1 MACDC Intercounty Drain Procedures Training
Complying with Common Parts of NREPA Stacy Hissong, Fahey Schultz Burzych Rhodes PLC Amy Lounds, MDEQ, Water Resources Division Amy Berry, MDEQ , Water Resources Division February 16, 2017 macdc.us

2 Natural Resources and Environmental Protection Act (NREPA) Summary
Part 31 Floodplains Part 91 Soil Erosion and Sedimentation Control Part 301 Inland Lakes and Streams Part 303 Wetland Protection Part 365 Threatened and Endangered Species macdc.us

3 Part 31: Floodplains Drain Code Exemption
Rule These rules do not apply to any of the following: b) An improvement proposed under Act No. 40 of the Public Acts of 1956, as amended, being Section et seq. of the Michigan Compiled Laws (aka Drain Code). macdc.us

4 Part 91: Soil Erosion and Sedimentation Control
Drainage Board must determine how to meet compliance under Part 91 Compliance is for drainage district as a whole, not by individual county macdc.us

5 Intercounty Drain Process for SESC
Drain Commissioners with APA Status Drainage board gives responsibility to DC with APA status DC prepares plan and agrees to inspect macdc.us

6 Intercounty Drain Process for SESC
No Board Members with APA Status Drainage board authorizes DC to prepare Part 91 application on behalf of drainage district DC must agree to provide copy of approved permit, plan, and have certified inspectors available macdc.us

7 SESC Plans Drainage board should approve SESC plan
Contractor required to follow plan MACDC SESC Manual macdc.us

8 Notice of Coverage (NOC)
5-acre threshold within entire drainage district Drainage board passes resolution designating county Coordinate submittal Provide to all drainage board members Inspections macdc.us

9 Part 91 Violations Violation is to entire drainage board/district
Fines up to $25,000/day Administrative Consent Orders macdc.us

10 Michigan’s Section 404 Program
Michigan is first state to receive EPA approval to administer Section 404 of Federal Clean Water Act (CWA) 301 and 303 permits are “joint permits” that also provide authorization under Section 404 of the federal CWA and permitting from the Army Corps where needed JPA includes waters along the coasts that also fall under Section 10 ACOE authority Includes screening for other programs: T&E, Wild & Scenic Rivers, Historic/Archaeologic sites macdc.us

11 Michigan’s Section 404 Program
State “404” permits are issued under state law Laws, policies and procedures specific to state needs while federally consistent Permitting staff with local knowledge Authorizations under Section 401 and CZM, and screening for HPA and T&E State law details: Permit decision timeframes Fees Regulatory definitions Exemptions Consistency not same More permitting staff More interaction and availability In other states, authorizations and screenings are from separate agencies macdc.us

12 Part 301: Inland Lakes & Streams
What is a “Stream”???? Section 30101(i) A natural or artificial river, stream, creek, or any other body of water Definite banks, a bed, and visible evidence of a continued flow or continued occurrence of water macdc.us

13 Part 301: Inland Lakes & Streams
Regulated Activities in Streams: Dredge or fill bottomland Construct, enlarge, extend, remove, or place a structure on bottomland (below OHWM) Create, enlarge, or diminish an inland lake or stream Structurally interfere with the natural flow of an inland lake or stream Construct an artificial waterway that ultimately connects to or is created within 500 feet of the OHWM of an existing inland lake or stream Connect any natural or artificial water with an existing inland lake or stream OHWM video series on DEQ youtube channel macdc.us

14 Part 301: Inland Lakes & Streams
Exempt Activities: MCL (g) Maintenance defined as “physical preservation of the location, depth, and bottom width of a drain and appurtenant structures to restore the function and approximate capacity of the drain as constructed or modified” Includes specific list of exempt activities Does not include mainstream portions of certain drains identified under rule (R ) Drains constructed prior to January 1, 1973 Does not include deepening, widening, adding branches, etc. MUST be completed under agreement with the drainage board (landowner work not exempt) AND using BMPs (practices that minimize impacts) Board should make a determination as to why the project is exempt and document this in the file (notes, minutes, etc) macdc.us

