1 RAII WIS IMPLEMENTATION PLAN
Div. of Information & Communication Technology 7 November, 2012 Sung Soo, DO

2 WMO WIS Implementation Plan
BACKGOUND WMO WIS Implementation Plan Framework document and first draft was reviewed by ICG-WIS, 2007 Continued to be updated by EC WG WIGOS-WIS, 2007 Finalised for CBS and the EC, 2008 The concept of WIS was formally adopted - Consolidation of WIS Plan - Establishment of the WMO metadata standard - Development of WIS regulatory documents - Implementation of WIS Part A - Implementation of WIS Part B - Coordination with other major projects Cg XIV, 2003

3 BACKGOUND Cg XV, 2007 CBS XIV, 2009 EC-64, 2012
Part A : the continued consolidation and further improvements of the GTS for time-critical and operation-critical data, including its extension to meet operational requirements of WMO Programmes in addition to the WWW Part B : an extension of the information services through flexible data discovery, access, and retrieval services(DAR services) to authorized users, as well as flexible timely delivery services. Cg XV, 2007 Stressed the need of clear strategy for the implementation of an adequate data communication infrastructure for WIS - at regional and global levels CBS XIV, 2009 EC-64, 2012 Urging to develop regional and national implementation plans for strengthening and further implementing operational WIS functionality before 2015

4 INTRODUCTION RAII WG-IOS/WIS, Dec 2011 RAII MG-4, Feb 2012
Discussion of the approach for developing a regional WIS implementation plan for RAII(R2-WIS-IP) - Timeline and working mechanism for the development of R2-WIS-IP - Local Secondment (perform mission in its own office for specific purpose) - KMA & CMA voluntarily agreed to provide the Local Secondment RAII MG-4, Feb 2012 Agreed and Comprised of the Local Secondment for developing R2-WIS-IP

5 Processes for R2-WIS-IP
Coordinator :Hiroyuki ICHIJO (RAII Coordinator of the Sub-Group on WIS) Local Secondment : Sung Soo DO (KMA) / Fudi WANG (CMA) April : Kick-Off & coordinating work responsibility May – Sep : Framework and 1st draft October : 1st user review Ad hoc Meeting on Development of R2-WIS-IP November : 2nd draft RA2-WIS-IP on the recomposed structure 2nd user review and comment analysis December : Tentative final draft of R2-WIS-IP 1Q 2013 : Final draft of R2-WIS-IP with all Appendices

6 Structure of R2-WIS-IP Section 1. Background
Section 2. Objectives of R2-WIS-IP Section 3. Guidelines Section 4. Approaches on technical implementation Section 5. Staged implementation - Timeline Section 6. Support Activities Appendices

7 Structure of R2-WIS-IP Section 1. Background
WIS Vision and Overview of WIS Benefits for NMHSs from WIS Section 2. Objectives of R2-WIS-IP Guidelines to achievable implementation to seek maximum benefits and minimum overhead investment Strategic approaches to effective and efficient technical implementation and designation requirement for WIS centres.

8 Structure of R2-WIS-IP Section 3. Guidelines
Outline of the guidelines for achievable implementation in RAII WIS Service Components Global Telecommunication (GTS) Data Discovery, Access and Retrieval Service (DAR) Integrated Global Data Dissemination Service (IGDDS) Inter-Regional Cooperation (GISC Backup service, WIMMS) Capacity Building

9 Structure of R2-WIS-IP Section 4. Approaches on Technical Implementation Implementing the evolution of GTS Evolving RMTN into Area Meteorological Data Communication Networks(AMDCNs) GTS minimum bandwidth, performance requirement Implementation of WIS functionality Role and Requirement of NCs(network links, metadata management) Role and Requirement of DCPCs(designation procedure, technical area) * Specially focusing on technical requirement of NCs for NMHSs) * Abstracting action items from Section 4. → 4 Activities tables

10 Structure of R2-WIS-IP Section 5. Staged Implementation - Timeline
Final draft of RAII WIS implementation plan – first quarter of 2013 All GISCs fully functional – end of 2013 All DCPCs (with RTH function) fully functional – 2015 All NCs fully implemented – end of 2015 Section 6. Support Activities WIS Application Pilot Project (VPN Pilot Project in RAII and RAV) WIS Monitoring Task (detail procedure in 2014, started in 2014 or 2015) WIS technical or usage Interaction (coordinated approach – web based, teleconference, face-to-face meeting)

