Download presentation
Presentation is loading. Please wait.
Published byJeffry Norton Modified over 6 years ago
1
Missing data General 2009-2016: Dutch Inspection checked report twice
Rule: no documented proof is no recycling Experience: the better the data, the lower the recycling percentage Problem What proof is needed? Do you want to differentiate per material stream? New Waste Framework Directive what is recycling (OMR)?
2
Burden of proof Risk based
3
[A] Specification of composition by independent third party (not permitted if further separation takes place downstream) [B] Specification of composition by 1st and/or final processor [C] Invoice/credit note from 1st and/or final processor [D] Downstream statement from 1st and/or final processor [E] Contract with 1st and/or final processor [F] Acceptance criteria of 1st and/or final processor (only in the case of pure flow and supplemented with proof of delivery) [G] Certificate of product/‘end of waste’ status [H] Audit report
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.