Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bridge across San Andreas Fault at Parkfield

Similar presentations


Presentation on theme: "Bridge across San Andreas Fault at Parkfield"— Presentation transcript:

1 Bridge across San Andreas Fault at Parkfield

2 San Andreas Fault right lateral offset at Parkfield Bridge

3 San Andreas Fault Movement, DeRose Winery, Hollister, CA Note the new building at the top left.

4 28 years of offset at the Cienga Winery,
USGS Photo TMcG

5 New construction & fault trace, June 2003, DeRose Cienga Winery
New construction & fault trace, June 2003, DeRose Cienga Winery. The offset ditch runs barely out of sight on the right.

6 San Andreas fault creep damage
De Rose Cienga Winery, south of Hollister CA

7 Town of Hollister, California viewed from the Calaveras fault scarp
Town of Hollister, California viewed from the Calaveras fault scarp. The San Andreas fault runs sub-parallel l,.5 miles west.

8 Wall on 6th Street distorted by Calaveras Fault creep (June 2003)

9 Rotational Translation on 6th Street

10 Offset curb, 6th Street Hollister

11 Offset curb on,7th Street

12 Roof damage, Hollister High School

13 Discrepant Event, Hollister ; )


Download ppt "Bridge across San Andreas Fault at Parkfield"

Similar presentations


Ads by Google