1 ORR Team Leader May 2005 Revision
Detailed Responsibilities 13L

2 Upon successful completion of this topic, the student should be able to:
Describe the ORR Team Leader’s detailed activities and considerations associated with planning and conducting an ORR/RA including: Startup Authorization Authority Plan of Action Event Dates Implementation Plan Team Selection Criteria Team Level of Experience Team Qualification Requirements Logistics/Planning Management of the Team Interfaces: - Oversight Entities - Startup Authority - Facility Contractor Necessary Briefings/Meetings ORR Final Report 13L REV May 2005 Revision

3 Authorization Authority
Your Boss: Report is for His/Her decision; Line Decision Maker for Scope Changes. Close Interface: Regular Briefings during Review; Immediate Notification of Major Issues. Should Formally Direct you to Commence the ORR/RA. For CORR/CRA, a Senior Line Manager will fill this role. 13L REV May 2005 Revision

4 Plan of Action Should name you as Team Leader.
Specifies “Geographic” Scope: What the Authorization Authority directs you to review. Basis for writing your Implementation Plan. Specifies prerequisites, proposed start dates: Planning only. Approved by DOE/NNSA Authorization Authority for both CORR/CRA and DOE/NSA ORR/RA. 13L REV May 2005 Revision

5 Event Dates Be Flexible! Be Alert to Recommend Pre-Event Activities:
Emergency Preparedness (EP) Drills; Integrated Equipment Tests. Critical Team Interface Issue . . . You Must be Proactive . . . 13L REV May 2005 Revision

6 Implementation Plan Your responsibility . . .
You prepare, approve, forward . . . You resolve/consider comments with oversight organizations (internal, external) . . . Team Building/Training Opportunity . . . What you commit to do to answer the question - are the criteria within the POA scope met? 13L REV May 2005 Revision

7 Team Selection Criteria
Your Call! Requirements: Technical competence; Assessment experience/training; Independence in the Review area. Good Ideas: Writing skills; Team player; “Big Picture” . . . Always good to have a Senior Advisor! 13L REV May 2005 Revision

8 Team Level of Experience
Must cover the technical issues within the scope: Documented and Defendable Expertise. Pay particular attention to contentious issues . . . Match the IP . . . A few ringers . . . A few “gold nuggets” . . . 13L REV May 2005 Revision

9 Team Qualification Requirements
Specified in Order: “...team leaders must determine and document qualifications…” Sample Forms Available: Standard ( ) and DOE/NNSA Web Pages. Knowledge of Facility Specific Information: Tours, Required Reading, etc. 13L REV May 2005 Revision

10 Logistics/Planning Pay attention to this!
Discuss early with Site/Facility . . . Good Administrative Assistant is critical . . . Additional Admin support for report may be essential . . . Work Space and equipment must be a priority . . . Hints in the Team Leaders Handbook: DOE-HDBK ( Start early . . . 13L REV May 2005 Revision

11 Managing the Interfaces NO SECRETS!
Oversight Entities: Full Access - Best Practice; Candor! Authorization Authority (Senior Contractor Management for CORR/CRA) Must be Fully Informed; Brief periodically; Initiate the Communication; Local DOE/NNSA Participation. Facility Contractor: Fully Informed, Share Draft Information. 13L REV May 2005 Revision

12 Briefings and Meetings
Daily Team Meeting: Shares information, contractor, DOE/NNSA . . . Team Synergy. Closeout Briefing: Key Issues - Pre-Start Findings; Startup Recommendation; Finding Closure Recommendation. Follow-up: As Required (LPSO, DNFSB, etc) 13L REV May 2005 Revision

13 ORR Final Report Your Product! Suggested Format in Standard/website:
Select and provide an example to Team. Unclassified preferred; as required . . . Key Elements (Order Requirements): Order Compliance as per POA; Lessons Learned; ISMS Statement; Your Recommendation; Addressed to Authorization/Startup Authority. 13L REV May 2005 Revision

14 ORR Final Report some keys to success
Plan to complete before team leaves site . . . Define Timeline and expectations to team early . . . Provide example formats early-forms & Summary . . . Develop the report skeleton and background early . . . Arrange for Admin support to edit, format, collate . . . Push daily input to individual forms . . . Emphasize timely factual accuracy . . . Describe the review/approval process to the team . . . Continuous classification review of product . . . 13L REV May 2005 Revision

15 If the Results of Review are not Successful
Significant team decision. Facts must support: Sleep on it; Confront team to defend conclusion. Discuss situation and options with Authorization Authority (Senior Contractor Management). Two Options: Suspend the Review. Interim Report including what was done and areas not done. Final report for completed Functional Areas (FA); High level discussion and findings for incomplete FAs. Terminate the Review. Report results with basis for repeat of entire ORR/RA. 13L REV May 2005 Revision

16 Team Leader (TL) Problem Areas
Team Leader not qualified: Selection criteria guidance not detailed enough (e.g., independence, experience) . . . TL not assigned soon enough (POA timely approval) . . . TL does not communicate expectations to team with enough lead time . . . TL does not communicate drill/evolution expectations to facility . . . Site access for team not gained ahead of time . . . Logistic needs not communicated to site with enough lead time . . . TL does not tailor CRADs based on Pre-Visit or Team not at Pre-Visit, or no Pre-Visit) . . . CRAD assigned to TL . . . 13L REV May 2005 Revision

17 Final Thoughts Readiness to start is performance-based . . .
Adequacy of infrastructure programs is more audit-like . . . Determination of adequacy versus perfection . . . Frequently a RA/CRA may not focus as much on infrastructure programs as an ORR/CORR . . . 13L REV May 2005 Revision