THEMIS Mission Assurance
Mission PDR Ron Jackson University of California – Berkeley (510)
2
Status of PAIP UCB At GSFC for approval
- TUBS (FGM) At GSFC for approval - CETP (SCM) At GSFC for approval - SWALES (Probe) At GSFC for approval
3
QA Requirements and Documentation Performance Assurance Implementation Plan (PAIP) THM_pa_001A.doc Version A-2003-Sept 30
4
Responsibilities of Mission Assurance
Flow-Down of PA Requirements - FGM / TUBS - SCM / CETP - Probe / Swales Use of Previously Flown Hardware - Will be subject to PA requirements Comply with EWR127-1 requirements for safety Establish and support spacecraft system safety plan Perform Preliminary Hazard Analysis (PHA) Maintain hazard control verification log - Conduct daily tailgate meeting during I&T - All RED TAG and/or GREEN TAG items shall be removed or added prior to system test - All RED TAG items shall be removed prior to flight - All GREEN TAG items shall be added before Flight Develop safety noncompliance reports as required
5
Responsibilities of Mission Assurance
EEE Parts Requirements - GSFC-311-INST-001 - Parts Derating - Radiation tolerance - Alerts - Parts age control - Parts Control board Materials and Processes Controls - Hazardous materials requirements - Vacuum outgassing requirements - Materials lists
6
Responsibilities of Mission Assurance
Procurement and Subcontractor Controls Receiving Inspection Clean Room Controls Manufacturing and ESD Controls Calibration Controls Personnel Training and Certification to NASA Standards
7
Quality Standards Manufacturing, Assembly, and Quality Control of Electronic System will be in compliance to the following NASA technical standards: NASA-STD Workmanship Standards for Staking and Conformal Coating of Printed Wiring Boards and Electronic Assemblies NASA-STD Workmanship Standard for Surface Mount Technology NASA-STD Soldered Electrical Connections NASA-STD Crimping, Interconnecting Cables, Harness, and Wiring NASA-STD Electrostatic Discharge Control
8
Training Instrument Technician Certification Status
9
Inspections, Tests & Reports
In-process Inspection and Test Monitoring During Manufacturing Integration and Testing Readiness Review / Test Witness Verification and Environmental Test Review Final Acceptance Data Package Problem Failure Reporting and Review - Failure verification testing prior to PFR closure Configuration Management and Data Control - QA shall verify and sign off on changes Internal and External Auditing - inprocess and vendors Support Test Readiness Reviews and Pre-Ship Reviews Contamination Control Plan Software Assurance Plan - Revision control and test verification by QA - Problem reporting and retest verification by QA
10
Supplier Audit Status CETP C Swales P University of Colorado P
ICS Radiation Tech P Valley Circuits A Speedy Circuits A Wyle Labs A Corwil A Maxwell A ECR Labs A Golden Altos Inc. A UTMC A Sierra Circuits A Rigiflex Tech A TUBS C Notes: Approved = A Pending = P Conditional = C