Download presentation
Presentation is loading. Please wait.
Published byJocelyn Mosley Modified over 6 years ago
1
Railway Development in Ottawa From Colonel By to the O Train Part 5 1980 to 2010
Colin J. Churcher
2
Ottawa Area
3
Periods of Development
Early local railways. Part of national network. Consolidation of companies. Commencement of route reduction. Elimination of cross town tracks and rationalization. Reduction of the network. 1995 to date Rise of short lines and the O Train. These dates are approximate and overlap each other.
4
1982
5
1984 CPR Ellwood spur abandoned
6
1986-1
7
1986-2
8
1990
9
1991
10
1992
11
1993
12
1997, September 9 Eddy service reinstated
13
Airport Spur
14
1999
15
1999, Oct HCW LamanCH Airport Road
16
2002 N&S Freight shed leads removed.
17
2003 Ellwood connection removed
18
2008 CN acquires Ottawa Central
19
2010 Gatineau acquires QGR
20
Thank You Colin J. Churcher
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.