LIU–PLI report LIU PSB meeting
2
ECR and SRR to submit for approval this year
You received an on 4th March 2016 Simplified Process of validation of the SRR/ECR Validation during Integration meeting (ICL) IN WORK UNDER APPROVAL APPROVAL CLOSED RELEASED ENGINEERING CHECK 2 weeks Presentation to the LIU-PLI for Project Approval ECR LIU and SRR LIU Presentation to the IEFC for Final Approval Installation 19 April 2016 LIU PSB meeting - J. Coupard
3
ECR to submit this year for approval
Goal Upgrade Action Equipment or System impacted Location Group Contact ECR needed (Yes or No) Presentation of the SRR/ECR to the LIU-PLI meeting Status of the SRR/ECR EYETS PSB 2 GeV Upgrade New Main Power Supply (MPS) = POPS-B b.245 TE-EPC Fulvio Boatini yes April 2016 yes Linac 4 Connection to PSB New PSB Injection Region New Injection Region RING (1L1) TE-ABT Wim Weterings PSB-L-EC-0001 14-Jan-15 UNDER APPROVAL be ready Removal of the KSW1L1 BTV 50 assembly New KSW16L1 New KSW16L4 Move KWS16L4 to 2L1 RING (16L1, 16L4, 2L1) Luis Miguel Coralejo Feliciano PSB-MKKSW-EC-0001 4-Feb-15 PSB Injection Systems Upgraded PSB Distributor BI.DIS New BI.DIS10 BI line PSB-MSMIA-EC-0001 10-Jun-15 RELEASED Deliver magnets for BI line (vertical bending magnets and correctors and quadrupoles) TE-MSC Antony Newborough PSB-LJ-EC-0001 New BI.SMV BI.SMV Michael Hourican PSB-MSMIB-EC-0001 Relocation of BI.BTV30 for installation of the new BI.SMV BI.BTV30 BE-BI Stephane Burger PSB-LJ-EC-0006 APPROVAL CLOSED Beam instrumentation Installation of a Wideband Pickup in the BTP Transfer Line New wideband BPM BTP line Jeroen Belleman PSB-BPUWB-EC-0001 NOT IMPLEMENTED Provide additional wire scanners (new design) Prototype of Wire Scanner RING (4L1) Bernd Dehning New Tune pick-ups New BPM RING (3L1) Jocelyn Tan Install new Beam Loss Monitors at ring (2 FIC per period) BLMs RING (L3 at all periods) Christos Zamantzas Install new Beam Loss Monitors at injection (BI line) Injection (BI line) Install new Beam Loss Monitors at extraction and transfer Extraction (BT,BTY,BTM) Electrical Systems Upgrade of LV general services distribution systems: PSB BCER Switchboard and Containment Installation b.361 EN-EL James Devine General Infrastructure Modification of the layout of racks in the BRF2 power converters racks metalic infrastructure cabling BRF2 EN-MEF David Hay PSB-K-EC-0001 The list of the TE-EPC equipment on surface/underground that must appear in the ECR will be established soon. 19 April 2016 LIU PSB meeting - J. Coupard
4
SRR to submit this year for approval
Goal Upgrade Action Equipment or System impacted Location Group Contact SRR needed (Yes or No) Presentation of the SRR/ECR to the LIU-PLI meeting Status of the SRR/ECR LS PSB 2 GeV Upgrade PSB Extraction and Transfer Deliver magnets for BT, BTP, BTM transfer lines BT, BTP, BTM lines TE-MSC Antony Newborough yes Beam Intercepting Devices New absorber/scraper RING (period 8) EN-STI Francois-Xavier Nuiry RF Systems 2/4/16 MHz cavity consolidation studies and Finemet cavity beam studies BR.C02/C04/C16 RING (C02 = 7L1) (C04 = 13L1) (C16 = 5L1) BE-RF Mauro Paoluzzi Matthias Haase April 2016 19 April 2016 LIU PSB meeting - J. Coupard
5
Roadmap towards EYETS Presentation LSC (LS2 committee) 1st April Integration studies & ECR preparation ECR approval process ECR approved The ECRs must be released BEFORE the technical stop starts. 19 April 2016 LIU PSB meeting - J. Coupard