2 NA CONSOLIDATION & SAFETY SYSTEMS
Y. Kadi, F. Gautheron, E. Solodko, M. Wilhelmsson EA-LE Secondary Beams Retreat, April 2017

3 NA-CONS Study: Mandate 1/2
Deliver a comprehensive proposal for the North Experimental Area consolidation, including: All Beam related items Infrastructure & General Services Civil Engineering The proposal shall analyse the consolidation of the area in its present configuration + alternative scenarios covering increased performance linked to future physics requirements in line with the on-going discussions in the ‘Physics beyond Collider’ working groups Y. Kadi, North Area Consolidation & Safety Systems

4 NA-CONS Study: Mandate 2/2
The final study shall address: cost and energy optimizations procurement options The final study shall propose implementation scenarios with all possible staging options, considering separately the periods: prior and during LS2 (highlighting urgent actions) between LS2 and LS3 as well as during LS3 Urgent actions required before and during LS2 shall be highlighted. Y. Kadi, North Area Consolidation & Safety Systems

5 NA-CONS Study: Members 1/2
Dept Groups Consolidation Upgrade EN ACE: Fences, layout database, survey CV: Cooling and Ventilation EA: Coordination, mechanical equipt, integration, Gas & Vacuum EL: Electrical infrastructure, cabling and HT-supply HDO Safety: Safety diagnostics and Safety files HE: Heavy handling, transport and cranes MME: CEDAR renovation, fabrication on request of other groups STI: Targets, motor control, LOKN X BE ABP: studies for proton distribution and sharing (PBC, BDF, etc) ASR Safety: Safety files BI: Instrumentation (e.g. XBPF) CO: Cesar ICS: Access, safety systems in general OP: For agreement/primary beam RF: if RF separated beam in PBC context (activities list only examples, not exhaustive) Y. Kadi, North Area Consolidation & Safety Systems

6 NA-CONS Study: Members 2/2
Dept Groups Consolidation Upgrade TE ABT: Septa, beam loss optimization, transfer lines CRG: Cryo experimental magnets, possibly EPC: Start of Power Convert. renovation studies & replacement HDO Safety: Safety files MPE: For first studies of Magnet/Machine Protection studies MSC: For magnets VSC: For vacuum controls and vacuum in primary transfer lines X IT CS: For IT networks HSE General Safety incl. RP EP Users requirements, Safety SMB SE: Civil Engineering & building consolidation (metal Structures) (activities list only examples, not exhaustive) Y. Kadi, North Area Consolidation & Safety Systems

7 NA-CONS Study: Schedule
Manpower needs/requests for LS2 related activities should be presented LS2 DAYS=> need to know what to do by mid-summer !! Manpower needs/requests for urgent actions + consolidation should be CHAMONIX The final report is expected by December 2017 Y. Kadi, North Area Consolidation & Safety Systems

8 NA-CONS Study: Proposed Roadmap
Identify most urgent items 2017/2018 and secure budget Define WBS/PBS and prepare related project documents Discuss with concerned groups & participate to the safety diagnostic (carried out by EN-DSO) Identify Consolidation/Upgrade activities together with resources and budget needs Y. Kadi, North Area Consolidation & Safety Systems

