1 ? ENDCAP: Mechanics IFIC-Valencia

2 Petal Concept: Components
Petal mass estimation Mass (g) Facings + Honeycomb + Epoxy 227,9 POCOFOAM 50,6 SS Pipe 73,4 SMC 95 CGL 60 Bus Cable + Epoxy 85,3 Silicon 107,5 Chips 12,4 Hybrid + BeO + Epoxy 116,5 Total 828,6

3 Petals: Sensors Overlap and Dimensions
Rout: 958mm mm Silicon Rout: 951mm Overlap Rout: 3mm Silicon Rin: 334.5mm Overlap Rin: 3mm 80mm Rin: 327mm

4 Petals: Sensors Overlap and Dimensions
Rout: 958mm mm Rout: 11mm Silicon Rout: 951mm Overlap angle: 12mrad ATLAS PROJECT DOC No: Utopia V1.0 N.P. Hessey Silicon Rin: 334.5mm Rin: 4mm 90mm Rin: 327mm

5 Disks: Sensors Overlap
Y Rin: 4mm Disk rotation is not allowed by this design X Overlap angle: 12mrad (as example) Disk could be reflected 180º (plane XY) No Disk overlap; symmetry is maintained by sensors on both petal sides on every Disk and therefore Petals are reduced 11mm at Outer radius. With Disk overlap symmetry is maintained by only sensors on one Petal side on every Disk. Rout: 11mm 11.25º 11.25º

6 Short Strips on rings 4 & 5 8 6 2x10 4x8 4x6 2000 μW/mm2 1700 μW/mm2

7 Thermal Runaway 8 6 2x10 4x8 4x6

8 How does layout affects to Petals?
3 different Disks and 4 different Petals Covering from R325 up to R950mm Similar distances between disks 120mm clearance to barrel and pixel 1 different Disks and 2 Petals shapes Covering from R336 up to R951mm Different distances between disks; different petal insertion. 60mm clearance to barrel and less than 20mm to closest pixel disk

9 CF Inner Cylinder Apertures on Outer cylinder to permit services exit
8 support bars constrain disks Inner cylinder with 4 different diameters to constrain disks and sustain petals Master disk supports entire structure

10 CFRP-KOREX Disks 1.- Master Disk + Support bars + Inner cylinder
2.- Disks are assembled into the structure.

11 CF Frames

12 Lateral Support Beams

13 Services Support Rings

14 (4/16) Rows of Petals: Insertion

15 (4/16) Rows of Petals: Services and Testing
40 petals from 160 (25%)

16 (12/16) Rows of Petals: Insertion

17 (12/16) Rows of Petals: Services and Testing

18 Outer Cylinder Rails: EC Insertion

19 ENDCAP Envelope

20 Services: cabling Capillaries Services estimation includes:
Opto fibers x18 HV cabling x18 LV cabling x2 Inlet and Outlet capillaries DCS x18 Al service channel Capillaries Total per petal (g/mm) 0, Total per Disk (g) Services Disk 1: from z: 2956mm to z: 1376mm 19972,5192 Services Disk 2: from z: 2956mm to z: 1476mm 18708,43571 Services Disk 3: from z: 2956mm to z: 1744mm 15320,69194 Services Disk 4: from z: 2956mm to z: 2141mm 10302,28047 Services Disk 5: from z: 2956mm to z: 2791mm 2085,737765 Total 5 Disks (g) 66389,66509

21 Accessible area after services
40 petals from 160 (25%) +12 (32,5%) +12 (40%) 1.4m

22 Services Connections 2D-Layout: conflictive area
MANIFOLDING CONNECTIONS: AREA 3 CONNECTION POSSIBLE? IF NOT DIF. PIPES PER DISK 1.4m

23 Next Steps: Electrical Services, SMC, connectors
Petal insertion - 3points support

24 Next Steps: F.E.A. Disks & Rings

25 Next Steps: 3D Layout Services
Connectors or dif. Pipes? Pressure Losses admissible? Manifold X4? X5? 3D Layout Services

26 Next Steps: Mechanical Tests SETUP
Deflections Modal test All possible information to check F.E.A Thermal Test / Electrical prototype? CO2 cooling plant Thermal camera CMM o Vision CMM?