Add 2 Zinc Stations + Tank Relayout Need to confirm the space with PTI
Capacity Up Plating 3 Add 2 Zinc Stations + Tank Relayout Transfer Rinse Degreasing Rinsing 2 Rinsing 1 Pickling 2 Pickling 1 Rinsing 3 Ultrasonic Rinse 1 Plating 4 Plating 3 Plating 2 Plating 1 Rinsing 4 Chromating Airblow Hot Water Rinsing Drying 1 Drying 2 Drying 3 Cooling 1 Cooling 2 Cooling 3 Accumulator 1 Accumulator 2 Accumulator 3 Accumulator 4 Accumulator 5 Accumulator 6 Accumulator 7 Accumulator 8 Accumulator 9 Accumulator 10 Accumulator 11 Accumulator 12 Loading-unloading Rinsing 5 Plating 6 PLating 5 Before After Improvement :Add 2 Zinc Stations Dipping time 900” CT Before = (900”+60”)/(4station x 4unit) = 60”/unit Capacity Before = 3600”/60” = 60units/hr CT After = (900”+60”)/(6station x 4unit) = 40”unit Capacity After = 3600”/40” = 90units/hr 1 How To Move Drying oven southward (to the right in the layout) Modify oven ducting + cooling ducting Modify program from 12 accumulator 10 Move Chromating tank to oven side and install addtional 1 rinsing tank Put Zinc tank and rinsing 4 tank Install zinc tank equipment 5&6 4 2&3 Need to confirm the space with PTI
2
Add 2 Zinc Stations + Tank Relayout
Capacity Up Plating 3 Add 2 Zinc Stations + Tank Relayout Activty Lead Time Investment Estimation Move and cut 2 Accumulator 2 days stop (weekend) - Move Cooling ↑ Move Drying Modify Drying ducting Rp Modify program Accumulator 12 => 10 Move Chormating tank to Drying side Instal Single Rinsing tank after Chromating (ex AAIJ) Take Out Double Rinse tank Put Plating tank 5&6 Rp Put Single Rinse tank after Plating (ex AAIJ) Install Plating tank connection Rp Install 4 Vblock, busbar, 6 Titanium basket ingot (take from Plating 6) Rp Install piping, nozzle , 4 pumps 5 days – normal working day Wiring and Programming Chemical make up Trial
3
Additional 2 Zinc Station Plating 3
Add 2 Zinc Stations + Tank Relayout Transfer Rinse Degreasing Rinsing 2 Rinsing 1 Pickling 2 Pickling 1 Rinsing 3 Ultrasonic Rinse 1 Plating 4 Plating 3 Plating 2 Plating 1 Rinsing 4 Chromating Airblow Hot Water Rinsing Drying 1 Drying 2 Drying 3 Cooling 1 Cooling 2 Cooling 3 Accumulator 1 Accumulator 2 Accumulator 3 Accumulator 4 Accumulator 5 Accumulator 6 Accumulator 7 Accumulator 8 Accumulator 9 Accumulator 10 Accumulator 11 Accumulator 12 Loading-unloading Rinsing 5 CT Before : 30”/u = 60u/h Improvements : Relayout Oven, Cooling, Hot water , Chromating Balancing 4 transporters program Before Transfer Rinse Degreasing Rinsing 2 Rinsing 1 Pickling 2 Pickling 1 Rinsing 3 Ultrasonic Rinse 1 Plating 4 Plating 3 Plating 2 Plating 1 Chromating Airblow Hot Water Rinsing Drying 1 Drying 2 Drying 3 Cooling 1 Cooling 2 Cooling 3 Accumulator 1 Accumulator 2 Accumulator 3 Accumulator 4 Accumulator 5 Accumulator 6 Accumulator 7 Accumulator 8 Accumulator 9 Accumulator 10 Loading-unloading Rinsing 4 Rinsing 5 Plating 6 PLating 5 CT after : 20.65”/u = 80u/h After