1
Catania Jan ’14 KM3NET Italy Marine Operations CTF change out
Klaus Leismüller
2
CTF change out – L3 feedback
Turn key solution/Technical requirements “AS IS” (see drawing) INFN MVC L3 splitter box and CTA L3 Frame In: INFN subsea cable Out: ODI hybrid NRH 4 fiber, 2 electrical, PC type, key alignment: facing down Extensive qualification experience Tested and proven solution with reference projects. INFN is not the ‘test’ client. L3 has broad experience building sea bed networks Delivery 9 months after contract award
3
CTF
4
Capo Passero Site Condition
5
Installation sequenze
6
Installation sequenze
7
Thank You!
8
Marine Operations Tender has been answered. Evaluation 20/21.01.2014
Marine Operations Window March to October 2014 Equipment to be delivered to Malta minimum1 week prior to deployment Testing of equipment onshore mandatory