9 North Area Consolidation budget request for 2017
Dep Group BC Budget Code Description New Budget 2017 Comments and details: BE BI 64312 NA Target Consolidation - TBIU/D 15000 To cover negative carry-over and open committment ICS 72188 Gas detection SPS exp. areas (N+W) 90000 Project shared with 63462(GIF++ operation) EN CV 53596 Replacement of the ventilation units in the NA PC rooms finished 53597 Ventilation underground NA62 53598 NA-CONS 31-C_P_R-NA Underground Ventilation 330000 Control system for the TCC2 ventilation system. To cover the committment and FSU costs 53610 Chilled water piping North Area 465000 Chilled water renovation to TT85/TDC85 and improved AC in BA82 , AC in Cryo room in EHN2 53641 North area cooling towers control System postponed EA 63308 Collimators renovation in the NA beamlines 150000 Renovation of 9 collimators (EA) 4 in TCC2, 4 in K12 and 1 in H8 63309 Beam line items renovation EA 54000 PJAS for Cesar (with BE/CO), 2 Fellows for the NA-Cons study, TTE for test bench, dry vacuum pumps in high radiation areas and other some urgent EA items EL 53654 NA-CONS Electric Infrastructure in target area HE 53324 Crane renovation EHN1 STI 63310 Production target upgrade 20000 remaining committement and close the code 63311 Collimator TCSC request from EN STI (details missing) 63316 SPS North Area 63720 NI Consolidation - ATB movable devices no request HSE RP 57399 RP for North Area Consolidation The previous budget transfered to 63307 SMB SE 76388 North area consolidation civil engineering 25000 Reserve for urgent building works (as sanitary..) TE CRG 99571 NA62 Consolidation 36000 Carry forward (APT update required) EPC 99630 Electronics for North Area Power Convertors on PS-CONS MSC 99177 North Area Magnet system Consolidation 100000 Replacement of zero-field probe, exchange of manifolds, ELETTA refurbishing, renovation of electrical interconnections 63307 Urgent Safety Requirements (former RP buffer zone) 410000 See comment on 57399: Buffer zone etc for TCC2 SUSI for EHN2 SUSI system for the Compass building (EHN2) Gas building/network renovation Gas safety measures: purging systems, redondant safety valve, and replacing faulty anti return valves Urgent safety items in EHN1 ODH-detection and stairways in relation to the galleries (with BE/ICS) Demineralized water system Expansion system for the demineralized water station in EHN1 (on any CV-CONS code) New requests for 2017 EN ACE New item Survey consolidation work 10000 alignment of beam elements, marking of beamline and others survey requests from North Area Y. Kadi, North Area Consolidation & Safety Systems

10 North Area Consolidation & Safety Systems
Preliminary PBS/WBS 1/6 Department Group Budget Code PBS Activity description Priority level Status Budget 2017 [kCHF] Budget 2018 [kCHF] Budget 2019 (LS2) Budget 2020 (LS2) Budget 2021 [kCHF] Budget 2022 [kCHF] Budget 2023 [kCHF] 1 Infrastructure 1.1 Electrical Network EN EN-EL 53654 Low voltage network renovation of obsolete equip. PLC system, AUL, AUG, 48V High voltage network renovation. Halogen free cables BA80 (889) System 48V/ Tableaux electriques/ cables removal/ new cabling… BA81 (890) System 48V/ Tableaux electriques/ cables removal/ new cabling… BA82 (891) System 48V/ Tableaux electriques/ cables removal/ new cabling… BB81 (895) System 48V/ Tableaux electriques/ cables removal/ new cabling… BAA85 System 48V ECN3 equipment obsolete, coffrets prises, divers tableaux electriques, cables… 918 - coffrets prises/ tableaux, decablage, recablage,.. 918 UPS system 887 - Tableaux electriques, coffrets prises, chemins cables, depose elements obs. 888 - Tableaux electriques, coffrets prises, chemins cables, depose elements obs. TCC2/TDC2 signal and control cabling campaign TCC2/TDC2 lighting system/ low voltagew network BA80 (889) Tableaux ERD (9) + transformers (9) + tableaux EMD (9) BA81 (890) Tableaux ERD (10) + transformers (10) + tableaux EMD (28) BA82 (889) Tableaux ERD (3) + transformers (3) + tableaux EMD (11) HT AC cabling (?) DC cabling (?) 1.2 Communication Network IT IT-CS IT network (computing, mobile phones,..) 1.3 Handling SMB SMB-SE 53324 Crane renovation (EHN1) 53324 (?) Crane renovation (other buildings) EN-HE 887 (EHN1) crane PR-0179 replacement 887 (EHN1) crane PR-0534 revamping 886 (TCC2) crane PR-0537 revamping 887 (EHN1) crane PR-0538 revamping 888 (EHN2) crane PR-0539 replacement 886 (TCC2) crane PR-0544 replacement 888 (EHN2) crane PR-0545 replacement 887 (EHN1) crane PR-0550 replacement 887 (EHN1) crane PR-0552 replacement 900 (ECN3) crane PR-0560 revamping TDC2: TIM (remote technical inspection module) Manpower (Crane drivers) during renovation Y. Kadi, North Area Consolidation & Safety Systems

