SIS100 quadrupoles production @ Dubna: status
S. Kostromin, IKCW, GSI, 4 Nov, 2015
2
2
3
Manufacturing Design Review: Tomorrow @ GSI
Quad Sextupole Steerer Mult. Corr 3
4
SIS100 Chromaticity Sextupole Magnet: cryogenic tests
AC losses 4
5
Facility for SC magnets assembling & test
The facility is designed for round the clock assembly and cryogenic testing of Nuclotron-type SC magnets. The following magnets will be assembled and tested at the facility: 40 dipole magnets for the NICA booster; 24 quadrupole doublets with multipole correctors for the NICA booster; 171 quadrupole magnets with multipole correctors for the SIS100 synchrotron (FAIR project); 80 dipole magnets for the NICA collider; quadrupole magnets with multipole correctors for the NICA collider. 5
6
Facility for SC magnets assembling & test
Cryogenic tests hall: Cryogenic tests od SC magnets Magnetic LHe temp Satellite refrigerator units Power supply Cable-connection system 6 Test benches Magnet feedbox 3 of 6 => for SIS100 Quads Tests
7
Facility for SC magnets assembling & test
7
8
Magnets testing One SIS-100 magnet ~ 2 weeks LN2 LHe ManPower
~10.5 ton ~4000 liters ManPower ~ kW*h ~17 man х month Electrical power 8
9
Magnets testing Need to be contracted GSI/FAIR testing requrements
Nuclotron magnet JINR experience New facility premises GSI/FAIR testing requrements Need to be contracted
10
Thanks for your attention
Work packages Thanks for your attention Testing of magnets – not contracted yet – can interrupt workflow in 10