1 NCCA / PCCA status and plannig Alice Upgrade
Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax : Contacts at IPNO : Khaing Mon Mon TUN-LANOË +33 (0) K.M.M. TUN-LANOË

2 RAPPEL TITRE PRESENTATION
samedi 30 juin 2018 Ncca status NCCA 23 boards ordered, 20 boards are OK, + 1 board with Channel 9 broken, ok for radiation test. 1 board (V1_13) : 3 LDO are broken. This board is at Systech to replace these LDO. Orsay will keep it. 1 board (V2_5) : VDD_DG short. Before bonding, there is no short so we suspect this problem occurs due to bonding. Need to investigate more, may be X-ray tests. 1 board (V1_3) : Channel 9 is broken in SAMPA chip. But we can continue tests with it. Oslo keep it. 7 Boards (Bergen, Brazil, Japan and Russia) will be sent in mid August because the transportation department is closed now in France. Anders will take the boards for Oakridge and Tonko. Participants (Tests and Repairs) : Bruno SANCHES (Sao Paulo) Arild VELURE, Ganesh TAMBAVE (Bergen) Anders OSKARSSON, Ulf MJORNMARK (Lund) Sohail Musa MAHMOOD (Oslo) Patrie RUSSO, Valérie CHAMBERT, Khaing Mon Mon TUN-LANOË, Gwenaël BRULIN, Nicolas METEYE, Clément DE BARBARIN (Orsay) ORSAY TEST GROUP ALICE UPGRADE Khaing Mon Mon TUN-LANOË

3 List of MPW2 test boards TEAM NCCAx Delivery Total 1st Version
2nd Version Taken To deliver Tonko 1 V1_8 TPC-Bergen 4 2 V1_6, V1_9, V2_2 V2_5 TPC-Oslo V1_2S, V1_3, V2_1, V2_10S TPC-Oakridge V2_6 TPC-Lund V1_1, V2_4 TPC-Tokyo and Nagasaki V2_3 MCH 3 V1_5, V1_13, V2_7 Sergey V1_11, V1_12 São Paulo 5 V1_10, V2_8 V1_4, V1_7, V2_9S 23 13 10 17 6 Contacts at IPNO : Khaing Mon Mon TUN-LANOË +33 (0) K.M.M. TUN-LANOË ALICE UPGRADE

4 RAPPEL TITRE PRESENTATION
samedi 30 juin 2018 Pcca planning Prototypes : 2 PCCA-Socket + 2 PCCA Steps Date Remarks 1 Send files for production to Systech 21st June 2 Production : Stand by 23rd June 3 Redesign Schematics and Layout 27th June – 30th June 4 Send modified files for production to Systech 1st July 5 Prototypes’ PCB production (PCCA-Socket and PCCA) 4th July – 22th July 6 Reply of Wurth via Systech 18th July 7 20th July – 3rd August 8 Prototypes’ Populating (PCCA-Socket) 4th August – 10th August 9 Prototypes PCCA-Sockets’ short and vérification tests for serie’s validation 11th August – 12th August We cannot valid PCCA (with packaged chip) 10 Green light for serie’s PCB production (PCCA-Socket and PCCA) 16th August 11 Serie’s PCB production (PCCA-Socket and PCCA) 16th August – 9th September 12 Serie’s populating (PCCA-Socket and PCCA) 12th September – 16th September 13 Serie’s short test at Orsay 19th September – 23rd September 14 Delivery to Labs 26th September Planning for packaged chip tests not included. K.M.M. TUN-LANOË ALICE UPGRADE Khaing Mon Mon TUN-LANOË