15 Part 303: Wetland Protection
What is a “wetland”???? Section 30301(w) “Land characterized by the presence of water at a frequency and duration to support and that under normal circumstances does support, wetland vegetation or aquatic life, and is commonly referred to as a bog, swamp, or marsh.” This means: onsite investigation of vegetation, soils, and hydrology by a wetland professional. Michigan law requires that Army Corps of Engineering Wetland Delineation manual methodology is utilized for wetland determinations. Not all wetlands are regulated: Michigan law gives specific criteria for which wetlands are regulated. Generally, a wetland is regulated if it is larger than 5 acres in size or if it is connected to or within 500 feet of an inland lake or stream. Pictures of floodplain wetland taken two weeks apart. macdc.us

16 Part 303: Wetland Protection
Regulated Activities in Wetland FILL DRAIN Place fill material in a wetland Remove soil or minerals from a wetland Construct, operate or maintain a use or development in a wetland Drain surface water from a wetland macdc.us

17 Part 303: Wetland Protection
Exempt Activities: MCL (2)(i) “Maintenance” of drains Includes “placement of spoils removed from drain in locations where spoils have been previously placed” Does not include modification that results in additional wetland drainage macdc.us

18 301 and 303 Permitting Process
In general, when planning a project, a permit applicant must follow these steps, in this order: Avoidance 2. Minimization - BMPs 3. Replace Unavoidable Lost Resources Much of the first two steps deal with: Do feasible and prudent alternatives exist? Different location, configuration, size, or method (access, approach, equipment, etc) Deal with first two THEN go to replacing lost resources – called Mitigation Replace unavoidably lost wetland or stream resources with created or restored wetlands OR in-stream improvements Ensure no net loss of functions and values. macdc.us

19 Early Coordination Critical for saving time and money
Build relationships Gain understanding Share background Three ways to be an early bird… The purpose: obtain information that may have impacts early in the planning process in order to minimize planning costs and delays. macdc.us

20 County Drain Resources
County Drain Resources Know what you’re talking about.

21 Requests for Coordination
Voluntary & Free Early discussions on planned projects Pre-screening Submit in January Results in letter from DEQ macdc.us

22 Pre-Application Meetings
Through your local DEQ District office Assists with project planning Identifies if your proposed activities will require a permit Conducted in office or on site No wetland boundaries will be identified Pre-application meetings must be requested in writing – visit the MDEQ website for the form. Formal outcome is a determination of what permits may be required. Informal process/conversation is where you gather information to improve the permit application, modify the project, and/or explain intent and history. macdc.us

23 3-Tier Permitting system
Public Notice Projects Minor Projects General Permits Exempt Activities MP/GP documents are available at: macdc.us

24 County Drains General Permit Category
Specific activities receive expedited permit processing Activities included in category: Clear span bridges, headwalls/wingwalls, riprap, 300’ road safety realignments, some in-stream structures, and culverts. Reporting is required at the end of the year the activity was done that indicates the work complied with the category requirements. macdc.us

25 Activities requiring individual permits
Maintenance on drains established after 1973 where no permit was obtained Widening, deepening, straightening beyond established profiles Extensions or adding branches Enclosures >100’ individually or >300’ total Relocating or other “realignments” >300’ All other regulated activities not covered under GP or MP Categories macdc.us

26 Public Notice All adjacent landowners are notified
Public notice period is additional 20 days If public hearing requested, additional 60 days added to permit processing timeline macdc.us

27 Federal Review: Red File Projects
Relocation or channelization >1,000 feet of stream New construction of >1,000 feet of breakwaters or seawalls Affects 1 acre or more of wetland Enclosures >300 feet of stream Potential for affecting federal T&E According to our MOA with USEPA, federal oversight of state assumed programs require that certain projects also must undergo federal review. macdc.us

28 Federal Review: Red File Projects
Potential for affecting waters of another state Suspected to contain toxic pollutants or hazardous substances In proximity to public water intake In critical areas such as national or state parks, wildlife refuges, etc. Sites identified by EPA in advance How does this affect the permit process? Concurrent review with MDEQ by federal agencies including USEPA, USACE, USFWS USACE and USFWS provide any comments to USEPA Based on compiled federal comments, USEPA may issue a letter objecting to the project MDEQ acts as liaison and responds to federal comments MDEQ cannot issue a permit when a federal objection stands 90 days to resolve objection under federal law macdc.us

29 Part 365: Threatened and Endangered Species
Approximately 400 species listed in Michigan Separate federal list regulated through US Fish & Wildlife Service State T&E law is administered by MDNR and federal T&E law administered by USFWS; however DEQ offers screening and coordination with these agencies during the JPA permit process. macdc.us

30 macdc.us