1 JTAMS MILESTONE A ANALYSIS
15 August FY 0 TEAM # DPM: (Insert Student Name Here) PM: (Insert Student Name Here) JTAMS SW Architecture WBS Structure Assessment Affordability Analysis Title 40, CCA Analysis Measures Analysis Summary/Conclusions Presentation Intro/Overview JRATS/JTAMS Description JTAMS Operational Concept AoA Analysis Acquisition Model Selection IT Box Analysis Student Instructions: Each team will develop the practicum solution slide package using the templated slides provided, the given scenario, and the artifacts provided in the Job Aids folder. All slides will be submitted to the instructors electronically (Blackboard/Shared Drive) and hard copy (printed 2 slides per page and double sided) Each team will designate a PM and Deputy PM to present the results of the analysis prepared by the team. You will have 1.5 hours for research and development of the practicum solution. The PM and Deputy PM will have 8 minutes to present their designated slides.

2 JRATS/JTAMS Descriptions
Provide a brief summary of the background of the JRATS Program (ACAT, MDA, system overview): Provide a brief summary of the background of the JTAMS Program (ACAT, MDA, system overview): What is the current status (where are we in the Acquisition Process in terms of Milestones, Reviews, and approved or working documents)? Practicum 1 Described in the situation and in the front portions of every major document prepared. REFERENCES:

3 JTAMS Operational Concept
Describe the JTAMS required capabilities (use the OV-1 to provide your overview) OV-1 Required Capabilities Practicum 1 Job Aids/System Engineering Plan/FROM THE JTAMS SEP – OV-1 REFERENCES:

4 AoA Analysis What are the 3 alternatives in the AoA?
What did the MDA direct? Why is this a good recommendation? (address capability and cost) What are the potential implications for sustainment? Practicum 1 From the JTAMS AoA found in the Job aids/Analysis of alternatives folder: REFERENCES:

5 Acquisition Model Selection
Select one of the models for JTAMS development, explain the model in additional detail (include risk), and justify your selection. Selected Model Depiction Model Overview (including risk): Practicum 1 Student Scenario, DOD , AS Justification: 5 REFERENCES:

6 IT BOX Analysis Based on the JROCM and the IS ICD, develop the IT Box
Organization & Oversight Chair: Co-chairs Capabilities and Initial Values KPPs KSAs Hardware Refresh and System Enhancements & Integration Cost Controls Lifecycle Cost= Per year = Rationale: Applications & System Software Development Cost Controls • Lifecycle Cost = $ • Per year = $ JTAMS MRES IS ICD Oversight: Program Execution: Practicum 1 Ref: Job Aids/JCIDS/JTAMS MRES IS ICD and the JROCM Ref:

7 JTAMS MILESTONE A ANALYSIS
15 August FY 0 TEAM # DPM: (Insert Student Name Here) PM: (Insert Student Name Here) JTAMS SW Architecture WBS Structure Assessment Affordability Analysis Title 40, CCA Analysis Measures Analysis Summary/Conclusions Presentation Intro/Overview JRATS/JTAMS Description JTAMS Operational Concept AoA Analysis Acquisition Model Selection IT Box Analysis Student Instructions: Each team will develop the practicum solution slide package using the templated slides provided, the given scenario, and the artifacts provided in the Job Aids folder. All slides will be submitted to the instructors electronically (Blackboard/Shared Drive) and hard copy (printed 2 slides per page and double sided) Each team will designate a PM and Deputy PM to present the results of the analysis prepared by the team. You will have 1.5 hours for research and development of the practicum solution. The PM and Deputy PM will have 8 minutes to present their designated slides.

8 JTAMS Software Architecture
Identify the JTAMS Software Architecture and explain the purpose /mission of each sub-system Practicum 1 Ref: Job Aids/SEP Identify the JTAMS Software Architecture and explain the purpose /mission of each sub-system REFERENCES:

9 Work Breakdown Structure (WBS) Assessment
Describe the WBS and identify the reference it was derived from [Insert WBS Picture] Explain why this is a good WBS: Practicum 1 From the SEP, Mil-HBK 881A, ELECTRONIC/AUTOMATED SOFTWARE SYTEMS from MIL-HBK-881A, Appendix B REFERENCES: SEP

10 Affordability Analysis / Cost Estimation
OBD with reuse from Army TAMS TMRR Phase Cost – PAMS with reuse from Army TAMS TMRR Phase Cost - THS with reuse from Army TAMS MRES Unprecedented TOTAL JTAMS TMRR BUDGET = Management Reserve was Practicum 1 See Job Aids / Budgeting DAU Cost Estimator and JTAMS COST ESTIMATE SUMMARY for P1 REFERENCES:

11 Clinger-Cohen Act (CCA) Compliance
# Compliance Action Documentation 1 Make a determination that the acquisition supports core, priority functions of the DoD. 2 Establish outcome-based performance measures linked to strategic goals. 3 Redesign the processes that the system supports to reduce costs, improve effectiveness and maximize the use of commercial off-the-shelf technology. 4 Determine that no private sector or government source can better support the function. 5 Conduct Analysis of Alternatives 6 Conduct an economic analysis that includes a calculation of the return on investment; or for non-AIS programs, conduct a lifecycle cost estimate. 7 Develop clearly established measures and accountability for program progress. 8 Ensure that the acquisition is consistent with the DoD Information Enterprise policies and architecture, to include relevant standards. 9 Ensure that the program has a Cybersecurity Strategy that is consistent with DoD policies, standards and architectures, to include relevant standards. 10 10. Ensure, to the maximum extent practicable, (1) modular contracting has been used, and (2) the program is being implemented in phased, successive increments each of which meets part of the mission need and delivers measurable benefit, independent of future increments. 11 Register Mission-Critical and Mission-Essential systems with DoD CIO (DoD IT Portfolio Repository) Practicum 1 DoDI Table 9 CCA Compliance; PRACT 1 CCA Analysis – identify the current status of the documents/actions required for CCA compliance – documents may be found in a variety of Job Aids folders REFERENCES:

12 Measurement Information Needs
What are the information needs for the JTAMS sub-systems (Include a rationale for your selection)? Information Need Rationale Practicum 1 JOB AIDS/Measures: use Measurement ICM table (see columns “information categories” and “questions”) as a reference – identify appropriate information needs based on the needs of the program at this point in development What are the information needs for the JTAMS sub-systems? You will have to identify the information needs as you refer to the practicum materials. Write down the questions that you want the measures to answer. REFERENCES:

13 Summary of Readiness for Milestone A
JROC Approved ICD? IS ICD? MDD ADM? Completed AoA? AS? SEP? PPP / Cybersecurity Strategy? CCA Compliance? TEMP? Systems and Software Life-Cycle Supportability Plan? Affordability Analysis/POM Estimate? Recommendation? Practicum 1 From DODI entry criteria; various documents are located in the Job Aids folders What is your recommendation for Milestone A? Do we have enough to proceed?