Presentation is loading. Please wait.

Presentation is loading. Please wait.

News from EVM.

Similar presentations


Presentation on theme: "News from EVM."— Presentation transcript:

1 News from EVM

2 Workunits Data Lifetime
Timeline Steps 1 2 3 4 5 6 WU Estimation DR Contracts/DAI Project Eng. Reporting Accruals (Composite) Accruals (2015 prices) Advancement = 0 Advancement ≠ 0 Resources Rest Rcontract/DAI Rcontract/DAI in 2015 prices Deliverable content DCest DCDR DCContract/DAI Deliverable dates DDest DDDR DDContract/DAI DDReporting PV PVtrend PVtrend EV ACComposite AC2015 prices

3 EVM Metrics for Council
Schedule Variance SV = PV – EV vs Baseline CSR 2016 and SV = PVtrend – EV vs Baseline 2017 = SV for Groups Cost Variance CV = ACcomposite – EV vs total CET cost (=actual) = CV for Groups CV = AC2015 prices – EV vs CET costs updated with CVI Freddy will distribute to the Council a document with the main EVM metrics for the 2 projects (x4 times a year)

4 EVM Metrics kCHF Time EAC BAC CV SV Today Completion Date PV PV trend
AC composite = ∑ AC cet AC 2015 prices

5 LIU – Evolution of PV between CSR & Council
EVM Planned Value curve after Feb-17 updates will be sent for validation before implementation

6 LIU – Pending EVM Updates
Main objectives Solve inconsistencies in the actual workunit structure BE-BI budget codes for past expenses (step 4) -> no impact on the cost and schedule variances Introduce more detailed deliverables, including detailed spending profile allowing interpretation of the cost & schedule variances BE-RF workunits all machines (step 3) EN-CV new contract for LIU-PSB (step 3) EN-STI workunits (step 1) TE-VSC workunits (step 1) EN-EL workunits for LIU-PSB & LIU-SPS (step 1) No change of CtC Not to absorb Cost & Schedule Variances

7 Status of Baseline 2017 Open points:
Action Deadline General meetings with BI, RF, STI and VSC 03-Feb-17 Accounting bookclosing 10-Feb-17 Discussions LIU machine coordinators – WUs holders + collection of EVM modifications 15-Feb-17 Upload of baseline 2017 in EVM 20-Feb-17 Open points: Identified savings & cost overruns CVI 2016 (price escalation reserve as from 2017) M to P transfers since CSR

8 Support for Cost Variance Analysis