11 North Area Consolidation & Safety Systems
Preliminary PBS/WBS 2/6 Department Group Budget Code PBS Activity description Priority level Status Budget 2017 [kCHF] Budget 2018 [kCHF] Budget 2019 (LS2) Budget 2020 (LS2) Budget 2021 [kCHF] Budget 2022 [kCHF] Budget 2023 [kCHF] 1.4 Buildings & Tunnels SMB SMB-SE 76388 EHN1 (887) renovation (roof, walls, floor, doors, ligthing, sanitaries,..) EHN2 (888) renovation BA80 (889) renovation BA81 (890) renovation 891 renovation 893 renovation BB81 (895) renovation BX82 (906) renovation 907 renovation 908 renovation 909 renovation 911 renovation BZ80 (912) renovation 918 renovation 920 renovation BX80 (902) renovation Roads & sewage TCC2/TDC2 Drain network maintenance TCC2/TDC2 CE consolidation NA consolidation civil engineering (urgent building works) 25 Asbestos removal EHN1 (887) smoke extraction EHN2 (888) smoke extraction BA80 (889) smoke extraction BA81 (890) smoke extraction BB81 (895) smoke extraction 918 smoke extraction Other buildings smoke extraction Refurbish counting rooms,safety conformity Lifts renovation Users building (887, others?) Exterior grounds & parkings New tunnels and building design and construction (BDF, PBC, ..) EN EN-CV 53596 Remplacement of ventilation units in the NA PC rooms 53598 control for the TCC2 ventilation system (material + FSU) 330 EA 63307 EHN1: ODH detection and stairways in relatio n to the galleries 70 Gas building/ network renovation (redundant safety valves,..). 100 EN-EA EHN1: remove workshop from building BE BE-ICS EHN1, EHN2, ECN3: electronic locks for control rooms/ fenced areas EHN1, EHN2: restrict access to underground galleries. Y. Kadi, North Area Consolidation & Safety Systems

12 North Area Consolidation & Safety Systems
Preliminary PBS/WBS 3/6 Department Group Budget Code PBS Activity description Priority level Status Budget 2017 [kCHF] Budget 2018 [kCHF] Budget 2019 (LS2) Budget 2020 (LS2) Budget 2021 [kCHF] Budget 2022 [kCHF] Budget 2023 [kCHF] 1.6 Cooling and ventilation EN EN-CV 53597 (NA62) Ventilation systems for buildings and tunnels 53396 Ventilation systems for counting rooms 53597 Ventilation underground NA62 53610 Chilled water system / pipes network 465 53641 (?) Raw water system / network any CV cons code Demineralised water supply (EHN1 and others) Cooling towers maintenance/renovation/control 889 (BA80) ventilation system: Electricity/Automation 889 (BA80) Ventilation system: Air Handling units 889 (BA80) Demineralized water : Regulation and safety valves 889 (BA80) Demineralized water : Pumps soft starters 890 (BA81) ventilation system: Electricity/Automation 890 (BA81) Ventilation system: Air Handling units 980 (BA81) Chilled water: installation sand filters 890 (BA81) Ventilation: Replacement of 3 AHU in computer room 890 (BA81 Demineralized water : Regulation and safety valves 890 (BA80) Chilled water: Chillers, Electricity, Control and distribution pumps 895 (BB81) ventilation system: Electricity/Automation 895 (BB81) Ventilation system: Air Handling units 997 (BG810) Ventilation 887 (EHN1) Ventilation (HVAC) of the hall 887 (EHN1) Ventilation (air conditioning) of counting baracks 887 (EHN1) Demineralised water: cooling? 891 (BA82) ventilation system: Electricity/Automation 891 (BA82) Ventilation system: Air Handling units including 4 units for computer room 981 (BA82) Raw water: regulation and safety valves, drinking water 891 (BA82) Demineralised water: pump soft starters 908 (BG82) Ventilation 906 (BX82) Ventilation 888 (EHN2) ventilation experiment NA58 888 (EHN2) Air handling units, AC barracks, and demin water cooling 883 (BY82) ventilation building GD 918 (BX83) Ventilation (done in 2015?) 918 (BX83) Chilled water: renovation of network 920 (BG83) Ventilation ( and build 911, 912) 893 (CT2) Raw water: revision pumps, control system, guillotine valves 893 (CT2) Raw water: modif of waster water collector (eaux usees, bypass valve) Galleries Ventilation: replacement of 20 AHU incl. electricity and automation Galleries: Chilled water: replacement of pipe network TDC2: Demineralised water (replacement of manual valves) ECN3: Demineralised water (modif of cooling station (started in 2015, done?) BG4, BG5, BG811, BG82, BG83: ventilation BA82: Chilled water for ventilation BB81: Chilled water for ventilation CT2: concrete repair to roof 860: supervision for compressed air BA80, 81, 82: revision of motor pumps NA: consolidation of the sump-pumps TCC2/TDC2: AHU new control TCC2/TDC2: Chilled water renovation 893 (CT2): NA cooling towers control system and reject water BA80, 81, 82: replacement of control system for cooling TCC2: cooling coils on three AHU replacement, piping evaporator Y. Kadi, North Area Consolidation & Safety Systems

