Overview of Mechanical Design
Nate Laverdure LCLS-II 2 K Cold Box FDR March 9, 2017
2
Design overview and interfaces
Outline Design overview and interfaces Configurations and bayonet installation/removal Design details Thermal reliefs Cold compressor installation Bellows/straightener assembly Heater assembly Central support column Mechanical drawing package LCLS-II 2 K CBX FDR, Mar 9, 2017
3
Mechanical design overview
LCLS-II 2 K CBX FDR, Mar 9, 2017
4
Mechanical design overview
LCLS-II 2 K CBX FDR, Mar 9, 2017
5
Cold box configurations
High flow configuration (CC-1 through CC-5) From linac To 4KCB From LHe dewar LCLS-II 2 K CBX FDR, Mar 9, 2017
6
Cold box configurations
Low flow configuration (CC-2 through CC-6) From linac To 4KCB From LHe dewar LCLS-II 2 K CBX FDR, Mar 9, 2017
7
Cold box configurations – u-tubes
Size High flow CC-1 through CC-5 IBX-CC1I-2KPR-1 9-1/4” CC1O-CC2I-2KPR-1 CC5O-2KCB-CCR-1 5-3/16” 2KCB-4KCB-CCR-1 LHD-2KCB-4KVAP-1 3-1/8” Low flow CC-2 through CC-6 IBX-CC2I-2KPR-1 CC5O-CC6I-2KPR-1 Used in both configurations LCLS-II 2 K CBX FDR, Mar 9, 2017
8
Top plate and work platform
Access requirements Around bayonets for system configuration changes Around control valves, relief valves, and feedthroughs for maintenance Sufficient aisle width for egress from work areas LCLS-II 2 K CBX FDR, Mar 9, 2017
9
Cold box configuration control
Bayonet installation/removal procedure LCLS-II 2 K CBX FDR, Mar 9, 2017
10
Bayonet installation/removal procedure
LCLS-II 2 K CBX FDR, Mar 9, 2017
11
Thermal relief assembly
All 2K Cold Box cryogenic reliefs are: Thermal reliefs ASME reliefs Protected against air contamination via guard vacuum enclosure Exhausted to header which is protected against moisture entry and vented outdoors LCLS-II 2 K CBX FDR, Mar 9, 2017
12
Thermal relief assembly
LCLS-II 2 K CBX FDR, Mar 9, 2017
13
Thermal relief assembly
Relief inspection/replacement process: Warm up 2K Cold Box and bring to 1 atm Backfill relief exhaust header with 3 atm He purge Break fittings around relief shroud and remove Disconnect relief flange and install blank while under purge Inspect/test relief on bench or replace Disconnect blank and install relief while under purge Re-install relief shroud Pump relief exhaust header to guard vacuum and backfill with 3 atm He purge LCLS-II 2 K CBX FDR, Mar 9, 2017
14
Mechanical details – cold compressor installation
LCLS-II 2 K CBX FDR, Mar 9, 2017
15
Mechanical details – bellows/straightener assembly
Used in CC-1 and CC-2 inlet piping spools LCLS-II 2 K CBX FDR, Mar 9, 2017
16
Mechanical details – bellows/straightener assembly
Cleanup of stagnant annular volume Recommendation: Large virtual leak exists between flex ID and process piping. Need to address this. Response: 12x 1/8” holes to facilitate pump and backfill of annular space LCLS-II 2 K CBX FDR, Mar 9, 2017
17
Mechanical details – heater assembly
Based on SNS and earlier heater designs LCLS-II 2 K CBX FDR, Mar 9, 2017
18
Mechanical details – control valves
LCLS-II 2 K CBX FDR, Mar 9, 2017
19
Mechanical details – internal piping support
Configurable support Pinned in 2 places for shipping Pinned in 1 place for normal operation LCLS-II 2 K CBX FDR, Mar 9, 2017
20
Mechanical details – internal piping support
LCLS-II 2 K CBX FDR, Mar 9, 2017
21
Mechanical details – manway
Based on 30” design used at JLab 4K Cold Box LCLS-II 2 K CBX FDR, Mar 9, 2017
22
Mechanical details – central support column
Maintains flatness of top plate during assembly Threaded rods and nuts for leveling during installation Shims inserted between flanges to carry large compression load And during operation Encased in passive copper conductor Insulated with MLI Thermal deflection limited to a few thousandths LCLS-II 2 K CBX FDR, Mar 9, 2017
23
Mechanical details – vacuum pumping system
LCLS-II 2 K CBX FDR, Mar 9, 2017
24
Mechanical drawing package structure
Final integration top level assembly Assembled on SLAC site Includes all installation, outfitting of all external piping and external instrumentation Responsibility of final construction subcontractor Initial construction top level assembly Shipped to SLAC Includes vacuum shell, internal piping, internal instrumentation Responsibility of initial construction subcontractor LCLS-II 2 K CBX FDR, Mar 9, 2017
25
Mechanical drawing package
LCLS-II 2 K CBX FDR, Mar 9, 2017
26
Mechanical drawing package
LCLS-II 2 K CBX FDR, Mar 9, 2017
27
Mechanical drawing package
LCLS-II 2 K CBX FDR, Mar 9, 2017
28
Mechanical drawing package
LCLS-II 2 K CBX FDR, Mar 9, 2017
29
Documentation Document No. Title Author Status 79222-D6001
2K Cold Box Drawing List D. Rath Under review LCLS-II 2 K CBX FDR, Mar 9, 2017
30
2K Cold Box design documentation
Summary 2K Cold Box design documentation P&ID released Mechanical drawings for initial construction of the 2K Cold Box primarily in checking or released Drawings to be complete by 10 Apr 2017 Access requirements are well defined Maturity of design is commensurate with FDR LCLS-II 2 K CBX FDR, Mar 9, 2017
31
Overview of Mechanical Design
Nate Laverdure LCLS-II 2 K Cold Box FDR March 9, 2017
32
9-1/4” bayonet interference
Background Used for subatm He connections at CC suction SNS experience with this component: seized during installation Outer male bayonet tube observed out-of-round Interference between OD of outer male bayonet tube and ID of lantern ring or valve flange body Not observed at JLab LCLS-II 2 K CBX FDR, Mar 9, 2017
33
9-1/4” bayonet interference
Mitigation Purchase tube meeting ASTM A269 From this tubing, select and use only sections meeting additional imposed tolerance Verify clearance using purpose designed gauge or lantern ring Inspect ID of all lantern rings and valve flange bodies LCLS-II 2 K CBX FDR, Mar 9, 2017