Presentation is loading. Please wait.

Presentation is loading. Please wait.

Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR 01.01.2015.

Similar presentations


Presentation on theme: "Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR 01.01.2015."— Presentation transcript:

1 Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR

2 Comprehensive Explanation (1/4)
This OBJ covers the implementation of Ground-Ground (G/G) data exchange and automated co-ordination procedures to reduce the controller workload and human errors as specified by Regulation 1032/2006 EC and 30/2009 EC (amending 1032/2009 EC – the ‘COTR’ Reg.). Scope: EU+ States) (= EU+CH+NO+ECAA) Applicability: to all ACC units providing services to GAT (not covered: ACC  TWR + ACC  APP) Military SLoAs are applicable to all Military units regardless of their role (MIL being an ATS provider to GAT traffic or not) and coordination between CIV and MIL control units ESSIP Plan 2015 / Objective ITY-COTR

3 Comprehensive Explanation (2/4)
EC 1032/2006 mandatory processes to implement OLDI equivalent ITY-COTR SLoA – ASP and MIL timeframe Applicability Notification Process ABI ASP02 EU+ Initial co-ordination ACT ASP03 Revision of Coordination REV ASP04 Abrogation of Coordination MAC ASP05 Basic Flight Data BFD ASP06 MIL01 Change to Flight Data CFD ASP07 MIL02 Safety Assessment - ASP 10 EC 30/2009 mandatory processes Logon Forward LOF ASP08 Next Authority Notified NAN ASP09 Non-mandatory requirements (complementing EC Regulation) Training of ATC Personnel ASP11 ESSIP Plan 2015 / Objective ITY-COTR

4 Comprehensive Explanation (3/4)
ASP01 – concerns FDPS infrastructure, OLDI message processing , presentation and recording etc - States that have implemented OLDI will be compliant with this SLoA. ASP02/03/04/05 - concerns FDPS capability to receive, process, present and sent the messages as specified. ASP06/07 - to Flight Data Exchange with military ATS units. ASP08/ASP09 - data link related messages with different deployment date (specified in regulation (EC) 30/2009) ESSIP Plan 2015 / Objective ITY-COTR

5 Comprehensive Explanation (4/4)
ASP11 - ATCO training on automated flight data exchange; in most of the cases this action has been completed, the basic OLDI data exchange has been widely implemented at Pan European level. Note: this SLoA is not derived from the (EC) Regulations 1032/2006 or 30/2009. MIL01/MIL02 - are related to capabilities of military ATS units to received, process or present BFD/CFD or receive or present CPRs + safety assessment of all changes: ASP10 - safety assessment of any modification of automated flight data exchange. ESSIP Plan 2015 / Objective ITY-COTR

6 What is new or has changed for ESSIP Plan ed. 2015
Change of completion ‘by’ dates for ASP08 (Logon Forward), ASP09 (Next Authority Notified) and ASP11 (training for ATC personnel), due to new regulation (EU) 310/2015 amending Regulation 29/2009 on Data Link (ASP08 and ASP09 are processes to provide the ATN or FANS/1A logon parameters to the receiving data-link equipped unit, to allow the unit to use the data link applications (CM, CPDLC, ADS, FIS). ESSIP Plan 2015 / Objective ITY-COTR

7 Link to European ATM Master Plan
Eur. ATM Master Plan: [CM-0201] - Automated Assistance to Controller for Seamless Coordination, Transfer and Dialogue ESSIP Plan 2015 / Objective ITY-COTR

8 ITY-COTR – Most important SLoAs
All Finalisation Criteria and Closed Questions Ensure it is implemented with new FDPS or upgrade of current FDPS Establish OLDI link with adjacent ACC, as an additional info to the finalisation criteria expressed in the SLoAs Implement ACT/REV/ABI or MAC with adjacent unit, again as an additional info to the finalisation criteria expressed in the SLoAs Does your FDPS support ACT/REV/ABI/MAC data reception/processing and sending? Does exchange of messages with upstream/ downstream units ? Does exchange BFD/CFD or CPS with military ATS units exist ? FDPS upgrade planned to accommodate data link messages ? ESSIP Plan 2015 / Objective ITY-COTR

9 ESSIP Plan 2015 / Objective ITY-COTR
Supporting Material EUROCONTROL - SPEC EUROCONTROL Specification for On-Line Data Interchange (OLDI) - Edition OJ2011/C 146/05 / EUROCONTROL - SPEC 106C1 - EUROCONTROL - Corrigendum to Specification for On-Line Data Interchange (OLDI) Edition OJ 2011/C 146/05 / EUROCONTROL Specification 0107, Ed. 3.1 (2011), ‘Eurocontrol specification for ATS Data Exchange Presentation (ADEXP)’ NOTE: EUROCONTROL Specification 0107, Ed. 3.1 was published by EUROCONTOL in October It supersedes Ed 3.0 as EC Community specification. ESSIP Plan 2015 / Objective ITY-COTR

10 ESSIP Plan 2015 / Objective ITY-COTR
ESSIP Report 2014 ESSIP Plan 2015 / Objective ITY-COTR

11 ESSIP Plan 2015 / Objective ITY-COTR
Links and contacts Objective Coordinator: Dell’Orto Luca, EUROCONTROL Objective Expert: Stephen Morton, ESSIP Plan 2015 / Objective ITY-COTR


Download ppt "Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR 01.01.2015."

Similar presentations


Ads by Google