13 North Area Consolidation & Safety Systems
Preliminary PBS/WBS 4/6 Department Group Budget Code PBS Activity description Priority level Status Budget 2017 [kCHF] Budget 2018 [kCHF] Budget 2019 (LS2) Budget 2020 (LS2) Budget 2021 [kCHF] Budget 2022 [kCHF] Budget 2023 [kCHF] 1.7 Cryogenics TE TE-CRG 99571 (NA62) Cryogenic hardware (dewars, lines, cold box, valves,…) Cryogenic controls migration, new control 99571 NA62 consolidation 36 NA61 and ATLAS H8 cryo station NA58 CB and distribution maintenance. Upgrade needed? 1.8 Experimental Gases EN EN-EA Gas buildings and associated controls ? Gas points and distribution in exp. Halls 1.9 Safety systems HSE Safety alarm systems (fire, ODH,…) TCC2/TDC2: General safety system BE BE-ICS Acces systems renovation (BA80, BA81 zones, new safety chains) HSE-RP 57399 (NA CONS) RP monitoring EN-HDO Documentation & safety files 2 Beam Lines and Experimental Areas 2.1 Magnets TE-MSC 99177 laminated magnets & spares (also BE-CO listed as concerned section) magnets & spares TE-MPE Magnet safety & protection systems BIS system for NA beam lines North Area Magnet system consolidation 100 NA Magnet interlock wiring EN-CV Cooling system BA80: Consolidation of null probe crates BA80: Renovation rack interlock BA81: Renovation rack interlock BA82: Renovation rack interlock TT81-85, EHNx, TCC8: Remplacement Electrovannes TT81-85, EHNx, TCC8: Nettoyage filtre aimant TT81-85, EHNx, TCC8: Remplacement anti-retour TT81-85, EHNx, TCC8: Mise en place shunt interlock TT81-85, EHNx, TCC8:Remplacement Joint Raccord Walther TT81-85, EHNx, TCC8:Remise en etat Eletta TT81-85, EHNx, TCC8:Remplacement interconnexion puissance TCC2/TDC2: Magnet cooling upgrade ECN3: change power cables to halogem-free TE-EPC BA80/BA81: renovation of power converters BA80/BA82: EPC.17, NA, SBA BA80/BA82: EPC.17-IEFC update Y. Kadi, North Area Consolidation & Safety Systems

