Khuzestan Regional Electric Company
In The Name Of God Khuzestan Regional Electric Company
2
Khuzestan Regional Electric Company
3
Khuzestan Regional Electric Company
Estimated population in : Khuzestan: people Kohgiluyeh Boyer: 765,550 people Total: people Area of operation: 80,482 square kilometers Operational areas of Khuzestan Regional Electric Company 3
4
Diagram Of Installed Capacity (Product & Transition)
400 KV 400 KV over head lines:1969 k.m H G 2395MVA 7399MW 972MW 230KV over head lines:2360 k.m 230 KV 4800MVA H S G 4355MVA 520MW 2268MW 621MW 132KV over head lines:4176 k.m 132 KV Nominal Capacity Of Installed Power Plant 3114MVA KV MW 400 8371 230 3603 132 175 SUM 12149 8183MVA H 33KV 175MW 230MVA 2132MVA 11KV 4 4
5
Consumption of electricity Energy (March – July 2015)
Installed Power Plant (MW) MW Description 1850 RAMIN Governmental Thermal Power Plant 815 ABADAN Private 418 ZERGAN. 972 KHORAMSHAHR. 4055 Sum 2000 ABASPOUR.DAM Hydro Electric Power Plant 520 DEZ.DAM 399 KARKHEH.DAM MASGED SOLAIMAN.DAM 75 MAROON.DAM KAROON3.DAM 100 MOLASADRA.DAM 1000 Gotvand.DAM 8094 12149 Total 7521 Peak Load (Mwh) Consumption of electricity Energy (March – July 2015) 5
6
Khuzestan Regional Electric Company
Appendix Large scale >25MW Power Plants Wind Energy Solar Energy Recycling CO2 Finance Small scale <25MW
7
First section Large Power plant
8
Capacity Investment In Power Plants(Large Scale)
Capacity(Mw) City Row 500 Rahmormoz 1 south ahvaz 2 Arvand 3 Andimeshk 4 Masjed Soleyman 5 2500 TOTAL
9
Second Section Distributed Generation
Khuzestan Regional Electric Company Second Section Distributed Generation
10
Capacity Investment In Power Plants (Small Scale)
Capacity(Mw) Place(substation) Raw 25 south Ahvaz 1 North Ahvaz 2 Molasani 3 Tavana 4 Main Abadan 5 Main Shoshtar 6 Omidieh 1 7 40 Mail 8 Hendijan 9 Mohamad abad 10 Ezeh 11 Haftape 12 Zibashahr 13 FatholMOBIN 14 350 TOTAL
11
protecting Laws for Distributed Generations
Free Transfer of Land in industrial Estates 1 Transfer of Land to rent long Term in Place of Electricity Posts 2 If efficiency of more than 50% then paid a Quarter of the Price of Fuel 3 Down Payment Electricity Purchases by the Electrical Companies 4 Instruction
12
Renewable Energy Power Plant
13
The process of investment in construction of non-governmental renewable power plants
In parallel with fulfillment of principle 44 of the Constitutional Law concerning improvement and development of partnership of private sector in the national economic activities and for the purpose of protecting fossil energy sources and environment, assisting in diversification of energy sources aiming at sustainable development and passive defense and also in parallel with encouraging the private sector to invest and participate in the generation of electricity from renewable and clean sources, Ministry of Energy has put among its policies the guaranteed purchase of electricity generated by these power plants. ln this regard, based on approval No.94/23773/60/100 dated July 21, 2015 of the respected minister of energy, the electricity generated by those power plants is purchased as follows.
14
Guaranteed electricity purchase tariff (IRRs per kWh)
On the implementation of the legal obligations of Ministry of Energy, the guaranteed electricity purchase tariff for types of renewable and clean energy are notified as follows: Row Technology type Guaranteed electricity purchase tariff (IRRs per kWh) 1 Biomass-landfill 2900 Biomass- The anaerobic digestion 3150 Biomass- incineration 5870 2 Wind farm above 50 megawatt capacity 4060 Wind farm with the capacity of 50 megawatt and less 4970 Wind with the capacity of 1 megawatt and less (allocated to the subscribers and limited to the distribution capacity) 5930 3 Solar farm above 10 megawatt capacity 5600 Solar farm with the capacity of 10 megawatt and less 6750 Solar with the capacity of 100 kilowatt and less(allocated to the subscribers and limited to the distribution capacity) 8730 Solar with the capacity of 20 kilowatt and less(allocated to the subscribers and limited to the distribution capacity) 9770 4 Geothermal (including excavation and equipment) 5770 5 Turbo expanders 1800 6 Waste Recycling in industrial processes 3050 7 Small hydropower with the capacity of 10 MW and less 3700 8 Other types of renewable and clean power plants except hydropower 4873
15
The executive process of investment in construction of renewable energy power plants
16
Applicants for constructing nongovernmental renewable power plants shall send to this organization the respective worksheets together with a written application plus the required documentations including statute, official gazette, notice of registered changes of company and specifications of the site so that a construction license for a specified capacity in a definite location is issued. After obtaining other required licenses such as the license for environment, network connection and land possession, a contract for purchasing long term electricity will be exchanged with the applicant so that the applicant commences executive operations for the period of power plant construction. ln the garbage-based biomass power plants and small hydro power plants, permits for the use of garbage-based biomass power plants and water transmission lines and flows are required, respectively. It should b noted that Ministry of Energy and the Renewable Energy Organization of Iran are not able to grant any facilities and concessions to execute the projects of private sector and it will pay for the cost of generated electricity only after the completion of power plant in accordance with the guaranteed purchase contract.
