1 Sub-National Shelter & NFI Cluster Coordination meeting for C&S
1. Review of minutes of previous meeting 2. WD-SAT: Feedback on training in Baghdad 3. Issues               a.) Pre Positioning for Anbar ( Updates )               b.)  Available plots in Anbar Camps (latest version)               c.) Summer activities –Gap Analysis (latest version)               d.) Tent Replacement (Kilo 18, AAF camps etc.) – Overcrowded tents and IDPs living in Kitchens 4. Governorate Updates 5. AoB Wednesday, 12th July 2017

2 Current Cluster Team Structure
Laurent de Valensart - UNHCR National Cluster Coordinator +964 (0) Cornelius Weira - IOM Sub National Co-Chair - Centre and South Mobile +964 (0) Laurence West - UNHCR Sub National Coordinator – KRI Mobile Tonja Klansek - ACTED Roving Coordinator Michel Tia - IOM Information Management Officer - National +964 (0) Abdoulaye Dieye -NORCAP Information Management Officer - Assistant National Mobile +964 (0) Ali Rasul – UNHCR Senior Cluster Associate +964 (0)

3 Review of action points from previous meeting
Partners requiring additional input on indicators for the activity info to coordinate with IMO Shelter cluster – awaiting feedback from Partners IMO to share completed WD - Shelter Assessment Questionnaire and also the ODK link – Done IMO to develop online register for upcoming training on WD – Shelter Assessment Tool due on 11th July 2017 – Done Partners to adhere to the reporting timeless for reporting data input into activity info – Ongoing Cluster to revise Gap Analysis matrix to indicate camps in Center and south only – Done UNHCR to share June 2017 activities for Center and South – Done Cluster to develop Dashboard on tent replacement activities (Needs and Response) – in progress CCCM to share raw data for the REACH household assessment for Center and south – Pending Partners (Governorate focal point) to share their Governorate update / Shelter and NFI key issues before the meeting to be included into the presentation – Awaiting Partner response

4 WD-SAT / FSMT : Feedback on training in Baghdad held on 11th July 2017
Joint Shelter and CCCM Training Session on WD-SAT / FSMT from 10:00am to 01:30pm. 30 Participants 9 Partners: DRC, MHE, IOM, CRS, CARITAS, IRD, Muslim Aid, UNHCR Feedback from Partners: !!

5 3 a. Cluster Key Issues / Pre Positioning for Anbar
a.) Pre Positioning for Anbar Tents = 3,329 NFIs = 3,000 UNHCR has pre positioned :- 2500 CRI kits prepositioned in MA WHs as 1500 kits in AMF Anbar governorate, and 1000 Kits in HTC WH 2500 tents prepositioned in MA WHs in AMF QRCS has prepositioned 429 tents MODM has prepositioned 400 tents IOM has prepositioned 500 NFI kits Available Plots in existing Anbar camps (7,740 )

6 3 b. Cluster Key Issues / Summer activities –Anbar Camps Gap Analysis (Latest Ver)
Agency Site Name # of Families Electricity Availability of elec. Method Average Water (l/p/d) Availability of Water Method Clothing Jerry can Cool box Fan Generator O&M* AWC Minimum Summer response Saba Salabol NNGO Bzebiez central camp (Al-Markazi) 670 Yes Connected to grid 10 Water trucking Gap Generators & on mains grid Gap – high No Local Authority AL Ahssan 280 20 Gap-high Amriyat Al-Fallujah Camp 5 140 Available as per needed N/a- on mains grid Amriyat Al-Fallujah Camp 9 180 AK-8 100 Generator Gap -MODM/Fuel AK-1 133 connected to grid and Generator Gap-MODM/Fuel AK-2 104 generator AK-3 64 AK-6 94 AK-7 108 AK-11 63 G Gap- MODM /Fuel Kilo 18 camp 853 in the process of connecting to national grid connection still in progress

7 3 b. Cluster Key Issues / Summer activities –Anbar Camps Gap Analysis ( Latest Version)
DRC Al Alam 1 501 No Generator Available as per needed Connected to grid Gap Gap- MODM /Fuel Gap – high Al Alam 2 791 Gap -MODM/Fuel MODM Al Alam 3 N/a Gap High IRD Olympic Stadium 1000 Yes Generator and grid Gop-MODM /Fuel Local Authority Al Shahama and Karama Camp 1,292 connected to grid No Water Supply Water trucking Al Wahda Camp - Baghdad 42 20 N/a- on mains grid Laylan -2 823 Laylan -3 789 Daquq 1,767 Total # of priority families 9,794

8 3 c. Cluster Key Issues / Tent Replacement (Kilo 18, AAF camps etc.)
No. Partners Distributions Locations No Tents Replaced Total Need-Anbar Governorate Anbar -Outstanding Tent Replacement Need 1 MODM AAF, HTC, Khalidiya; Beiz Biz,Kilo 18 5000 23,000 18,000 2 UNHCR Beiz Biz 500 17,500 3 NRC AAF, HTC, Khalidiya; Beiz Biz 318 17,182 4 CRS AAF (60 T-shelter Al-Tahadi Camp; 100 T-shelter in Al-Bashaer Camp; 70 T-Shelter in Zawbaa Camp); AAF-16,AAF-22,AAF -24 460 16,722 5 Beiz Biz; AAF 394 16,328 6 AAF 111 16,217 7 HTC 140 16,077 8 Al Kahlidiya 3 89 15,988 9 Kilo 18 151 15,837 10 24 15,813 11 HTC &AK 152 15,661 Total 7,339

9 3 d. Cluster Key Issues /Over crowded tents and IDPs living in Kitchens in Anbar
IDP camps in Anbar-overcrowded shelters 13 June 2017 updated by: Layth Al-Azzawi, UNHCR # Governorate District Camp Area Site_name (new) Alternative Name Type Status total Fam overcrowded shelters shelter type 1 Anbar Al-Khaledyia HTC 8 govermental buildings Collective Centre Open 67 -2 building 2 Abu Anas (HTC) camp 140 -65 tents 3 HTC fallujah 3 closed 101 -1 4 HTC fallujah 7 266 -16 5 Ramadi Wafaa Wafaa camp Kilo 60 camp 125 -50 6 Amriyat Al-Fallujah AAF Amriyat Al-Fallujah Camp 6 OM- AL Qura Camp 130 -30 7 Amriyat Al-Fallujah Camp11 structure caravans camp 645 -197 caravans 8 Amriyat Al-Fallujah Camp 19(RHU) Al-Matin(RHU) 165 -9 RHU 9 Amriyat Al-Fallujah Camp 32 Al-Shuhada 100 -28 10 Bzebiez BzBz Bzebiez central camp (Al-Markazi) 730 2469 -448

10 4. Governorate Updates Baghdad Basrah Kirkuk

11 Next meeting will be Wednesday 26th July, 12:30 pm at RCC4
AOB Next meeting will be Wednesday 26th July, 12:30 pm at RCC4

12 THANKS.