14 North Area Consolidation & Safety Systems
Preliminary PBS/WBS 5/6 Department Group Budget Code PBS Activity description Priority level Status Budget 2017 [kCHF] Budget 2018 [kCHF] Budget 2019 (LS2) Budget 2020 (LS2) Budget 2021 [kCHF] Budget 2022 [kCHF] Budget 2023 [kCHF] 2.2 Beam Safety Systems HSE HSE-RP 57399 Exp. Area safety systems EN EN-EA RP monitoring 63307 Beam Interlock system for the NA BE BE-ICS SUSI system for EHN2 (EN-EA contribution ?) 40 Experiemental areas acces control/ analysis of needs and test TCC2/TDC2: Optimisation & follow-up ALARA recommandations TCC2/TDC2: Manpower EN-EA during renovation EHN2 : RP monitoring upgrade to RAMSES EHN1 : RP monitoring upgrade to RAMSES TCC2/TDC2 : RP monitoring upgrade to RAMSES TCC2/TDC2: work site follow-up (supervision, cleaning, consumables, waste) EN-HDO Safety diagnostics and files 2.3 Electrical Power Systems TE TE-EPC 99630 Power Converters for main bends & spares Power Converters for quads and other magnets & spares TE-MSC Change power cables to halogen free 2.4 SBA provisions 63309 Scanning tables Structured cabling for the Exp. Areas Controls software for secondary beams TE-VSC Vacuum & control in primary transfer lines SBA Vacuum systems EN-ACE Beam lines survey - layout areas- CAD drawings (with EN-EA?) 2.5 Beam obstacles EN-STI TCC2-TCC8 TBIU/D monitors consolidation 15 TCC2: new ion pumps for the monitors TBIU/D TCC2/TDC2: vacuum chamber replacement + new ion pumps BE_BI TCC2: Replacement of 6 TBIU/TBID for TAX 63311 TDC2: Collimators (TCSC request from M. Calviani) TDC2 Spare collimators 63308 Renovation of 9 collimators (4 in TCC2, 4 in K12, 1 in H8) 150 63316 SPS NA (request from M. Calviani) North Area controls TAXs 63310 TCC2/TDC2 Primary target upgrade 20 63720 Obstacles Y. Kadi, North Area Consolidation & Safety Systems

15 North Area Consolidation & Safety Systems
Preliminary PBS/WBS 6/6 Department Group Budget Code PBS Activity description Priority level Status Budget 2017 [kCHF] Budget 2018 [kCHF] Budget 2019 (LS2) Budget 2020 (LS2) Budget 2021 [kCHF] Budget 2022 [kCHF] Budget 2023 [kCHF] 2.6 Beam Instrumentation EN EN-EA 63309 MWPC renovation BE BE-BI MWPC replacement by scintillating fiber beam profile monitor Install patch cabling Electronics BI electronics BI supports Particle identification devices BE-CO Cesar- control system for secondary beams Instrumentation EN-MME CEDAR renovation TE TE-VSC Vacuum chambers replacement BE-RF RF separation for M2 beamline (PBC) BE-ABP Studies for new beamlines, beam distribution, beams haring (PBC) 907 Renovation of gas system 908 (BG82) Renovation of gas system 909 (BG811) Renovation of gas system 920 (BG83) Renovation of gas system 2.7 Experimental Areas EP Users requirements EP-HDO Safety removal of obsolete cabling and material BE-ICS 72188 907, 908, 909, 920 Gas detection SPS exp. Areas (N+W, GIF++) 90 SMB Internal baracks renovation & false floors EN-EL electrical networks CAD update EN-CV Cooling and ventilation repair/renovation 887 (EHN1) Hydraulic lifting table and mechanical systems 887 (EHN1) Renovation of gas network 888 (EHN2) Renovation of gas network ECN3 Renovation of gas network NA: Public adress system for Exp. Areas 2.8 Auxiliaries activities Y. Kadi, North Area Consolidation & Safety Systems

16 NA-CONS Study: Proposed Roadmap
Identify most urgent items 2017/2018 and secure budget Define WBS/PBS and prepare related project documents Discuss with concerned groups & participate to the safety diagnostic (carried out by EN-DSO) Identify Consolidation/Upgrade activities together with resources and budget needs Y. Kadi, North Area Consolidation & Safety Systems