Download presentation
Presentation is loading. Please wait.
Published byCandice Hudson Modified over 6 years ago
1
Steve Gigliotti Chief, Division of Safety Coal Mine Safety & Health
ERP Status Overview Steve Gigliotti Chief, Division of Safety Coal Mine Safety & Health
2
Overview Number of approved ERPs Number of installed systems
5
C&T Inspection Procedures
PIL being drafted Compliance with ERP PPL P09-V-01 Qs & As System components Part 23 approved Verify C&T system is operational by randomly communicating during inspection and comparing route of travel with electronic records on the surface
6
C&T Inspection Procedures
Responsible person on surface to monitor location of miners underground ( ) Two way communication inside RA ( ) Identifying number on miner’s brass tag worn on belt matches identifying number in system ( ) Minimum safe distance to prevent interference with blasting circuits ( (a)) C&T systems shall remain operational during fan stoppages or a mine power outage (75.313)
7
Overview - Consolidate Q&A documents for next round of ERPs
8
QUESTIONS?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.