Device - 17.5 - 21.5 Z TSType

6 Marine Data Model FeatureClass: TimeSeriesPoint
ObjectClass: Measurement

7 Marine Data Model ObjectClass: TSType ObjectClass: TimeSeries

8 Marine Data Model ObjectClass: TSType ObjectClass: TimeSeries
ObjectClass: Measurement

9 DHI TimeSeries Manager
Functionality Data Access Bridges TimeSeries Controls

10 DHI TimeSeries Manager
Data Access Bridges dfs ASCII DB GeoDatabase Bridge ... GDB XML

11 DHI TimeSeries Manager
Arc Atmosphere Arc Hydro MIKE 21 Arc Marine Geodatabase ArcGIS MIKE 11 TimeSeries Manager Data Access Bridges dfs0 MIKE GIS MIKE Basin


Download ppt "Implementing Time Series with the Marine Data Model"

Similar presentations


Ads by Google