Input coupler assembly, high power and thermal performance in S1-Global at KEK
E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
2
Outline Introduction and QL of variable coupling
Conditioning at room temperature High power performance and Inspection Measurement of dynamic heat load Summary S1-Global cryomodule installed in the STF tunnel E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
3
Input Couplers in S1-Global Cryomodule
AES004 ACC011 Z108 Z109 MHI-05 MHI-06 MHI-07 MHI-09 FNAL cavity DESY cavity KEK cavity Four STF-2 Coupler (KEK) Four TTF-III Couplers (DESY/FNAL) E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
4
QL of Variable Input Coupler
QL = 2.4 x 106 D f bw = 542 Hz Cryomodule – A (STF-2 couplers) Cryomodule – C (TTF-III couplers) 2.4 X 106 E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
5
High Power System in S1-Global
Cryomodule-A 4 KEK cavities (MHI-05, MHI-06, MHI-07, MHI-09) 4 STF-2 couplers (coaxial disk rf window, 60f ) Cryomodule-C FNAL (AES004, ACC011) cav. DESY (Z108, Z109) cavities 4 TTF-III couplers (cylindrical rf window, 40f ) E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
6
RF Processing of Input Couplers
Cryomodule-C /KLY#1 (2MW) Cryomodule-A /KLY#2 (5MW) 0.5 ms, 5 Hz, 500 kW 1.5 ms, 5 Hz, 200 kW Aug. 25 ~ Sept. 07 (10 days) E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
7
RF Processing Time of Input Couplers
at room temperature Cryomodule-A (STF-2 couplers) ave. processing time ~ 13 hours 20 hr Cryomodule-C (TTF-III couplers) ave. processing time ~ 21 hours 20 hr . Vacuum I/L ; 2.x10-4 Pa E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
8
Operational RF power level for 8-cavity operation
Stable operating Eacc (individual cavity operation) Calc. ave. Eacc C : 24 MV/m A : 28 MV/m C&A : 26 MV/m 0.5 ms 1.0 ms After warm-up to an intermediate temperature due to the trouble of cryogenic system, deterioration of vacuum pressure was suddenly occurred in A1 coupler, and operational RF power level was reduced. E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
9
Inspection of STF-2 Couplers after Disassembly
Cold couplers E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
10
Inspection of TTF-III Couplers after Disassembly
C1/ FNAL C2/ FNAL C3/ DESY C4/ DESY E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
11
Calculated and Measured Static Heat Load
by N. Ohuchi (KEK) E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
12
Dynamic Loss Measurements in S1-G
by N. Ohuchi (KEK) C-4 C-1 A-3 A-2 4 C Cavities 4 A Cavities 4 A Cavities 7 Cavities Date Nov. 17 Nov. 19 Nov. 23 Nov. 24 Nov. 25 Nov. 26 Nov. 30 Dec. 2 Dec. 3 Dec. 9 Dec. 10 Gradient 28 MV/m 25.2 MV/m 32.3 MV/m 38 MV/m 32 MV/m Detune 20 .0 MV/m 26.9 MV/m 25.4 MV/m 20.4 MV/m Dynamic Loss 0.84 W 1.44 W 2.8 W 4.8 W 2.6 W 2.7 W 6.9 W 9.6 W Detuned Loss 0.09 W 0.18 W 0.7 W 1.8 W 1.2 W 0.5 W 4.6 W 0.2 W 2.5 W 1.6 W Dynamic Loss at Cavity 0.75W 1.26 W 2.0 W 2.9 W 1.3 W 4.4 W 7.0 W 3.2 W Q0 8.8E9 4.3E9 4.2E9 6.5E9 C1=22.2 C2=18.9 C3=14.9 C4=24.3 A1=15.8 A2=37.6 A3=32.9 A4=21.4 C1=25.2 C2=NA C3=17.6 C4=28.8 A1=15.3 A2=37.4 A3=32.4 A4=20.9 C1=20.1 C3=14.1 C4=23.0 A1=12.3 A2=30.4 A3=26.0 A4=16.7 Dynamic losses of KEK couplers was 9 times larger than those of TTF-III couplers. E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
13
Dynamic RF Loss of TTF-III Input Couplers
by N. Ohuchi (KEK) E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
14
Dynamic RF Loss of STF-2 Input Couplers
by N. Ohuchi (KEK) E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
15
Temperature Distribution around 5K in A2 Cavity
E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
16
Temperature Distribution around 80K in A1/A2 Cavity
E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
17
Further studies in STF-2 couplers
Reduction of static loss Reduction of dynamic loss Efficient cooling by thermal anchor STF-2 input coupler for S1-G Two input couplers for QB-Cryomodule 0.8t SUS + Ni strike plating (0.2um) + Cu plating (3um) → Ni/Cu alloy (high R) Elimination of bellows (Coupler-B, 10um) (Coupler-A, 5um) Poor cooling to 5K → avoiding Ni-strike plating E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
18
Sample tests of Cu plating on Au strike plating
1. Gold strike plating of 0.2 um and Cupper plating of 3 um on 0.8t SUS pipe 2. After 800 oC Heat Treatment 3. After 1st heat cycle to 4.2 K 4. After 2nd heat cycle to 4.2 K E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
19
SUMMARY Four TTF-III input couplers and four STF-2 input couplers were successfully conditioned and operated at high RF power of 100~450 kW in S1-G cryomodule. Vacuum deterioration occurred in one STF-2 coupler. Disassembly troubles happened in two TTF-III couplers. Larger dynamic heat loads in STF-2 couplers than that in TTF-III couplers were observed. Improvements of RF losses in STF-2 couplers are under going. E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
20
END Thank you for your attentions ! TTC meeting in Beijing
E. KAKO (KEK) ' Dec. 07 TTC meeting in Beijing
21