Download presentation
Presentation is loading. Please wait.
Published byArline Wood Modified over 6 years ago
1
Urban Renewal: Hood River Heights Business District
Two Meetings: October 19- Provide Information/Gain Initial Feedback November 9 – Gain public input on project priorities
2
Background on Urban Renewal
Q and A Hood River Heights Urban Renewal Plan and The Art of the Possible – Types of Projects
3
Things to take away from this meeting
No new taxes with urban renewal General understanding of the goals of the Plan and what types of projects can be done. The Heights Urban Renewal District is primed for project implementation. We want you to come to the November 9th meeting to help establish project priorities.
4
From Oak Street to Eliot Street along the 12th and 13th Corridor
5
What is Urban Renewal? No new taxes! Tax rate does not change!
Program to improve communities Used throughout Oregon Provides Financing Mechanism to Implement City Plans: Uses increases in Property Taxes to Fund Projects in Area Leverages public dollars to spur private investment
7
How is Urban Renewal Administered?
A city must establish an urban renewal agency prior to adoption of an UR Plan Hood River Urban Renewal Advisory Committee Hood River Urban Renewal Agency – City Council and two Port of Hood River members Hood River City Council
8
How Urban Renewal Works
9
What is Maximum Indebtedness
MI is the total amount of funds to be spent on projects, programs and administration in an urban renewal area. Maximum Indebtedness of Heights: $8,495,650 State Street Project = $5,301,868
10
Impacts on Hood River Taxing Jurisdictions
Continue Receiving Taxes on Frozen Base Forego taxes on growth in Area Increased Tax Revenues After UR Indirect impact on School District and ESD
11
Questions?
12
Hood River Heights Goals
Goal 1: ECONOMY Diversify the economic base in the Hood River area. Strengthen the area’s role as a regional economic center. Preserve and promote a livable community, better utilizing commercial and mixed use and residential lands. Accommodate the need for expansion of new and existing businesses and housing to support those businesses. Possible Projects: Economic Development Infrastructure Improvements Housing Development
13
Goal 2: DISTRICT IDENTITY
Create and enhance a distinct identity for the Area as a mixed use neighborhood. Gateway to the city Place for residents of the city to live, shop for goods and services, work and play. Possible Projects: Streetscape Improvements Public Spaces/Parks Connections to local parks/greenspaces Signage
14
Possible Projects: Public Spaces/Parks
Goal 3: RECREATION Provide facilities and parks to support the Heights Business District and neighboring residential community. Possible Projects: Public Spaces/Parks Connections to local parks/greenspaces
15
Goal 4: TRAFFIC AND TRANSPORTATION
Implement transportation improvements that enhance Hood River’s livability. Provide a safe transportation system Provide facilities that are accessible to all members of the community. Reduce trip length. Provide for the efficient movement of goods. Possible Projects: Streetscape Improvements Parking
17
Goal 5: PUBLIC UTILITIES
Ensure adequate infrastructure is available for new development. Possible Projects: Utilities/Undergrounding of utilities
18
Goal 6: PUBLIC INVOLVEMENT
Maintain a program that allows citizens to be involved in all phases of the planning and implementation process.
19
Goal 7: HOUSING Diversify the supply of housing Strengthen the Area’s role as a residential neighborhood. Preserve and promote a livable community, better utilizing commercial, mixed use and residential lands. Accommodate the need for development of long-term housing (rental and ownership) at affordable and other income levels Possible Projects: Assist in the development of housing, including affordable housing, in the Area
20
Types of Initial Projects
District Identity/Streetscape Improvements Pedestrian and bicycle improvements Enhance connections with local parks and greenspaces Public spaces for community events Redevelopment Assistance Housing Assistance Infrastructure Improvements Undergrounding of utilities where economically feasible Parking improvements Property Acquisition
21
State Street Project - $5,301,868
8-block renewal project included complete reconstruction of all underground utilities, streets, sidewalks and curbs. Newly designed restroom facilities, New community biking hub, tree planters and benches, Larger and higher-visibility pedestrian walkways and crosswalks Integrated art and sculpture spaces, Better drainage and utility routing, and Over 600 linear feet of custom-engineered retaining walls which provided additional building spaces above State Street
22
Hood River State Street
23
Hood River State Street
24
Estacada Streetscape Estacada Elaine Howard Consulting, LLC
25
Elaine Howard Consulting, LLC
26
Elaine Howard Consulting, LLC
27
Elaine Howard Consulting, LLC
28
Elaine Howard Consulting, LLC
29
Lake Oswego B Street Elaine Howard Consulting, LLC
30
Redmond Streetscape Elaine Howard Consulting, LLC
31
Wayfinding Pendleton, Sherwood Elaine Howard Consulting, LLC
32
Signage Elaine Howard Consulting, LLC
33
Parks, Plazas, Plantings, Benches
Elaine Howard Consulting, LLC
34
Parks Sherwood Elaine Howard Consulting, LLC
35
Elaine Howard Consulting, LLC
37
Tillamook Festival Street
39
Parking for Commercial District: Tillamook
Total Project Construction Costs $110,845.14 Land Acquisition $304,082 Total project costs $414, Tillamook UR Agency Elaine Howard Consulting, LLC
40
LO angle parking/ Hood River angled parking
41
Sisters Streetscape
42
Lake Oswego Parking
43
Storefront Loans/Redevelopment: Coos Bay
Elaine Howard Consulting, LLC
44
Astoria: Fort George Brewery and Pub
Historic building re-constructed in 1923, remodeled over 80 years later in 2006 Urban Renewal provided: Low interest loan for $120,039 with an 8-year maturity date Storefront Improvement Grant of $30,000 Leverage: SBA Loan State of Oregon (forgivable loan) The remodel highlights the original architecture of the building, featuring old-growth beams and hand-forged fasteners, a variety of wood furniture, and re-used metal décor, which pays homage to the buildings industrial roots. LOAN: The loan covered architectural and engineering fees, deck construction, utilities upgrades, and building repair and repainting GRANT: The grant was $20,000 for repairing and repainting the exterior of the building, $10,000 for the removal of the old auto repair sign and equipment. Leverage: Small Business Loan Forgivable loan: loan will be forgiven if the business creates 12 new jobs Elaine Howard Consulting, LLC
45
Sandy Double Dragon Double Dragon in Sandy
46
Sandy: Sandy Glass Sandy Glass
47
Next Meeting: November 9 Hood River Fire Station
Questions? Next Meeting: November 9 Hood River Fire Station
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.