Download presentation
Presentation is loading. Please wait.
1
Chris Shaw, EUROCONTROL Experimental Centre
Airborne Separation Assistance System (ASAS) Thematic Network 2: ASAS applications maturity assessment Chris Shaw, EUROCONTROL Experimental Centre
2
Contents of presentation
Introduction Objectives Method Applications Maturity metrics Results Conclusion
3
Introduction ASAS Thematic Network 2
Sponsored by European Commission Directorate General Research 6th Framework Three year project from April 2005 Aim: to accelerate the application of ASAS operations in European Airspace taking into account global applicability in order to increase airspace capacity and safety. Managed by consortium: BAE Systems, ENAV, LFV, NLR, Thales ATM & Thales Avionics, EUROCONTROL (leader)
4
5 ASAS workshops & final seminar
Objectives 5 ASAS workshops & final seminar Malmo (Oct 2005), Rome (Apr 2006) Glasgow (Sep 2006), Amsterdam (Apr 2007), Toulouse (Sep 2007) Web-based ASAS related documentation Annual assessment of the maturity of global ADS-B/ASAS applications by ASAS-TN2 partners Deliverables: Report ”ASAS application maturity assessment” V1 March 2006, update V & V3 due 2008
5
ADS-B Receiver ground-station
Automatic Dependent Surveillance – Broadcast (ADS-B) Mode S Extended Squitter: Europe: In Oct 2006, 54% of flights equipped (38% in Jan 2006) of which 66% broadcasting position (53% in Jan 2006) [source: CASCADE] Hong Kong: In Mar % equipped (32% in Dec 2005) [source: ICAO] ADS-B Receiver ground-station
6
12 ASAS specialists from:
Method (1/3) 18 ASAS applications: ADS-B surveillance Airborne traffic situational awareness Airborne spacing Airborne separation Airborne self-separation 12 ASAS specialists from: BAE systems (UK), ENAV (Italy), LFV (Sweden), NLR (The Netherlands), Thales ATM (France), Thales Avionics (France) and EUROCONTROL
7
Method (2/3) Maturity metrics scale 0 to 4 (±0.5):
Operational concepts Benefits and constraints Safety assessment Procedures and human factors Systems, HMI and technology Transition issues Results reviewed by selected peers from US, Europe and Australia
8
Example metric - Operational concept
Method (3/3) Example metric - Operational concept 1 = Problem statement, identify solutions, concept generation (concept of operations) 2 = Preliminary Operational Concept Description (R&D Operational Service and Environment Description (OSED)) 3 = Draft Requirements Focus Group (RFG) OSED in development (e.g. from R&D OSEDs, trials and experiments, initial OSED) – mature and in review. 4 = Consolidated OSED - Published
9
Results (1/3) - overview
10
Results (2/3) – detailed examples Highest maturity score
ATC surveillance in non-radar areas Lowest maturity score Vertical crossing and passing (Airborne separation)
11
Results (3/3) – maturity rates
Largest increase in maturity score In-trail procedure (Airborne separation) Decrease in maturity score Enhanced traffic situational awareness during flight operations
12
Conclusion Of 18 applications: 7 have total maturity scores in range out of 24, From , 15 applications increased in maturity score (1 new), 2 unchanged, 1 decreased, overall increase 10% Version 1 & 2 of report available on ASAS-TN2 website ( Notification of 17,000 ATM stakeholders through article in EUROCONTROL Experimental Centre newsletter Third assessment by ASAS-TN2 due in 2008
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.