Download presentation
Presentation is loading. Please wait.
Published byCandice Welch Modified over 6 years ago
1
Revisions in raw, working-day and seasonally adjusted data
An application to the Italian industrial production index Anna Ciammola ISTAT
2
Layout Statement of the problem
Approaches to analyse revisions in seasonally adjusted (SA) data The “empirical” approach An application Steswp meeting - Paris June 2007
3
Statement of the problem
Revisions of seasonally adjusted data can be traced back to different sources: Revisions in raw data Sources data, benchmarking, rebasement, classification, methodology, … Revisions in working-day factors Easter, working/trading day, leap-year, holidays 3. Revisions in seasonal factors Concurrent adjustment, forecasted seasonal factors Steswp meeting - Paris June 2007
4
Statement of the problem
A simple representation of the problem using the following notation Ijsa,i I refers to a specific economic indicator j refers to the state of raw data j=p preliminary data j=f final data i refers to the state of seasonally adjusted data i=p preliminary seasonal factors i=f final seasonal factors Steswp meeting - Paris June 2007
5
Statement of the problem
Seasonal revisions Revisions in raw data Rsa R RT total revision Revisions in raw data Seasonal revisions R R’sa Source: Maravall and Pierce, 1983 Steswp meeting - Paris June 2007
6
Statement of the problem
The revision processes R and Rsa may be very different The analysis of revisions only on SA data is not sufficient to describe the statistical properties of revisions Steswp meeting - Paris June 2007
7
Approaches “Analytical” approach Decomposition of the total revision
RT = f (R , Rsa) Interesting, but not always applicable Example: Row, WDA and SA Italian QNA derive from three different process of temporal disaggregation Steswp meeting - Paris June 2007
8
Approaches “Empirical” approach Analysis of three sets of revisions:
- on raw data - on WDA data - on SA data Less appealing, but: - always applicable - simple for dissemination purposes Steswp meeting - Paris June 2007
9
The “empirical” approach
Raw data WDA data SA data Revisions as: Error Relative error Revisions on: Levels Y-o-Y changes P-o-P changes Indices of: location variability systematic component Steswp meeting - Paris June 2007
10
The “empirical” approach
Revisions in raw and WDA data - Stability of WDA factors always checked in the decomposition processes - RWDA = g (R , B) (B changes in the parameter estimates of regressors in reg-ARIMA models) - Changes in B should be small Revisions process in WDA data Revisions process in raw data Steswp meeting - Paris June 2007
11
The “empirical” approach
Revisions in raw and SA data - Stability of SA factors always checked in the decomposition processes - Analysis of revisions on raw data is a helpful tool to understand the size and other properties of revisions on SA data Example: Bias in revisions of SA data bias in revisions of raw data? bias due to the SA process? Steswp meeting - Paris June 2007
12
An application The revision of the Italian industrial production index (Intermediate goods) Sources of revision additional data arrived from late respondents (increase in coverage); correction of errors in data already embodied in the estimates revision of statistics (external to the survey) utilised in compiling the index (e.g. productivity coefficients drawn from national accounts) Timing of revision (from October 2004) First revision: 1 month after the preliminary release Second revision at fixed points - April (releasing February data and concerning the previous three years) - October (releasing August data and concerning the first semester of current year) Steswp meeting - Paris June 2007
13
An application Steswp meeting - Paris June 2007
14
An application Steswp meeting - Paris June 2007
15
An application Steswp meeting - Paris June 2007
16
Thank you!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.