11 Structure of R2-WIS-IP Appendix RAII list of Principal GISCs
Activities for WIS Implementation (criteria, key item, subject, partner, timeline) Regional Meteorological Telecommunication Network RMTN evolution towards AMDCNs Develop and Implement WIS component of NCs Develop and Implement WIS component of DCPCs WIS Application Pilot Project Focal Point list Documentation URLs CMAcast and other satellite broadcasting services Summary and feedback – Regional WIS Training Seminar/Questionnaire in RAII, 2010) Glossary of terms and abbreviations Risk analysis of WIS Implementation

12 Structure of R2-WIS-IP Activities for WIS Implementation
1. Regional Meteorological Telecommunication Network   Criteria : Improving GTS network Key Items : GTS, Requirements No Activity Timeline Subject Partner Comment R Improvement of circuit speed NMC RTH Migration to TCP/IP Use of cloud based services (Frame Relay on IP-VPN with MPLS) Expansion of the Internet use for GTS link RTH, NMC

13 Structure of R2-WIS-IP Activities for WIS Implementation
2. RMTN evolution towards AMDCNs   Criteria : Migration from RMTN to AMDCNs Key Items : AMDCN No Activity Timeline Subject Partner Comment Organizing strategic evolution towards AMDCN for the area of responsibility GISC DCPC, NC in responsible area Making permanent network connection (e.g. GTS, Internet, VPN etc) DCPC, NC Principal GISC Clarifying acceptable delay-time for urgent information (message routing, priority handling) Defining AMDCN bandwidth with considering future-oriented data exchange of NWP, radar and satellite products etc. Considering supplementary use of the Internet VPN for cost-effective and secure network services. Considering future-oriented flexibility of evolutional implementation (e.g. migration from IPver4 to IPver6, from uni-cast to multi-cast)

14 Structure of R2-WIS-IP 3. Develop and Implement WIS components of NCs
 Criteria : Technical Implementation of NCs Key Items : Metadata, DAR service No Activity Timeline Subject Partner Comment R Designating WIS focal point and Choice of the Principal GISC 2012 NC WMO secretariat Making a registration and applying for metadata authorization to its Principal GISC Done by 2013 Principal GISC Offering for generating metadata GISC NCs in responsible area Providing metadata generator(tools) Support for metadata for the area of responsibility Validating metadata for the area of responsibility Supporting the monitoring of the regional WIS GISC, NC N Verifying metadata information Modifying, updating and editing metadata Option to be accomplished by GISC Exchanging global GTS data connected to the GTS or WIS with installing its own compatible system Principal GISC, DCPC(RTH), RTH, Providing metadata and DAR service for additional (sub)regional data exchange through WIS If necessary for NC Using the WIS functionality for sending and receiving data with its appropriate metadata description 2013- NC, GISC

15 Structure of R2-WIS-IP 4. Develop and Implement WIS components of DCPCs  Criteria : Technical Implementation of DCPCs Key Items : Metadata, DAR service, Designation of DCPC No Activity Timeline Subject Partner Comment R Designating WIS focal point and Choice of the Principal GISC 2012 DCPC WMO secretariat SR Informing CBS and Principal GISC about to the wish to become a DCPC 2013- WMO secretariat, Principal GISC N Assessing WIS functionality of DCPC based on the Manual on WIS by Principal GISC GISC, DCPC Making a registration and applying for metadata authorization to its Principal GISC Principal GISC Offering for generating metadata GISC DCPCs in responsible area Providing metadata generator(tools) Support for metadata for the area of responsibility Validating metadata for the area of responsibility Supporting the monitoring of the regional WIS Verifying metadata information Modifying, updating and editing metadata Providing suitable distribution mechanism (e.g. satellite distribution, Internet based subscription or others) Principal GISC, Other WIS centres Providing metadata and DAR service for additional (sub)regional data exchange through WIS Using the WIS functionality for sending and receiving data with its appropriate metadata description DCPC, GISC

16 Structure of R2-WIS-IP Recommendation on R2-WIS-IP
to XV-RAII and/or towards later approval by RA-II President Reviewed and updated biannually The scope of R2-WIS-IP : targeting WIS related manager and experts Guideline materials developed by appropriate RA2 Study Groups Facilitating Inter-regional cooperation GISC backup practically considered by operational GISCs WIS APP PP led by five core-members Operational GISCs leading in WIS monitoring in cooperation with others

17 Structure of R2-WIS-IP Recommendation on R2-WIS-IP
to XV-RAII and/or towards later approval by RA-II President Not resolved, added complimentary to R2-WIS-IP Roles of RTH-type DCPCs such as sub-regional data flow management Cyclic review of operational DCPCs by their principal GISCs Implementation Coordination framework in RAII New categories of metadata such as describing geographical information and GISC backup dissemination informaiton Risk management