RECLAMATION Power O&M Program Great Plains Region

Similar presentations


Presentation on theme: "RECLAMATION Power O&M Program Great Plains Region"— Presentation transcript:

1 RECLAMATION Power O&M Program Great Plains Region
Managing Water in the West Power O&M Program Great Plains Region Denver, CO August 30, 2017 Mid-West Electric Consumers Association Board of Directors Meeting Mike Ferguson, Power O&M Manager

2 RECLAMATION POWER RAX PROJECTS Managing Water in the West
MT ELBERT POWERPLANT REHABILITATION DECREASED SCOPE (No Unit Rehabs / Rewind, SS, Controls ADDRESSING ISSUES (Relays, Cooling Water, Crane, Seals, SFC) CONTINUING WITH DESIGNS / SPECS DECREASED COST ($68 to $20 Million / Balance to be Shifted to CF) SCHEDULE ACCELERATED (FY 2021)

3 RECLAMATION Managing Water in the West YELLOWTAIL REWIND / REHAB
UNIT 3 COMPLETED & IN SERVICE UNIT 1 REWIND COMPLETED BUT BALANCING ISSUE Disassembly & Shrink Rim September 2017 Target Date to Re-Start Commissioning CANYON FERRY PLANT REHAB UNIT 1 WINDING FAILURE – Repaired and De-Rated Unit PLANT ASSESSMENT WITH TVA ASSISTANCE ASSESSMENT REPORT IN SEPTEMBER – Decisions on Recommendations FINALIZE SCOPE, COST ESTIMATE, SCHEDULE

4 RECLAMATION Managing Water in the West
CANYON FERRY SWITCHYARD RELOCATION SAFETY ISSUES ENVIRONMENTAL ISSUES EQUIPMENT ISSUES – OCB’s 64 Years Old PARTNERING WITH WAPA TO DEFINE SCOPE, COST, SCHEDULE BOYSEN & SEMINOE PLANT REHABS PLANT ASSESSMENTS WITH TVA ASSISTANCE ASSESSMENT REPORTS IN JULY 2018 FINALIZE SCOPE, COST ESTIMATE, SCHEDULE

5 RECLAMATION Managing Water in the West OVERALL POWER WORKPLAN
45 POWER RAX PROJECTS BEING WORKED ON IN FY 2017 CBT Plants Unit Vibration System Addition Green Mountain Penstock Relining Pole Hill Penstock Expansion Joint Packing Replacement Flatiron Unit Air Cooler Replacement Flatiron Penstock Interior Coating Repairs Flatiron High-Voltage Cable Tunnel Asbestos Abatment Flatiron Protective Relay Replacement Canyon Ferry Powerplant Roof Replacement Canyon Ferry Control Room Asbestos Ceiling Replacement Canyon Ferry Low Voltage Distribution System Replacement

6 RECLAMATION Managing Water in the West OVERALL POWER WORKPLAN
45 POWER RAX PROJECTS BEING WORKED ON IN FY2017 Yellowtail Low Voltage Distribution System Replacement Yellowtail Powerplant Sump Pumps Replacement Yellowtail Afterbay Sluiceway Stoplogs Refurbishment Fremont Canyon Unit Spiral Case Recoating Guernsey Spillway Gate Refurbishment Guernsey Powerplant Penstock Surge Tank Recoating Seminoe Facility Road Repair (Partnering with State/Federal) Shoshone Powerplant Roof Replacement

7 RECLAMATION Managing Water in the West OVERALL POWER WORKPLAN
11 PROJECTS IDENTIFIED TO BE COMPLETED IN FY 2017 Carter Lake Fiber Optic System Addition Flatiron Gatehouse/Gauging Station Fiber Optic System Addition Marys Lake Runner Replacment Design/Spec Big T Dille Diversion Structure Repair Canyon Ferry Elevator Replacement Yellowtail Dam Formed Drain Cleaning Glendo Dam Spillway Safety of Dams Modification Glendo Powerplant Bridge Crane Radio Control Addition Heart Mountain Powerplant Bridge Crane Replacement Kortes Powerplant AC/DC Distribution System Replacement Seminoe Dam Stilling Basin & Tailrace Concrete Repairs

8 RECLAMATION Fremont Canyon Powerplant Scroll Case/Draft Tube Refurb
Managing Water in the West Fremont Canyon Powerplant Scroll Case/Draft Tube Refurb Acquisition Division Missed Award Date Outage Slipped to FY 2018 vs Generation

9 RECLAMATION Managing Water in the West WSPC CUSTOMER UPFRONT FUNDING
FY 2015 = $22.5 MILLION FY 2016 = $29.6 MILLION FY 2017 = $33.3 MILLION FY 2018 = $10.6 MILLION THANK YOU !! P-S PROJECT USE PUMPING POWER 25 CONTRACTS DUE FOR RENEWAL IN 2020 EXISTING 2.5 MILLS/KWH WILL GO UP TO CURRENT RATE CURRENT RATE AT MILLS/KWH

10 RECLAMATION Managing Water in the West
POTENTIAL COST ALLOCATION CHANGES WYAO MICROWAVE SYSTEM WYAO SCADA SYSTEM INITIATE A CURRENT USE COST ALLOCATION STUDY POTENTIAL CHANGE FROM 100% POWER TO MULTIPURPOSE FINAL DECISION BY REGIONAL DIRECTOR