Austin Bridge & Road Paving the 1st Formula One Purpose Track in the United States The 1st Formula One Track in the World to be 3D Paved In this session,

Similar presentations


Presentation on theme: "Austin Bridge & Road Paving the 1st Formula One Purpose Track in the United States The 1st Formula One Track in the World to be 3D Paved In this session,"— Presentation transcript:

1 Austin Bridge & Road Paving the 1st Formula One Purpose Track in the United States The 1st Formula One Track in the World to be 3D Paved In this session, we will present how a contractor has managed to outperform the demanding specifications of the first purpose-built Formula 1 track in the USA using three 3D paving systems. The F1 track represented a highly complex design while prescribing tight elevation and smoothness specifications. This session is intended for the owners, projects managers, surveyors, site supervisors, foremen and operators of general and paving contractors Matthew Hollensworth – Cody Lowery – Mike Ellingson

2 Integrity Performance Safety Responsibility Employee-Ownership
Austin Integrity Performance Safety Responsibility Employee-Ownership About Austin Industries In this session, we will present how a contractor has managed to outperform the demanding specifications of the first purpose-built Formula 1 track in the USA using three 3D paving systems. The F1 track represented a highly complex design while prescribing tight elevation and smoothness specifications. This session is intended for the owners, projects managers, surveyors, site supervisors, foremen and operators of general and paving contractors 100 Years in the industry 25 years of employee-ownership

3 Heavy highway Aviation Heavy rail Light rail
Market Segments Heavy highway Aviation Heavy rail Light rail Site improvements Sub-divisions Tollways Race tracks Long list of customers

4 Formula 1 Racing About Formula 1

5 2004 World’s Highest Paid Athlete
F1 Car / Driver Michael Schumacher 2004 World’s Highest Paid Athlete Retires in 2012 May want to refer to the “car driving on the ceiling” > 220 MPH 1” – 2” Ground Clearance

6 2012 Race Circuit Formula 1 Racing Schedule Season will Feature 20 events in 19 countries across five continents.

7 COTA Project Data Basic Track Project Data
Survey scope all of the complex

8 Quantities 80,000 tons of flex base placed with 3D paver & 50,000 tons of asphalt base paved with 3D Paver. Remaining course of asphalt placed with averaging beams.

9 The Layers of the Track Note the 14 Different layers of the Track.

10 3D Asphalt Paving

11 Our Strategy to 3D Paving
Research available 3D paving products Decide the best fit for our company’s needs Develop procedures and processes for our new paving system (including evaluating, training, and adding the right personnel) Getting the buy in from Dr. Hart Testing, trusting, and trying our new equipment Exceling with our new product What was our strategy at Austin to over come the task at hand?

12 Current Platform Our Current Platform allows us to use our machine control the way we see fit. If we want it on a Dozer one day then a paver the next we have that ability using the Trimble GCS and PCS Platform.

13 Interchangeable Components
Robotic Total Station CB460 3D Control Box TSC3 Data Collector The Right Grade Control Equipment Being able to Interchange components was on of our reason for going with the Trimble Systems on this project. Also our current capital investment was another reason.

14 Trimble PCS 900 System UTS Right UTS LEFT Machine Radio
CB460 3D Display CB440 CB440 Sonic Tracer or Ski VM200 Valve Module AS200 Slope Sensor Sonic Tracer or Ski

15 Sub-Grade Topo Placeholder for list item
A topo of the site is performed and a cut sheet is generated

16 Processing Data & Un-Compacted Design

17 Multiple Setups / Accurate Control

18 Placing Base Material Applications Beyond Asphalt

19 Placing Base Material Very Successful Application

20 3D Paving on Asphalt 1st Course

21 Checking – Checking – Checking
1st Course / Also Topo Shots

22 Paving Curves Turn 1

23 Paving Under Bridges

24 Tangent – Curve – Widening

25 All Up Hill

26 3D Milling

27 Bad Design Data

28 Good Design Data

29 Intelligent Repairs Working w/ Design Changes
Through the course of the project we received many design changes and some after we have already paved an area. This slide shows us using 3D Milling to shave a area down to better transition the curve.

30 All in one day – All at the same time
One of the first jobs to have 3D milling, robotic base and asphalt paving, Robotic topo collecting with roller along with robotic and GPS grading an not to mention the tremendous amount of survey that was happening in the back ground.

31 How Did We Do? Outstanding safety performance Met financial objectives
Opportunity “Track is awesome”, Dr. Rainer Hart “One of the top two tracks in the world”, Tilke Eng. “Love it”, Mario Andretti “Highest Rating”, Fédération Internationale de l'Automobile (FIA) “Greatest racetrack on the planet”, The Tom Byrum

32 Learning Curves Control is Critical Modeling Methods
Training Techniques 3D Paving is NOT a grading tool (Sub-Grade is important) 3D Equipment is still limited to the capabilities of the paving machine (roller were added to tow arms to prevent binding) Having an Extra Data collector made all the difference

33 Other Race Tracks (HWY 183 Ft. Worth, TX
Other Race Tracks (HWY 183 Ft. Worth, TX Average Race Speed 90mph in a F150)

34 Access Limitations

35 Managing Quantities

36 Mario Andretti 1st Ceremonial Lap
Mario Andretti makes ceremonial 1st. Lap as the official ambassador of Circuit of the Americas.