Catania Jan ’14 KM3NET Italy Marine Operations CTF change out

Similar presentations


Presentation on theme: "Catania Jan ’14 KM3NET Italy Marine Operations CTF change out"— Presentation transcript:

1 Catania Jan ’14 KM3NET Italy Marine Operations CTF change out
Klaus Leismüller

2 CTF change out – L3 feedback
Turn key solution/Technical requirements “AS IS” (see drawing) INFN MVC L3 splitter box and CTA L3 Frame In: INFN subsea cable Out: ODI hybrid NRH 4 fiber, 2 electrical, PC type, key alignment: facing down Extensive qualification experience Tested and proven solution with reference projects. INFN is not the ‘test’ client. L3 has broad experience building sea bed networks Delivery 9 months after contract award

3 CTF

4 Capo Passero Site Condition

5 Installation sequenze

6 Installation sequenze

7 Thank You!

8 Marine Operations Tender has been answered. Evaluation 20/21.01.2014
Marine Operations Window March to October 2014 Equipment to be delivered to Malta minimum1 week prior to deployment Testing of equipment onshore mandatory