17
Khuzestan Regional Electric Company Third Section Wind Energy
18
Guaranteed electricity purchase tariff (IRRs per kWh)
Khuzestan Regional Electric Company On the implementation of the legal obligations of Ministry of Energy, the guaranteed electricity purchase tariff for types of renewable and clean energy are notified as follows: Row Technology type Guaranteed electricity purchase tariff (IRRs per kWh) 1 Wind farm above 50 megawatt capacity 4060 Wind farm with the capacity of 50 megawatt and less 4970 Wind with the capacity of 1 megawatt and less (allocated to the subscribers and limited to the distribution capacity) 5930
19
Khuzestan Regional Electric Company Iran Wind Atlas Altitude of 60 m
Wind Energy: Based on the studies on the potential of different renewable energy sources, the technical potential of wind energy has been estimated more than MW of which more than MW is estimated economically.
20
Khuzestan The Position of windy Areas in South
Khuzestan Regional Electric Company The Position of windy Areas in South Iran Iraq Khuzestan Kuwait Persian Gulf The Capacity for Installing Turbine in coastal Regions and vast Plains in West and South of Province
21
Khuzestan Regional Electric Company The Profile for studied Turbines
22
Wind Resource Assessment
Data Acquisition in Abadan and Mahshahr Sites 1 Measuring Altitudes of Wind Speed Heights of 10, 30 and 50 meters 2 Different Types of Anemometer made by Thies 3 Studies on Wind direction Heights of 30 and 48.5 meters 4 International Consultant German company Lahmeyer 5 Domestic Consultant Iranian Company Moshanir 6
23
Wind Points وضعیت انرژی باد در استان خوزستان : آبادان خرمشهر
وضعیت انرژی باد در استان خوزستان : براساس مطالعات انجام شده و نصب دکل و تجهیزات لازم و برداشت اطلاعات باد از قبیل سرعت ، جهت و دما در ارتفاعات 10 ، 30 و 40 متر در شهرهای : آبادان خرمشهر اروند کنار ماهشهر هندیجان شوشتر ایذه نشان از وجود پتانسیل بالای احداث نیروگاه بادی در استان خوزستان دارد. که در این راستا مناطق جنوبی استان در سواحل دریا از سرعت باد نسبتا مطلوبتری برخوردارمی باشند. متوسط سرعت باد در استان خوزستان در مناطق مطالعه شده آبادان و ماهشهر حدود 7 متربرثانیه می باشد و بر اساس مطالعات انجام شده نصب توربینهای بادی با قدرت 1.5 مگاوات و 2 مگاوات کاملاٌ اقتصادی و مقرون به صرفه می باشد. Wind Points
24
The Result of Wind Speed Analysis in Abadan
Khuzestan Regional Electric Company The Result of Wind Speed Analysis in Abadan The optimal Capacity of Wind Energy at an average Speed of meters per Second in Abadan
25
Khuzestan Regional Electric Company The Result of Wind Speed in
Mahshahr The optimal Capacity of Wind Energy at an average Speed of meters per Second in Mahshahr
26
Estimating the Yield Energy from Abadan Site
Khuzestan Regional Electric Company Estimating the Yield Energy from Abadan Site The Capacity of economic Turbines and 2 MW
27
Estimating the Yield Energy from Mahshahr site
Khuzestan Regional Electric Company Estimating the Yield Energy from Mahshahr site Economic Capacity for Installing and 2 MW Turbines
28
Khuzestan Regional Electric Company
Fourth Section Solar Energy
29
Khuzestan Regional Electric Company
On the implementation of the legal obligations of Ministry of Energy, the guaranteed electricity purchase tariff for types of renewable and clean energy are notified as follows: Row Technology type Guaranteed electricity purchase tariff (IRRs per kWh) 3 Solar farm above 10 megawatt capacity 5600 Solar farm with the capacity of 10 megawatt and less 6750 Solar with the capacity of 100 kilowatt and less(allocated to the subscribers and limited to the distribution capacity) 8730 Solar with the capacity of 20 kilowatt and less(allocated to the subscribers and limited to the distribution capacity) 9770
30
Investment in Solar Energy (Photovoltaic)
Khuzestan Regional Electric Company Investment in Solar Energy (Photovoltaic)