GCSE Construction & the Built Environment
Thursday 5th March 2009 Stormont Hotel Belfast Friday 6th March 2009 Silverbirch Hotel Omagh
2
Agenda 13.00 Introduction Mr P McShane Subject Officer CCEA
13.20 Controlled Assessment Tasks Mr G Haughey (Principal Moderator) 13.40 Round table discussion – Q&A 14.10 Externally Assessed Unit Mr T Heaney (Chief Examiner) 14.30 Round table discussion – Q&A 14.45 Wrap up
3
Our support programme Subject specific launch events –
October – December 2008 Subject specific support events – January – April 2009 Personalised support and visits on request
4
Our support – in print and online
Specification – in centres from September 2008 Specimen assessment materials – in centres by end of December 2008 Student Guides – February 2009 Schemes of Work – on a rolling basis from March 2009
5
Our e-Support Package Subject micro-sites (introducing interactive student support) Controlled assessment guidance material Chief Examiner’s reports with top tips for improving performance
6
Our Support contd Agreement trials Exemplification of standards –
(September – November 2011)
7
Our commitment to you In person
A local team committed to supporting you Accessible subject officers and specification support officers Tailored guidance from a subject specialist Centre visits on request
8
Staying informed – www.ccea.org.uk
9
Controlled Assessment
A series of specific questions have been lodged with the technical committee at Ofqual We hope to have more specific guidance loaded onto the website before first teaching in September 09
10
Handle with Care Controlled Assessment
The following Controlled Assessment Tasks for Unit 2 are in DRAFT form
11
Controlled Assessment
The Principal Moderator (Gareth Haughey) has developed three tasks – 2 Wood & 1 Brick Tasks for plumbing and plastering are to follow
12
DRAFT CONTROLLED ASSESSMENTS
GCSE CONSTRUCTION DRAFT CONTROLLED ASSESSMENTS UNIT 2 Wood structure
13
DRAFT CCEA GCSE CONTRUCTION Assignment 1. Coffee Table Unit 1.
Detailed View
14
DRAFT
15
DRAFT
16
DRAFT CONTROLLED ASSESSMENTS
GCSE CONSTRUCTION DRAFT CONTROLLED ASSESSMENTS UNIT 2 Roof Structure
17
DRAFT
18
DRAFT
19
DRAFT
20
GCSE CONSTRUCTION DRAFT ASSIGNMENTS UNIT 2 Block structure
21
DRAFT Wall/Block construction CCEA GCSE CONTRUCTION
The cavity must be between 50mm and 75mm wide. Ties should be placed at 900mm centre’s horizontally and 450 vertically. Damp proof course should be appropriately placed. CCEA GCSE CONTRUCTION Controlled Assessment Task - Brickwork
22
DRAFT
23
Controlled Assessment
The Controlled Assessment task for Unit 3 Computer Aided Design for Construction is incomplete however this will be available for September 09. Please see Specimen Assessment Materials for comparable tasks
24
Controlled Assessment
Question & Answers with Principal Moderator
25
Unit 1: Construction Industry for the 21st Century
External Assessment Unit 1: Construction Industry for the 21st Century
26
Unit 1: Powerpoints The CCEA/CITB powerpoints are still available
We are negotiating with the author to update the resource The majority of this work should be complete by September 09
27
Handle with Care Scheme of Work
The scheme of work is an aid, a guide, a suggestion only.
28
Unit 1:
29
Question & Answers with Chief Examiner
External Assessment Question & Answers with Chief Examiner
30
Support Materials Specification & Specimen Assessment Materials
Scheme of Work Student Guides Snapshots Construction Microsite CD with PPoints
31
Contact details Subject Officer: Paddy McShane
Telephone: Ext 2133 Specification Support Officer: Catriona Skelton Telephone: Ext 2292 Distribution: Michelle Hannaway Telephone: Ext 2161
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.