HPP USTIKOLINA Sarajevo, May 2017
2
Location
3
Basic Technical data HPP Ustikolina based on Preliminary Design
Normal (maximum) back water level 373,0 m.a.s.l. Usable reservoar capacity 2,70 x 10 hm³ Length of reservoar 9,35 km Height od dam above natural ground 19,00 m Width of dam in weir crest 15,00 m Length of dam in weir crest 207,50m Installed flow 450,00 m³/s Designed head 14,50 m Number of units 3 Maximum power of the power plant 60,48 MW Annual production of el. energy 236,80 GWh
4
HPP Ustikolina – description of the plant
HPP Ustikolina is run- of river hydropower plant with small reservoar and the power house in the dam body Investment cost in construction is 141,17 mil EUR The location of the dam is: 14 km upstream of Goražde and 16 km downstream of Foča HPP Ustikolina is located in two municipalities, municipality Foča-Ustikolina, and municipality Goražde
5
Decision of the Government of F BiH and completition of Project Documentation
Decision of the Government of F BiH, The public interest for the preparation and construction of priority electricity facilities in the F BiH , including HPP Ustikolina 2009 signed Contract for the Preliminary design of HPP Ustikolina, with the Company "Energoinvest" dd Sarajevo Preliminary Design- I Phase is completed with no research works Continuation of the project is not possible without research works, environmental permit, urban planning permit and other approvals
6
Expected effects after the construction of HPP Ustikolina
Securing our own energy source for electricity supply of Bosnian-Podrinje Goražde Canton Increase in stability of electricity supply in the region This significant investment will contribue to economic growth and development of municipalities Foča-Ustikolina and Goražde, Bosnian-Podrinje Goražde Canton and F BiH Increase in percentage of participation of electricity production from hydro potential, from renewable energy resurces and contribution to the total decreasing in CO2, NOx emissions Employing domestic workforce during construction and operation, create jobs and improve living standards
7
Contact details: JP Elektroprivreda BiH d. d
Contact details: JP Elektroprivreda BiH d.d.–Sarajevo Vilsonovo šetalište 15, Sarajevo General manager: Bajazit Jašarević Tel: