1
TESLA Rocket Internship 11/29/2016
2
Team Task Assignment Discussions
From Last Class Team Task Assignment Discussions Download copy of either “Open Rocket” or “RASAero” Print rocket cross section? Challenge Questions What is our total impulse What is the Isp of the liquid engine What is the expected apogee altitude Sea level launch altitude 100 lbf main engine 30 sec burn time 45 lbf BOL mass
3
Terms Total Impulse (Itot) = Thrust * Burn Time
{100 lbf * 30 sec}ligud + {125 lbf * .8 sec}solid 3100 lbf-sec 13,789 N-sec Specific Impulse (Isp) = Thrust / Propellant mass flow rate (mdot) 100 lbs (for the main engine) 0.445 lbs/sec Isp = 225 sec
4
Subsystem Teams Kevin Ann Charles Dick Bob Cliff Steve Overton Kim
Mike Vivian Liz Ann Bovee (Aerojet Rocketdyne) Liz Driscoll (Aerojet Rocketdyne) Mike Harris (Boeing) Kevin Kelleher (Aerojet Rocketdyne) Bob Masse (Aerojet Rocketdyne) Cliff Olmstead (Aerojet Rocketdyne) Steve Overton (Aerojet Rocketdyne) Steve Sergev (Boeing Retired) Richard Smith (Aerojet Retired) Charles Sota (Aerojet Rocketdyne) Vivian Tsui (Aerojet Rocketdyne) Kim Wierenga (Aerojet Rocketdyne)
5
Preliminary Project Task Summary (11/20)
Program Management: Competition / Launch Location I.D. Program Milestone definition & Schedule Competition Requirements Summary (as required) Aerojet Rocketdyne Grant Proposal Project finances approach Fund Raising Travel logistics Contact list Team lead Systems Engineering: Document station markings (current config) Mass prop documentation (MOI measurement) Develop engine/motor model Flight performance analysis (off rail, first 100 ft ) Develop OML model in RASAero/Open rocket Flight performance (vel, altitude as a function of time) Fin aero loading model development Update performance predictions for new OML (payload section) Ground Support & launch Ops: Familiarization of GSE Identify modifications needed & fix MAP gas supply Rocket installation process on launch rail Wiring Electrical ignition system Launch rehearsal Review & update procedures Propulsion: Engine inspection GHe isolation valve repair System leak test (system upgrade complete) Fab new engine ignitors Pyrogen ignition development (for SRMs) Prop loading procedure review and update Team lead Payload: Identify payload Establish SWAP & telemetry needs Fab payload components Payload AI&T Payload integration into rocket Avionics: GHe drive electronics development Telementry system familiarization Update TLM power-up process (switch?) Integrated system test
6
Presentation to the Washington Aerospace Club
When: This Saturday at 7:00 pm Where: Google campus Kirkland The Plan: Need to pick up rocket from school Saturday ~ 6:00 Meet at Google 6:45 Bring rocket cross section drw Pictures / video Prepare to discuss the project
7
Propulsion Feed System
Service Valve Check Valve Pressure Regulator Pyro Isolation Valve Relief Valve Helium Liquid Oxygen Ethanol Fuel Valve Oxidizer Valve
8
Next Class Program Management Lecture PM Team – Preliminary information on potential launch competitions Schedule Development