1
ASPEC October 2016 Incidents 0 incident, 0 near misses
Hours 01/10/16-28/10/16 20% Site, 1% Travel, 79% Office
2
ASPEC Sites October 2016 PKCT Site Hours October = 362
September = 495.5 August =
3
HSE Activities HOT TOPICS Fatigue and Work
Fatigue is the feeling of being tired. It is different from feeling sleepy or drowsy. Fatigue can include reduced or no energy, physical or mental exhaustion and/or lack of motivation. Factors may include: Psychological (stress, anxiety), Physical (health related) or Physiological (inadequate rest or sleep, excessive exercise). What can we do: Eat and sleep well, drink water. Reduce your hours of work, where possible Have healthy down-times between shifts, especially when traveling to site or long distances Speak to your Group Leader about stresses impacting your work Try to avoid the mid-afternoon drop in energy by eating protein/carbs at lunch time, go for a walk at lunch time, drinking water encourages you to go for a walk Listen to the radio either via a phone, the internet or a simple radio (make sure it is not going to disturb others)
4
HSE Activities Checklist
First Aid Kits – Recently Audited? Replenished? Incidents to report? ASPEC Vehicles ALSO Monthly Office Inspections - Has your office completed it’s month SAFETY Inspection? No? How about we do one now? Fire Extinguisher Inspections - Has your office completed this recently? Must be completed every 6months and the ASPEC Inspection Register updated.
5
Quality Activities Aspec currently has 18 PCA’s Open
6
Quality Activities Aspec Quality Activities
Current Proposal Procedure is being revised to include sufficient ‘risk assessment’ steps are taken Safety in Design course is being attended. Further details can be found via website link sent by Frank back in September Change Management Work Instruction has been adopted and uploaded into the Member’s Area Design Engineering Work Instruction has been adopted and uploaded into the Member’s Area Approved Suppliers Internal Evaluation Have you been liaising with Sub Consultants this month? Please add an evaluation to the register. While you’re here, we can do one now: Lessons Learned Can you share one with the Team now? click on the link: